Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 New tri-plex, 100% affordable. Three addresses: 47 14th, 2 bdrm, 1 bath; 1401 zamia, 3 bdrm, 2 bath; 1405 zamia 2bdrm, 1bath. Lot 1, block 9, holiday neighborhood. Client: James Leach,Nolan Leach | Applicant: Coburn Development Inc | Permit type: Building, electrical | Permit status: N&v | Current use: Single family a | |||||
SCORE 59 Construction of three, two-story townhome units. Each unit has three bedrooms and one and a half bathrooms. There are four unenclosed, off street parking spaces north of the building. See adr2011-00007 for modifications to original approvals. Client: For Habitat | Applicant: Habitat For Humanity And | Permit type: Building, electrical | Permit status: Co | Current use: Multifamily dwe | |||||
SCORE 100 Set new 1inch domestic meter pit for 3-unit townhome, (see pmt2011-03222 for fees and meter) Date: January 17, 2012 Contractor: Nixcavating Inc Client: For Habitat | Applicant: Nixcavating, Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Installation of a sign for habitat for humanity -- 11 sf Date: March 9, 2012 Contractor: Broomfield Sign Co. Inc Client: For Habitat | Applicant: Broomfield Sign Co., Inc. | Permit type: Sign | Permit status: Cmp | Completion date: May 30, 2012 | |||||
SCORE 95 New sprinkler system for multi-family residence Date: March 2, 2012 Contractor: H2o Fire Protection Inc Client: For Habitat | Applicant: H2o Fire Protection Inc | Permit type: Fire | Permit status: Iss | Current use: Multifamily dwe | |||||
SCORE 100 Install 2inch fireline to building, 4inch tap and valve reqfootd. Also, set new 3 4inch irrigation meter and pit. (see pmt2011-03222 for meters and fees) Date: April 25, 2012 Contractor: Nixcavating Inc Client: For Habitat | Applicant: Nixcavating, Inc | Permit type: Fire, water, right-o | Permit status: Iss | Current use: Multifamily dwe | |||||
SCORE 100 New fire alarm system for habitat for hummanity multi-family dwelling Date: June 12, 2012 Contractor: Trident Security Systems Client: For Habitat | Applicant: Trident Security Systems | Permit type: Fire | Permit status: Cmp | Completion date: October 10, 2012 | Current use: Multifamily dwe | |||||
SCORE 93 Installation of a flush mount grid-tie 3 kw photovoltaic system on this multifamily structure. Other units to have photovoltaic arrays installed by separate permit. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Date: June 21, 2012 Contractor: Endurance Solar And Engineering Client: For Habitat | Applicant: Endurance Solar And Engineering | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 21, 2012 | Current use: Single family a | |||||
SCORE 95 Set new 1inch domestic meter pit for 3-unit townhome, (see pmt2011-03222 for fees and meter) Date: January 17, 2012 Contractor: Nixcavating, Inc Client: For Habitat | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2012-00220 | |||||
SCORE 95 Installation of a sign for habitat for humanity -- 11 sf Client: For Habitat | Permit type: Sign | Permit status: Cmp | Completion date: May 30, 2012 | Permit id: Pmt2012-00811 | |||||
SCORE 95 New sprinkler system for multi-family residence Client: For Habitat | Permit type: Fire | Permit status: Iss | Current use: Multifamily dwellings, existing | Permit id: Pmt2012-00846 | |||||
SCORE 95 Install 2inch fireline to building, 4inch tap and valve reqfootd. Also, set new 3 4inch irrigation meter and pit. (see pmt2011-03222 for meters and fees) Date: April 25, 2012 Contractor: Nixcavating, Inc Client: For Habitat | Permit type: Fire, water, right-of-way | Permit status: Iss | Current use: Multifamily dwellings, existing | Permit id: Pmt2012-01915 | |||||
SCORE 100 New fire alarm system for habitat for hummanity multi-family dwelling Client: For Habitat | Permit type: Fire | Permit status: Cmp | Completion date: October 10, 2012 | Current use: Multifamily dwellings, existing | Permit id: Pmt2012-02827 | |||||
SCORE 93 Installation of a flush mount grid-tie 3 kw photovoltaic system on this multifamily structure. Other units to have photovoltaic arrays installed by separate permit. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Client: For Habitat | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 21, 2012 | Current use: Single family attached dwelling, existin | Permit id: Pmt2012-03046 | |||||
SCORE 59 Construction of three, two-story townhome units. Each unit has three bedrooms and one and a half bathrooms. There are four unenclosed, off street parking spaces north of the building. See adr2011-00007 for modifications to original approvals. Client: For Habitat | Permit type: Building, electrical, mechanical, plumbing, water, wastewater, sitework | Permit status: Co | Current use: Multifamily dwellings, new, patio cover, | Permit id: Pmt2011-03222 | |||||
SCORE 95 New tri-plex, 100% affordable. Three addresses: 47 14th, 2 bdrm, 1 bath; 1401 zamia, 3 bdrm, 2 bath; 1405 zamia 2bdrm, 1bath. Lot 1, block 9, holiday neighborhood. Value: $366,526 Contractor: Coburn Development Inc Client: James Leach | Permit type: Building, electrical, mechanical, plumbing, water, wastewater | Permit status: N&v | Current use: Single family attached dwelling, new | Permit id: Pmt2005-04659 |