Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Work on this demolition permit must commence within thirty (30) days of issuance and be completed sixty (60) days after commencement. This permit expires days after the permit is issued. Please call 811 before you dig. To demolish existing residence. Not to br burned on lot. Permit type: Building demolition permit | Permit id: 201622950 | Parcel: 11712001700 | |||||
SCORE 95 Work on this demolition permit must commence within thirty (30) days of issuance and be completed sixty (60) days after commencement. This permit expires days after the permit is issued. Please call 811 before you dig. To demolish existing residence. Not to br burned on lot. Permit type: Building demolition permit | Permit id: 201622950 | Parcel: 11712001700 | |||||
SCORE 95 To construct 14 clifton lane of new hpr duplex family residence 3193 sq ft with a 521 sq ft garage and 148 sq ft of porches & decks. Duplex structure setbacks: minimum 5 side setbacks, minumum of 6 ft between detached units 71. 4 ft minimum front setback and minimum rear setback. Maximum height of 1. 5 to width ratio from natural grade..... Maximum building coverage on total parcel not to exceed 40%.... Must conform to all easements on property. Per ordinance bl2016-178.... An affidavit shall be submitted to the director certifying the date of demolition has commenced and describing the nature of the work performed to date. If no such affidavit is submitted within thirty days of issuance, the demolition permit shall be deemed invalid.... Permit type: Building residential - new | Permit id: 2016046686 | Parcel: 117120v00100co |