Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Provide single fuel drop with prime and start #2 fuel fill tank. Please report any problems immediately to esb fuel unit. (212) 863-8781 Date: December 14, 2011 Permit type: Util | Permit id: Ec15343 | |||||
Provide single fuel drop with prime and start #2 fuel fill tank.. Please report any problems immediately to esb fuel unit. (212) 863-8781 Date: March 26, 2008 Permit type: Util | Permit id: E827175 | |||||
Provide single fuel drop 5 gallons #2 fuel fill/tank and prime & start boiler. Date: November 30, 2000 Permit type: Util | Permit id: E110602 | |||||
Supply and install new relay and vaccum clean. Restore heat to building. Note: contractor must contact h. P. D. @(718) 636-3015, 3027, 3048, and 30 Date: March 31, 2008 Permit type: Heat | Permit id: E827378 | |||||
Provide single fuel drop 5 gallons #2 fuel fill tank and prime & start boiler. Date: November 30, 2000 Permit type: Util | Permit id: E110602 | |||||
As per rc #20020007864 (emsl), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-3050-74 method Date: December 6, 2002 Permit type: Delead | Permit id: E310793 | |||||
Provide single fuel drop. 10 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb f Date: February 21, 2002 Permit type: Util | Permit id: E215176 | |||||
(apt. #2l) trace, locate and repair all leaks thoughout kitchen exterior wall and ceiling (perform necessary pointing to exterior walls). Restore ce Date: November 17, 2004 Permit type: Gc | Permit id: E512543 | |||||
Apartment# 2l: demo entire kitchen ceiling. Provide and install new 5/8 sheetrock at kitchen ceiling tape and compound 2 coats. Remove all work r Date: November 9, 2001 Permit type: Gc | Permit id: E207973 | |||||
Public area: replace with new all gutters and leaders. Note: contractor must call lydia santos at (718) 254-89 or sharon joseph at (718) 254-8 Date: November 20, 2001 Permit type: Gc | Permit id: E207971 | |||||
Provide single fuel drop. 5 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up an drunning upon compleltion of drop or esb f Date: March 13, 2002 Permit type: Util | Permit id: E216392 | |||||
Make all necessary repairs to #2 oil boiler to restore to proper working order. Restore hot water to building. Note: contractor must contact hpd a Date: August 27, 2004 Permit type: Heat | Permit id: E506494 | |||||
Provide labor and materal to remove mold and mildew from 2 sqft section in bathroom. Replace approx. 12 sqft. Of sheetrock ceiling in kitchen. Pai Date: November 7, 2001 Permit type: Gc | Permit id: E207868 | |||||
Apartment# 2l: demo entire kitchen ceiling. Provide and install new 5 8 sheetrock at kitchen ceiling tape and compound 2 coats. Remove all work r Date: November 9, 2001 Permit type: Gc | Permit id: E207973 | |||||
Apartment# 1r: locate and repair leaks from above apartment bathroom. Restoration to all areas affected by your work. Note: contractor must cal Date: October 24, 2001 Permit type: Gc | Permit id: E206969 | |||||
Local law #1 violation : as per rc #2003002584202 (abax)and attached scope of work thoroughly remove all lead violations as per new york city adminis Date: November 3, 2004 Permit type: Delead | Permit id: E511493 | |||||
Remove entire bathroom ceiling trace and fix all leaks replace parts as needed. Install new gwb on ceiling tape and compound (35 sq ft) prime and p Date: October 19, 2004 Permit type: Gc | Permit id: E510246 | |||||
Supply and install a new wash basin to replace the defective wash basin in the bathroom. Remove all work related debris. Note: contractor must co Date: October 12, 2004 Permit type: Plumb | Permit id: E509584 | |||||
As per rc #2005001319002 (enviro-probe, inc.), perform total lead analysis of 21 dust wipe sample(s) via environmental protection agency (epa) sw845- Date: December 21, 2004 Permit type: Delead | Permit id: E515737 | |||||
(apt. #3l) provide and install a new lb. Capsheet, approx 1,5 sq. Ft. On entire roof, flash and seal all seams and joints. Remove all work rela Date: September 21, 2004 Permit type: Gc | Permit id: E508237 | |||||
Provide single fuel drop with prime and start. #2 fuel. Fill tank. Please report any problems immediately to esb fuel unit. 212-863-8779 Date: January 31, 2005 Permit type: Util | Permit id: E519807 | |||||
As per rc #2005001319001 (enviro-probe, inc.), perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: December 27, 2004 Permit type: Delead | Permit id: E516120 | |||||
As per rc #2005001319001 (enviro-probe, inc.), perform total lead analysis of 2 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: February 3, 2005 Permit type: Delead | Permit id: E520421 | |||||
Provide single fuel drop with prime and start. #2 fuel. Fill tank. Please report any problems immedialty to esb fuel unit. 212-863-8779 Date: December 15, 2004 Permit type: Util | Permit id: E514835 | |||||
As per rc #2005001319001 (enviro-probe, inc.), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845- Date: March 11, 2005 Permit type: Delead | Permit id: E524170 | |||||
Replace broken window and frame in livingroom, with new thermo double hung aluminum, window. Remove all work related debris. Note: contractor must Date: February 9, 2005 Permit type: Gc | Permit id: E520735 | |||||
Local law #1 violation : as per rc #2003002584202 (abax). And attached scope of work thoroughly remove all lead violations as per new york city admin Date: November 17, 2004 Permit type: Delead | Permit id: E512417 | |||||
(apt.#3l) replace thermostat and restore boiler to adequate heat at entire building. Note: contractor must contact hpd @ (718) 636-3021, 636-302 Date: February 4, 2005 Permit type: Heat | Permit id: E520635 | |||||
Apartment #1l: replace entire broken waste line under kitchen sink. Note: contractor must contact hpd @ (718) 636-3021, 636-3026, 636-3056 with st Date: September 21, 2004 Permit type: Plumb | Permit id: E508338 | |||||
Apartment 1-l) abate the present mold and mildew at the ceiling and walls in the bathroom. Restore ceiling and walls in the bathroom to its original Date: August 25, 2004 Permit type: Gc | Permit id: E506198 | |||||
Apartment #1l: apt. 1l: restore cold water to bathroom fixtures; tub and water closet. Replace defective pipes as necessary! Note: contractor mu Date: May 24, 2004 Permit type: Plumb | Permit id: E424291 | |||||
As per rc #20020007864 (emsl), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-3050-74 method Date: April 29, 2002 Permit type: Delead | Permit id: E219151 | |||||
Bathroom: disconnect the leaky defective shower body and replace it with a one lever shower body. Restore 10sf the affected tiled area to the origina Date: April 4, 2005 Permit type: Plumb | Permit id: E526792 | |||||
Apt. #2-l: scrape and plaster kitchen wall approx. Sq. Ft. Of walls. Prime with stain killer and paint 2 coats entire room. Scrape and plaster be Date: July 21, 2004 Permit type: Gc | Permit id: E503678 | |||||
Apartment# 3l: replace with new the radiator valve and vents at apartment# 3l. Apartment# 2l remove damaged ceiling and patch to match with new 5/8 Date: February 7, 2002 Permit type: Gc | Permit id: E213582 | |||||
Apt 2l: as per the requirements contract with hpd, provide and install (4) window guards and repair (2) window guards throughout entire apartment. Date: April 9, 2012 Permit type: Gc | Permit id: Ec26364 | |||||
As per rc #2004000467903 (enviro-probe, inc.), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: August 25, 2004 Permit type: Delead | Permit id: E506838 | |||||
As per rc #2005001319001 (enviro-probe, inc.), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845- Date: June 21, 2005 Permit type: Delead | Permit id: E534869 | |||||
As per rc #2005001319001 (enviro-probe, inc.), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: May 16, 2005 Permit type: Delead | Permit id: E530807 | |||||
Abate mold and mildew in bathroom walls and ceiling (125sq. Ft.). Prime and paint repair walls an ceiling. Note: contractor must sign and return wi Date: May 6, 2005 Permit type: Gc | Permit id: E530383 | |||||
Apartment # 2-l: replace entire kitchen ceiling, including gypsum wall board taping and painting. Remove work related debris. Note:contractor mus Permit type: Gc | Permit id: E208687 | |||||
Apartment # 2-l: replace entire kitchen ceiling, including gypsum wall board taping and painting. Remove work related debris. Note:contractor mus Permit type: Gc | Permit id: E208687 | |||||
Apartment # 2-l: replace entire kitchen ceiling, including gypsum wall board taping and painting. Remove work related debris. Note:contractor mus Permit type: Gc | Permit id: E208687 | |||||
Apartment # 2-l: replace entire kitchen ceiling, including gypsum wall board taping and painting. Remove work related debris. Note:contractor mus Permit type: Gc | Permit id: E208687 | |||||
Apartment# 3l: replace with new the radiator valve and vents at apartment# 3l. Apartment# 2l remove damaged ceiling and patch to match with new 5 8 Date: February 7, 2002 Permit type: Gc | Permit id: E213582 | |||||
Apartment # 2-l: replace entire kitchen ceiling, including gypsum wall board taping and painting. Remove work related debris. Note:contractor mus Permit type: Gc | Permit id: E208687 | |||||
Roof - thermal & moisture protection Date: October 11, 2005 Permit type: 7afa | Permit id: E610861 | |||||
Provide automatic fuel delivery to the above building until furter notice #2 fuel. No prime and start necessary. Date: July 1, 2007 Permit type: Util | Permit id: E800895 | |||||
Con edison provide electirc to building public areas and heating plant/ hot water heater. Date: July 1, 2003 Permit type: Util | Permit id: E401435 | |||||
Con edison provide electirc to building public areas and heating plant/ hot water heater. Date: October 1, 2002 Permit type: Util | Permit id: E306268 | |||||
Interior scope Date: October 10, 2006 Permit type: 7afa | Permit id: E705210 | |||||
Provide automatic fuel delivery to the above building until furter notice #2 fuel. No prime and start necessary. Date: July 1, 2006 Permit type: Util | Permit id: E703814 | |||||
Con edison provide electirc to building public areas and heating plant/ hot water heater. Date: July 1, 2005 Permit type: Util | Permit id: E601596 | |||||
Make all necessary repairs to #2 oil fired boiler to restore to proper working order. Ensure adequate heat and hot water to entire building. Remove Date: February 6, 2006 Permit type: Heat | Permit id: E623797 | |||||
Public area: flash around skylight and roof of bulkhead, also flash entire bulkhead. Note: contractor must contact hpd @ (718) 636-3021, 636-3026 Date: August 17, 2004 Permit type: Gc | Permit id: E506151 | |||||
Interior scope Permit type: 7afa | Permit id: E703446 | |||||
Exterminate rodent and roaches from basement and entire building. Date: February 13, 2002 Permit type: Exterm | Permit id: E214265 | |||||
Con edison provide electirc to building public areas and heating plant/ hot water heater. Date: July 1, 2007 Permit type: Util | Permit id: E800129 | |||||
Provide automatic fuel delivery to the above building until furter notice #2 fuel. No prime and start necessary. Date: May 12, 2005 Permit type: Util | Permit id: E530678 | |||||
At roof: repair roof leak above 3rd story at public hall. Provide approx. S. F. Of roofing capsheet next to bulkhead door and approx. 16 Date: September 30, 2011 Permit type: Gc | Permit id: Ec08371 | |||||
Con edison provide electric to building public areas and heating plant/hot water heater. Date: May 4, 2005 Permit type: Util | Permit id: E530674 | |||||
Public area: supply and install pull handle to boiler room door. Supply and install fresh air louver at exsisting window in boiler room. Note: c Date: February 27, 2006 Permit type: Gc | Permit id: E625672 | |||||
P/a.: clear out sewer line at house trap out to street and back into house to clear entire sewer. Pump out water & sewage and sanitize basement with Date: April 19, 2002 Permit type: Stopag | Permit id: E218650 | |||||
Con edison provide electirc to building public areas and heating plant/ hot water heater. Date: July 1, 2006 Permit type: Util | Permit id: E702657 | |||||
Remove existing stair case between 3rd floor and roof provide a new complete stair case, with (18) treads, new railing and fire proof soffit. Plans an Permit type: Gc | Permit id: E512811 | |||||
Con edison provide electirc to building public areas and heating plant/ hot water heater. Date: July 1, 2004 Permit type: Util | Permit id: E502767 | |||||
Remove existing staircase between 3rd floor and roof; provide new staircase with 18 treads, new railing, and fireproof soffit; obtain necessary plans Date: December 6, 2004 Permit type: Gc | Permit id: E512809 | |||||
(apt. #3l) replace with new the defective skylight, seal and waterproof all adjacent arears, approx. Sq. Ft. Remove all work related debris. Date: October 4, 2004 Permit type: Gc | Permit id: E509245 | |||||
Public area: clear main sewer house trap from trap to street and from house trap into building. Pump out all water and sewage from basement. Vacuum Date: October 16, 2002 Permit type: Stopag | Permit id: E307029 | |||||
Public parts: replace with new 2 pieces of broken / missing wire glass at building entrance door. Also replace with new 1 piece of broken wire glass a Date: November 18, 2011 Permit type: Gc | Permit id: Ec11757 | |||||
(apt. 31l) install (2) battery operated smoke detectors at foyer areas. Remove all work related debris. Date: September 8, 2005 Value: $103 Permit type: Misc | Permit id: E607437 | |||||
Apt #3l. Bathroom, replace defective shower body. Replace tub and grout at shower body wall. Remove all work related debris. Date: February 4, 2005 Permit type: Plumb | Permit id: E520744 | |||||
Re - install two (2) window guard in bedroom re - install one widnow guard in hall re - install one window guard in bathroom Date: January 27, 2005 Value: $134 Permit type: Gc | Permit id: E519724 | |||||
Public area: 1st story public hall stairs; install three new wood tread riser: #4, #5, #6 steps. From 2nd. Landing down. Note: contractor mus Date: April 26, 2005 Value: $304 Permit type: Gc | Permit id: E529586 | |||||
Entire (apt.#3l) re-install (5) window guards. Date: November 4, 2004 Permit type: Gc | Permit id: E511853 | |||||
Apt #1r. Bathroom install (1) window guard and stops. Remove all work related debris. Note: contractor must contact hpd @ (718) 636-3021, 636-302 Date: June 14, 2004 Permit type: Gc | Permit id: E425892 | |||||
Public area: restart burner and restore hot water to building Date: August 13, 2004 Permit type: Heat | Permit id: E506238 | |||||
Apt# 1r kitchen install 1 w/g. Living rm reinstall 1 w/g bthrm install 1 w/g. Rm front install 1 w/g Date: January 14, 2004 Value: $196 Permit type: Gc | Permit id: E413330 | |||||
Apartment #1a: bathroom: install 1 window guard and stop. Date: June 9, 2003 Permit type: Gc | Permit id: E324435 | |||||
Erp ll/38 violation: as per attached scope of work thoroughly remove all lead violations as per new york city health section 173. 14 and as noted in t Date: November 18, 2002 Value: $952 Permit type: Delead | Permit id: E309657 | |||||
Apartment #1: front; install 2 window guards and stops. Middle; install 1 window guard and stop. Bath; install 1 window guard and stop. Kitchen; i Date: December 18, 2002 Value: $167 Permit type: Gc | Permit id: E311701 | |||||
Apt # 3-l bathroom: clean area around tub , caulk around tub. Repair trip lever over flow. Repair ceiling bathroom apt 2-l plaster 2 x2 Date: February 28, 2002 Value: $855 Permit type: Plumb | Permit id: E215587 | |||||
P/h: replace 3 missing balusters. Date: November 21, 2001 Value: $129 Permit type: Gc | Permit id: E209086 | |||||
Apt. 2l kit: cover floor with drop cloth. Demo approx. 12 sq. Ft.. Sheet rock ceiling 12 sq. Ft.. Plaster, tape and compound. Bag and remove all rubbi Date: January 11, 2001 Permit type: Gc | Permit id: E113651 | |||||
Apt 1-l ext: demo wall area 2 x 3 . Patch seetrock wall 2 x 3 . Tile and grout same area. Claulk around tub. Date: October 12, 2000 Value: $472 Permit type: Gc | Permit id: E106901 | |||||
Apt # 1-l bath: cover floor with drop cloth. Demo approx 6 sqft ceiling. Sheetrock ceiling 6 sqft. Plaster,tape and compound. Bag and remove all r Date: October 12, 2000 Value: $323 Permit type: Gc | Permit id: E106896 | |||||
P/a exit: install 2 missing balusters at 3rd sty landing, 9 at 2nd sty landing and 2 at 1st to 2nd sty stairs in public hall. Date: December 11, 2000 Value: $315 Permit type: Gc | Permit id: E111435 | |||||
Interior scope Permit type: 7afa | Permit id: E703446 | |||||
Remove existing stair case between 3rd floor and roof provide a new complete stair case, with (18) treads, new railing and fire proof soffit. Plans an Permit type: Gc | Permit id: E512811 | |||||
SCORE 89 Date: June 27, 2006 Contractor: Dimitrios Beroukis Client: Peter Nakos | Client Address: 6807 11 Avenue Brooklyn Ny 11219 | Client Phone: (718) 236-6866 | Client Company: Na | Permit status: Renewal | Permit id: 302189851 | |||||
SCORE 98 Date: August 10, 2006 Contractor: Mehmet Ekinci Client: Peter Nakos | Client Address: 6807 11 Avenue Brooklyn Ny 11219 | Client Phone: (718) 236-6866 | Client Company: Na | Permit status: Initial | Permit id: 302189851 | |||||
SCORE 59 Date: January 12, 2005 Contractor: Gurmi Singh Client: Eugene Mcardle | Client Address: 1 Gold Street New York Ny 10038 | Client Phone: (212) 863-7871 | Client Company: Hpd Div- Enforcement Services | Permit status: Initial | Permit id: 301885075 | |||||
Remove existing stair case between 3rd floor and roof provide a new complete stair case, with (18) treads, new railing and fire proof soffit. Plans an Permit type: Gc | Permit id: E512811 | |||||
Interior scope Permit type: 7afa | Permit id: E703446 | |||||
P a exit: install 2 missing balusters at 3rd sty landing, 9 at 2nd sty landing and 2 at 1st to 2nd sty stairs in public hall. Date: December 11, 2000 Value: $315 Permit type: Gc | Permit id: E111435 | |||||
P h: replace 3 missing balusters. Date: November 21, 2001 Value: $129 Permit type: Gc | Permit id: E209086 | |||||
Erp ll 38 violation: as per attached scope of work thoroughly remove all lead violations as per new york city health section 173. 14 and as noted in t Date: November 18, 2002 Value: $952 Permit type: Delead | Permit id: E309657 | |||||
Apt# 1r kitchen install 1 w g. Living rm reinstall 1 w g bthrm install 1 w g. Rm front install 1 w g Date: January 14, 2004 Value: $196 Permit type: Gc | Permit id: E413330 | |||||
Public parts: replace with new 2 pieces of broken missing wire glass at building entrance door. Also replace with new 1 piece of broken wire glass a Date: November 18, 2011 Permit type: Gc | Permit id: Ec11757 | |||||
Con edison provide electirc to building public areas and heating plant hot water heater. Date: July 1, 2004 Permit type: Util | Permit id: E502767 | |||||
Remove existing stair case between 3rd floor and roof provide a new complete stair case, with (18) treads, new railing and fire proof soffit. Plans an Permit type: Gc | Permit id: E512811 | |||||
Con edison provide electirc to building public areas and heating plant hot water heater. Date: July 1, 2006 Permit type: Util | Permit id: E702657 | |||||
P a.: clear out sewer line at house trap out to street and back into house to clear entire sewer. Pump out water & sewage and sanitize basement with Date: April 19, 2002 Permit type: Stopag | Permit id: E218650 | |||||
Con edison provide electric to building public areas and heating plant hot water heater. Date: May 4, 2005 Permit type: Util | Permit id: E530674 | |||||
Interior scope Permit type: 7afa | Permit id: E703446 | |||||
Con edison provide electirc to building public areas and heating plant hot water heater. Date: July 1, 2007 Permit type: Util | Permit id: E800129 | |||||
Con edison provide electirc to building public areas and heating plant hot water heater. Date: July 1, 2005 Permit type: Util | Permit id: E601596 | |||||
Con edison provide electirc to building public areas and heating plant hot water heater. Date: October 1, 2002 Permit type: Util | Permit id: E306268 | |||||
Con edison provide electirc to building public areas and heating plant hot water heater. Date: July 1, 2003 Permit type: Util | Permit id: E401435 | |||||
SCORE 89 Alteration Date: May 5, 2017 Contractor: Three Gloves Construction Permit status: Permit issued | Permit id: 32149638701 | |||||
Remove existing stair case between 3rd floor and roof provide a new complete stair case, with (18) treads, new railing and fire proof soffit. Plans an Permit type: Gc | Permit id: E512811 | |||||
Interior scope Permit type: 7afa | Permit id: E703446 | |||||
Make all necessary repairs to #2 oil boiler to restore to proper working condition. Restore running hot water to apartment #1l. Note:contractor mu Date: April 30, 2002 Permit type: Heat | Permit id: E219007 | |||||
As per rc #20020007864 (emsl), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method u Date: May 16, 2002 Permit type: Delead | Permit id: E220256 | |||||
Provide single fuel drop. 10 gallons, # 2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb Date: May 15, 2002 Permit type: Util | Permit id: E220212 | |||||
Provide single fuel drop with prime and start. #2 fuel. Fill tank. Please report any problems immedialty to esb fuel unit. 212-863-8779 Date: March 21, 2005 Permit type: Util | Permit id: E524938 | |||||
Provide single fuel drop. #2 fuel. Delivery limit = 10 gallons. Prime and start boiler. Boiler must be up and running upon completion of drop or es Date: September 30, 2002 Permit type: Util | Permit id: E306197 | |||||
Replace defective thermostat clock type from apartment #2r. Relocate to public hallway on 2nd floor with lock box. Install new petro meter on tank s Date: October 22, 2002 Permit type: Heat | Permit id: E307431 | |||||
Boiler room has a new boiler make necssary repairs to number #2 oil fire steam boiler and burner, and restore to proper working order. Note: contr Permit type: Heat | Permit id: E424438 | |||||
Provide single fuel drop with prime and start. # 2 fuel. Fill tank. Please report any problems immediately to esb fuel unit [212] 863-5149. Date: May 10, 2004 Permit type: Util | Permit id: E423390 | |||||
Apt#. 1l: remove bathroom ceiling. Trace, locate & repair leaks; replace parts as needed. Provide & install new water resistant sheet rock. Tape, Date: April 26, 2002 Permit type: Gc | Permit id: E218593 | |||||
Make all neccessary repairs needed to restore oil boiler to proper working condition. Note: contractor must contact hpd @(718) 636-3021, 636-3027, Date: May 28, 2004 Permit type: Heat | Permit id: E424638 | |||||
Apt 1l repair the defective cold water line and restore cold water to the bathroom. Restore water closet to proper working order. Note: contractopr Date: May 18, 2004 Permit type: Plumb | Permit id: E423635 | |||||
(apt. #1l) repair window balances at bedroom and kitchen. Remove all work related debris. Contractor must sign and return bid. Contractor Date: August 30, 2005 Permit type: Gc | Permit id: E606012 | |||||
Provide single fuel drop. 5 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb fu Date: February 6, 2002 Permit type: Util | Permit id: E214272 | |||||
Provide single fuel drop. 10 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb f Permit type: Util | Permit id: E307440 | |||||
Remove apartment 1l bathroom ceiling. Trace and repair all leaks. Replace tub waste and fittings. Replace ceiling approximately square feet. Sc Date: April 25, 2001 Permit type: Gc | Permit id: E120398 | |||||
(apt. #1l) exterminate entire apartment for mice and roaches. Remove all work related debris. Contractor must sign and return bid. Contr Date: August 29, 2005 Permit type: Exterm | Permit id: E606015 | |||||
Apartment #1l. Provide and install a new face basin with vanity and provide new hot and cold lines with shut off valves basin stops from basement to Date: September 8, 2005 Permit type: Plumb | Permit id: E607125 | |||||
Boiler room has a new boiler make necssary repairs to number #2 oil fire steam boiler and burner, and restore to proper working order. Note: contr Permit type: Heat | Permit id: E424438 | |||||
Provide single fuel drop. 10 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb f Permit type: Util | Permit id: E307440 | |||||
Provide single fuel drop. 10 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb f Permit type: Util | Permit id: E307440 | |||||
Boiler room has a new boiler make necssary repairs to number #2 oil fire steam boiler and burner, and restore to proper working order. Note: contr Permit type: Heat | Permit id: E424438 | |||||
Provide single fuel drop. 10 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb f Permit type: Util | Permit id: E307440 | |||||
Boiler room has a new boiler make necssary repairs to number #2 oil fire steam boiler and burner, and restore to proper working order. Note: contr Permit type: Heat | Permit id: E424438 | |||||
Provide single fuel drop. 10 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb f Permit type: Util | Permit id: E307440 | |||||
Boiler room has a new boiler make necssary repairs to number #2 oil fire steam boiler and burner, and restore to proper working order. Note: contr Permit type: Heat | Permit id: E424438 |