Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Dccr proposes to drill one geotechnical boring (pra2gi-72) located on the eastbound side of n street nw in between 36th street nw and 35th street nw (1301 36th street nw). The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. The monitoring well or well abandonment will be completed the same day. See idw management plan and Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: July 30, 2016 | Permit id: Pa124618 | |||||
SCORE 59 Wedding Permit status: Expired | Expiration date: December 4, 2010 | Permit id: Pa10015834 | |||||
SCORE 100 Dccr proposes to drill one geotechnical boring (pra2gi-72) located on the eastbound side of n street nw in between 36th street nw and 35th street nw (1301 36th street nw). The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. The monitoring well or well abandonment will be completed the same day. See idw management plan and Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: July 30, 2016 | Permit id: Pa124618 | |||||
SCORE 56 Construction staging area Permit status: Permit expired | Expiration date: August 29, 2014 | Permit id: Pa10135402 | |||||
SCORE 56 Wedding Permit status: Permit expired | Expiration date: May 23, 2015 | Permit id: Pa10170751 | |||||
SCORE 99 Construction staging area Permit status: Permit expired | Expiration date: May 18, 2016 | Permit id: Pa10237432 |