Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Apex will complete six soil borings using direct push technology for sampling. The soil borings will be advanced to a depth of approximately feet below ground surface -bgs- on portions of the site. The diameter of the soil borings two inch, as per site plans, work plans report, dc well construction form and dc well schematic form for the stavins and axelrod properties, llc. Date: September 13, 2012 Client: Uoh-H Street Llc | Applicant: Stavins And Alexlrod Properties, In; Rapid Permit Service, Inc. | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200446 | |||||
Excavation of petroleum impacted soils Date: August 19, 2013 Client: Uoh-H Street Llc | Applicant: Apex Companies, Llc | Permit type: Excavation only | Permit status: Permit issued | Permit id: Ex1300109 | |||||
The proposed work consist on frilling soil borings 8. 25 diameter by feet deep and convert five soil borings into monitoring wells 3 inch diameter by feet deep. Soil borings will be direct-push and monitoring wells hollow stem auger, ss per site plans, dc well construction application, dc well schematic form, work plan report for the stavins and alxelrod properties, inc. Date: September 3, 2013 Client: Stavins And Alxelrod Properties, Inc. | Applicant: Rapid Permit Service, Inc. | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300324 | |||||
The proposed work consist on drilling four soil borings and convert them into four monitoring wells. The diameter for soil borings and monitoring well will be between 3 inches and 6. 25 inches and the depth 35 feet. Soil borings will be using direct push technology for sampling. The interface probe and flow-through cell used to monitor aquifer parameters will be thoroughly decontaminated between each well location, as per site plan, dc well construction application, dc well schematic form and work plans report, for the stavins and alxelrod properties, inc. Date: January 11, 2013 Client: Stavins And Alxelrod Properties, Inc. | Applicant: Luis Garcia-Rapid Permit Service, Inc. | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300078 | |||||
SCORE 56 Apex will complete six soil borings using direct push technology for sampling. The soil borings will be advanced to a depth of approximately feet below ground surface -bgs- on portions of the site. The diameter of the soil borings two inch, as per site plans, work plans report, dc well construction form and dc well schematic form for the stavins and axelrod properties, llc. Date: September 13, 2012 Client: Uoh-H Street Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200446 | |||||
SCORE 100 Excavation of petroleum impacted soils Date: August 19, 2013 Contractor: Apex Companies Llc Client: Uoh-H Street Llc | Permit type: Excavation only | Permit status: Permit issued | Permit id: Ex1300109 | |||||
SCORE 82 The proposed work consist on drilling four soil borings and convert them into four monitoring wells. The diameter for soil borings and monitoring well will be between 3 inches and 6. 25 inches and the depth 35 feet. Soil borings will be using direct push technology for sampling. The interface probe and flow-through cell used to monitor aquifer parameters will be thoroughly decontaminated between each well location, as per site plan, dc well construction application, dc well schematic form and work plans report, for the stavins and alxelrod properties, inc. Date: January 11, 2013 Contractor: Luis Garciarapid Permit Service Inc Client: Stavins And Alxelrod Properties, Inc. | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300078 | |||||
SCORE 86 The proposed work consist on frilling soil borings 8. 25 diameter by feet deep and convert five soil borings into monitoring wells 3 inch diameter by feet deep. Soil borings will be direct-push and monitoring wells hollow stem auger, ss per site plans, dc well construction application, dc well schematic form, work plan report for the stavins and alxelrod properties, inc. Date: September 3, 2013 Contractor: Rapid Permit Service Inc Client: Stavins And Alxelrod Properties, Inc. | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300324 | |||||
SCORE 56 Apex will complete six soil borings using direct push technology for sampling. The soil borings will be advanced to a depth of approximately feet below ground surface -bgs- on portions of the site. The diameter of the soil borings two inch, as per site plans, work plans report, dc well construction form and dc well schematic form for the stavins and axelrod properties, llc. Date: September 13, 2012 Client: Uoh-H Street Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200446 | |||||
SCORE 56 Apex will complete six soil borings using direct push technology for sampling. The soil borings will be advanced to a depth of approximately feet below ground surface -bgs- on portions of the site. The diameter of the soil borings two inch, as per site plans, work plans report, dc well construction form and dc well schematic form for the stavins and axelrod properties, llc. Date: September 13, 2012 Client: Uoh-H Street Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1200446 | |||||
SCORE 84 Excavation of petroleum impacted soils Date: August 19, 2013 Contractor: Apex Companies, Llc Client: Uoh-H Street Llc | Permit type: Excavation only | Permit status: Permit issued | Permit id: Ex1300109 | |||||
SCORE 82 The proposed work consist on drilling four soil borings and convert them into four monitoring wells. The diameter for soil borings and monitoring well will be between 3 inches and 6. 25 inches and the depth 35 feet. Soil borings will be using direct push technology for sampling. The interface probe and flow-through cell used to monitor aquifer parameters will be thoroughly decontaminated between each well location, as per site plan, dc well construction application, dc well schematic form and work plans report, for the stavins and alxelrod properties, inc. Date: January 11, 2013 Contractor: Luis Garciarapid Permit Service, Inc Client: Stavins And Alxelrod Properties, Inc. | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300078 | |||||
SCORE 86 The proposed work consist on frilling soil borings 8. 25 diameter by feet deep and convert five soil borings into monitoring wells 3 inch diameter by feet deep. Soil borings will be direct-push and monitoring wells hollow stem auger, ss per site plans, dc well construction application, dc well schematic form, work plan report for the stavins and alxelrod properties, inc. Date: September 3, 2013 Contractor: Rapid Permit Service, Inc Client: Stavins And Alxelrod Properties, Inc. | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300324 |