Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 84 New construction project single-family dwelling new construction of a 2-story single family with attached garage (4793sf) as per plans. Date: April 2, 2002 Contractor: Teresita Alsandor Client: Lafayette, Derek O | Permit id: B02001551 | |||||
SCORE 84 New construction project single-family dwelling new construction of a 2-story single family dwelling with attached garage (4793sf) as per plans. Date: April 23, 2002 Contractor: Teresita Alsandor Client: Lafayette, Derek O | Permit id: B02001554 | |||||
SCORE 86 Swimming pool single-family dwelling building a inground gunite swimming pool in rear yard as per sketch. In compliance with article 15,sec. 5. 12. 7 of the n. O. Comp. Zon. Ord. Date: September 18, 2002 Contractor: Sean Faulk Client: Lafayette, Derek O | Permit id: B02004463 | |||||
SCORE 98 Electrical construction loop single-family dwelling elbred malone b02001554 Date: April 30, 2002 Contractor: Elbred Malone Client: Lafayette, Derek O | Permit id: E02003212 | |||||
SCORE 97 New construction project single-family dwelling kevin miller Date: September 12, 2002 Contractor: Kevin Miller Client: Lafayette, Derek O | Permit id: E02007134 | |||||
SCORE 98 Install mechanical equipment single-family dwelling install 2-gas warm air furnace and two a c system 3 & 5-top. Mack mckay - 382-0442 Date: March 13, 2003 Contractor: Mack Mckay Client: Lafayette, Derek O | Permit id: M03001682 | |||||
SCORE 98 Install mechanical equipment single-family dwelling install gas line, 2-gas water heater and fireplace. Isaiah byrd - 368-2431 Date: March 13, 2003 Contractor: Isaiah Byrd Client: Lafayette, Derek O | Permit id: M03001702 |