Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Interior remodel to existing admnbus office Date: March 4, 2008 Contractor: Stanley Henry Permit type: Mechanical permit | Permit status: Final | Completion date: March 20, 2008 | Expiration date: March 20, 2008 | Permit id: 2008-013568 Mp | |||||
SCORE 100 Interior remodel to existing admnbus office Date: March 5, 2008 Contractor: Joseph Cooper Permit type: Plumbing permit | Permit status: Final | Completion date: March 20, 2008 | Expiration date: March 20, 2008 | Permit id: 2008-013568 Pp | |||||
SCORE 56 Interior remodel to existing admnbus officejob contact david smith 4138646 Applicant: Mike Shorter | Applicant Phone: (512) 434-8295 | Permit type: Building permit | Permit status: Final | Completion date: April 3, 2008 | Expiration date: April 3, 2008 | Permit id: 2008-013568 Bp | |||||
SCORE 100 Interior remodel to existing admnbus office Date: March 6, 2008 Contractor: Charles Morris Permit type: Electrical permit | Permit status: Final | Completion date: March 26, 2008 | Expiration date: March 26, 2008 | Permit id: 2008-013568 Ep | |||||
SCORE 100 Interior remodel to existing admnbusprof office Applicant Phone: (512) 520-2709 | Permit type: Building permit | Permit status: Final | Completion date: June 6, 2013 | Expiration date: June 6, 2013 | Permit id: 2013-014527 Bp | |||||
SCORE 100 Interior remodel to existing admnbusprof office Date: February 21, 2013 Contractor: Robert A. Fabrizio Permit type: Mechanical permit | Permit status: Final | Completion date: May 29, 2013 | Expiration date: May 29, 2013 | Permit id: 2013-014527 Mp | |||||
SCORE 100 Interior remodel to existing admnbusprof office Applicant Phone: (512) 520-2700 | Permit type: Building permit | Permit status: Final | Completion date: June 6, 2013 | Expiration date: June 6, 2013 | Permit id: 2013-014527 Bp | |||||
SCORE 100 Interior remodel to existing admnbusprof office Date: February 25, 2013 Contractor: Jesse Beckett Permit type: Electrical permit | Permit status: Final | Completion date: May 16, 2013 | Expiration date: May 16, 2013 | Permit id: 2013-014527 Ep | |||||
SCORE 100 Interior remodel to existing admnbusprof office Date: March 6, 2013 Contractor: Billy Wayne Angell Jr Permit type: Plumbing permit | Permit status: Final | Completion date: May 15, 2013 | Expiration date: May 15, 2013 | Permit id: 2013-014527 Pp | |||||
SCORE 100 Interior remodel to carpet ceiling and finishes Date: August 31, 2016 Contractor: Blake Combs Permit type: Electrical permit | Permit status: Active | Expiration date: March 14, 2017 | Permit id: 2016-074571 Ep | |||||
SCORE 88 Interior remodel to carpet ceiling and finishes Applicant Phone: (303) 439-2800 | Permit type: Building permit | Permit status: Active | Expiration date: March 14, 2017 | Permit id: 2016-074571 Bp | |||||
SCORE 100 Interior remodel to carpet ceiling and finishes Date: August 25, 2016 Contractor: Robert A. Fabrizio Permit type: Mechanical permit | Permit status: Active | Expiration date: March 14, 2017 | Permit id: 2016-074571 Mp | |||||
SCORE 100 Interior remodel to carpet ceiling and finishes Date: September 8, 2016 Contractor: Richard Chapman Permit type: Plumbing permit | Permit status: Active | Expiration date: March 14, 2017 | Permit id: 2016-074571 Pp | |||||
SCORE 99 Interior remodel to existing admnbus offices tip package n 3rd flr area a Permit type: Mechanical permit | Permit status: Final | Completion date: June 3, 2003 | Expiration date: June 3, 2003 | Permit id: 2003-004209 Mp | |||||
SCORE 88 Interior remodel to an adminbusprof officeablutionprayer rooms Applicant Phone: (303) 439-2800 | Permit type: Building permit | Permit status: Active | Expiration date: February 13, 2018 | Permit id: 2017-085624 Bp | |||||
SCORE 100 Interior remodel to carpet ceiling and finishes Date: August 31, 2016 Contractor: Blake Combs Permit type: Electrical permit | Permit status: Final | Completion date: October 18, 2016 | Expiration date: October 18, 2016 | Permit id: 2016-074571 Ep | |||||
SCORE 100 Interior remodel to carpet ceiling and finishes Date: September 8, 2016 Contractor: Richard G Chapman Permit type: Plumbing permit | Permit status: Final | Completion date: October 21, 2016 | Expiration date: October 21, 2016 | Permit id: 2016-074571 Pp | |||||
SCORE 86 Interior remodel to carpet ceiling and finishes Date: August 25, 2016 Contractor: Edward Neal Jr Permit type: Mechanical permit | Permit status: Final | Completion date: October 14, 2016 | Expiration date: October 14, 2016 | Permit id: 2016-074571 Mp | |||||
SCORE 86 Interior remodel to carpet ceiling and finishes Date: August 25, 2016 Contractor: Edward Neal Jr Permit type: Mechanical permit | Permit status: Final | Completion date: October 14, 2016 | Expiration date: October 14, 2016 | Permit id: 2016-074571 Mp | |||||
SCORE 100 Interior demo nonstructural Permit type: Building permit | Permit status: Expired | Expiration date: March 2, 2016 | Permit id: 2015-099973 Bp | |||||
SCORE 78 New pad with new generator Permit type: Building permit | Permit status: Void | Expiration date: November 4, 2007 | Permit id: 2007-119968 Bp | |||||
Evaporative credit loss adjustment Date: October 27, 1998 Value: $800 Permit type: Plumbing permit | Permit status: Final | Completion date: November 2, 1998 | Expiration date: May 24, 1999 | Permit id: 1998-013668 Pp | |||||
Wall sign for temple inland Date: December 6, 1995 Permit type: Electrical permit | Permit status: Final | Completion date: December 15, 1995 | Expiration date: December 15, 1995 | Permit id: 1995-016074 Ep | |||||
SCORE 100 Interior remodel to existing administrative office package o Permit type: Electrical permit | Permit status: Final | Completion date: July 17, 2003 | Expiration date: July 17, 2003 | Permit id: 2003-0141 Ep | |||||
Freestanding sign guaranty financial group 95 oah Date: December 20, 2007 Permit type: Electrical permit | Permit status: Final | Completion date: February 5, 2008 | Expiration date: February 5, 2008 | Permit id: 2007-173067 Ep | |||||
SCORE 99 Interior remodel replace and upgrade mechanical equipment Permit type: Building permit | Permit status: Final | Completion date: April 2, 2015 | Expiration date: April 2, 2015 | Permit id: 2014-062782 Bp | |||||
SCORE 93 Interior remodel replace and upgrade mechanical equipment Date: June 26, 2014 Contractor: Gregory E Santos Permit type: Electrical permit | Permit status: Final | Completion date: December 4, 2014 | Expiration date: December 4, 2014 | Permit id: 2014-062782 Ep | |||||
SCORE 93 Interior remodel replace and upgrade mechanical equipment Date: July 3, 2014 Contractor: John Mcrae Permit type: Mechanical permit | Permit status: Final | Completion date: November 21, 2014 | Expiration date: November 21, 2014 | Permit id: 2014-062782 Mp | |||||
SCORE 100 Interior remodel to existing data office Applicant Phone: (512) 973-3930 | Permit type: Building permit | Permit status: Final | Completion date: November 13, 2014 | Expiration date: November 13, 2014 | Permit id: 2014-066501 Bp | |||||
SCORE 99 Interior remodel to existing data office Date: July 1, 2014 Contractor: Mark Mitchell Permit type: Electrical permit | Permit status: Final | Completion date: October 10, 2014 | Expiration date: October 10, 2014 | Permit id: 2014-066501 Ep | |||||
SCORE 100 Interior remodel to existing data office Date: July 1, 2014 Contractor: Steven Allen Lane Permit type: Mechanical permit | Permit status: Final | Completion date: October 8, 2014 | Expiration date: October 8, 2014 | Permit id: 2014-066501 Mp | |||||
SCORE 99 Interior remodel to existing data office Date: July 2, 2014 Contractor: Richard Neitzke Permit type: Plumbing permit | Permit status: Final | Completion date: October 8, 2014 | Expiration date: October 8, 2014 | Permit id: 2014-066501 Pp | |||||
SCORE 100 Interior non structural demo only Permit type: Building permit | Permit status: Final | Completion date: February 23, 2015 | Expiration date: February 23, 2015 | Permit id: 2014-135142 Bp | |||||
SCORE 99 Interior remodel to existing admnbusprof offices 1st floor suite 100 Date: February 23, 2015 Contractor: Mark Mitchell Permit type: Electrical permit | Permit status: Final | Completion date: April 30, 2015 | Expiration date: April 30, 2015 | Permit id: 2015-019643 Ep | |||||
SCORE 100 Interior remodel to existing admnbusprof offices 1st floor suite 100 Date: February 24, 2015 Contractor: Billy Wayne Angell Jr Permit type: Plumbing permit | Permit status: Final | Completion date: April 28, 2015 | Expiration date: April 28, 2015 | Permit id: 2015-019643 Pp | |||||
SCORE 100 Interior remodel to existing admnbusprof offices 1st floor suite 100 Date: March 2, 2015 Contractor: Robert A. Fabrizio Permit type: Mechanical permit | Permit status: Final | Completion date: May 7, 2015 | Expiration date: May 7, 2015 | Permit id: 2015-019643 Mp | |||||
SCORE 99 Remodel to install a new exterior emergency generator guaranty bank Applicant: David Smith | Applicant Phone: (512) 434-1033 | Permit type: Building permit | Permit status: Void | Expiration date: April 3, 2010 | Permit id: 2009-0210 Bp | |||||
SCORE 100 Interior demo nonstructural Permit type: Building permit | Permit status: Expired | Expiration date: March 2, 2016 | Permit id: 2015-099973 Bp | |||||
SCORE 60 Install 5 ev car charging stations in commercial parking lot Applicant: Mike Rodriguez | Applicant Phone: (832) 741-7974 | Permit type: Building permit | Permit status: Final | Completion date: November 24, 2015 | Expiration date: November 24, 2015 | Permit id: 2015-103997 Bp | |||||
SCORE 100 Install 5 ev car charging stations in commercial parking lot Date: September 1, 2015 Contractor: Michael Rodriguez Permit type: Electrical permit | Permit status: Final | Completion date: November 17, 2015 | Expiration date: November 17, 2015 | Permit id: 2015-103997 Ep | |||||
SCORE 100 Interior remodel to existing adminbusprof office accessory cafe Applicant Phone: (512) 520-2700 | Permit type: Building permit | Permit status: Final | Completion date: May 14, 2012 | Expiration date: May 14, 2012 | Permit id: 2012-020397 Bp | |||||
SCORE 100 Interior remodel to existing adminbusprof office accessory cafe stove hoods Date: March 6, 2012 Contractor: John Marchand Permit type: Mechanical permit | Permit status: Final | Completion date: May 9, 2012 | Expiration date: May 9, 2012 | Permit id: 2012-020397 Mp | |||||
SCORE 100 Interior remodel to existing adminbusprof office accessory cafe Date: March 6, 2012 Contractor: Eugene Hester Permit type: Plumbing permit | Permit status: Final | Completion date: April 23, 2012 | Expiration date: April 23, 2012 | Permit id: 2012-020397 Pp | |||||
SCORE 100 Interior remodel to existing adminbusprof office accessory cafe walkin cooler 1 walkin freezer 1 Date: March 30, 2012 Contractor: William Schindler Permit type: Mechanical permit | Permit status: Final | Completion date: April 19, 2012 | Expiration date: April 19, 2012 | Permit id: 2012-030555 Mp | |||||
Wall sign intel wlogo Date: April 30, 2012 Permit type: Electrical permit | Permit status: Final | Completion date: May 16, 2012 | Expiration date: May 16, 2012 | Permit id: 2012-042067 Ep | |||||
New officeshell271871sf garage 276156sf Date: November 21, 1994 Value: $20,000,000 Permit type: Mechanical permit | Permit status: Final | Completion date: August 29, 1995 | Expiration date: August 29, 1995 | Permit id: 1994-012399 Mp | |||||
Ht loop Date: August 29, 1994 Value: $100 Permit type: Mechanical permit | Permit status: Final | Completion date: September 1, 1994 | Expiration date: August 29, 2007 | Permit id: 1994-001916 Mp | |||||
Addition to existing garage Date: November 5, 1997 Value: $4,750,000 Permit type: Mechanical permit | Permit status: Final | Completion date: January 28, 1998 | Expiration date: January 28, 1998 | Permit id: 1997-004311 Mp | |||||
Office building expansion shell only Date: December 23, 1997 Value: $10,500,000 Permit type: Mechanical permit | Permit status: Final | Completion date: November 23, 1998 | Expiration date: November 23, 1998 | Permit id: 1997-001829 Mp | |||||
Temporary construction trailer6 months max Date: October 13, 1997 Permit type: Mechanical permit | Permit status: Void | Completion date: April 11, 1998 | Expiration date: August 29, 2007 | Permit id: 1997-004438 Mp | |||||
H t loop for temp constr trailer9713332 Date: October 14, 1997 Value: $150 Permit type: Mechanical permit | Permit status: Final | Completion date: October 20, 1997 | Expiration date: August 29, 2007 | Permit id: 1997-004498 Mp | |||||
Underground duct bank only elect Date: October 23, 1997 Value: $22,000 Permit type: Mechanical permit | Permit status: Void | Completion date: April 21, 1998 | Expiration date: April 22, 1998 | Permit id: 1997-004861 Mp | |||||
Interior remodel to 2nd 3rd floor offices Date: July 7, 1998 Value: $813,566 Permit type: Mechanical permit | Permit status: Final | Completion date: November 25, 1998 | Expiration date: November 25, 1998 | Permit id: 1998-001117 Mp | |||||
Office bldg expansion on 1st flr training rm Date: August 7, 1998 Value: $96,822 Permit type: Mechanical permit | Permit status: Final | Completion date: November 23, 1998 | Expiration date: November 23, 1998 | Permit id: 1998-0016 Mp | |||||
Elec for elevator only Date: June 19, 1998 Value: $17,570 Permit type: Mechanical permit | Permit status: Final | Completion date: April 22, 1999 | Expiration date: August 29, 2007 | Permit id: 1998-007561 Mp | |||||
Finishout for 1st 4th 5th floors offices Date: June 22, 1998 Value: $918,342 Permit type: Mechanical permit | Permit status: Final | Completion date: November 23, 1998 | Expiration date: November 23, 1998 | Permit id: 1998-0076 Mp | |||||
Int rmdl for offc bldg package g flrs 14 Date: August 28, 1998 Value: $1,878,500 Permit type: Mechanical permit | Permit status: Final | Completion date: October 20, 1999 | Expiration date: December 20, 2000 | Permit id: 1998-002482 Mp | |||||
SCORE 100 Duct replacement to existing commerical building only like for like Date: December 2, 2014 Contractor: Steven Allen Lane Permit type: Mechanical permit | Permit status: Final | Completion date: December 5, 2014 | Expiration date: December 5, 2014 | Permit id: 2014-128017 Mp | |||||
SCORE 78 Interior remodel to existing admnbus offices temple inland Permit type: Mechanical permit | Permit status: Final | Completion date: March 24, 2003 | Expiration date: March 24, 2003 | Permit id: 2003-016769 Mp | |||||
Interior remodel to existing offices for tip package phase l area b Date: April 10, 2003 Value: $54,000 Permit type: Mechanical permit | Permit status: Void | Expiration date: December 13, 2003 | Permit id: 2003-000943 Mp | |||||
SCORE 97 Interior remodel for tippackage r 2nd floor area b Permit type: Mechanical permit | Permit status: Final | Completion date: May 7, 2003 | Expiration date: May 7, 2003 | Permit id: 2003-004846 Mp | |||||
SCORE 78 Interior remodel to existing admnbus offices pkg q 4th flr area b Permit type: Mechanical permit | Permit status: Final | Completion date: November 20, 2003 | Expiration date: November 20, 2003 | Permit id: 2003-007409 Mp | |||||
SCORE 97 Interior remodel to existing administrative officespackage d 4th floor area b Permit type: Mechanical permit | Permit status: Final | Completion date: June 9, 2003 | Expiration date: June 9, 2003 | Permit id: 2003-007465 Mp | |||||
SCORE 99 Interior remodel to existing admnbus offices tip pkg k 1st flr Permit type: Mechanical permit | Permit status: Final | Completion date: July 24, 2003 | Expiration date: July 24, 2003 | Permit id: 2003-014149 Mp | |||||
SCORE 100 Interior remodel to existing admnbusprof offices 1st floor suite 100 Applicant Phone: (512) 520-2700 | Permit type: Building permit | Permit status: Final | Completion date: May 12, 2015 | Expiration date: May 12, 2015 | Permit id: 2015-019643 Bp | |||||
SCORE 56 Interior remodel to 1st floor area b package 2 for fitness center Permit type: Mechanical permit | Permit status: Final | Completion date: November 14, 2003 | Expiration date: November 14, 2003 | Permit id: 2003-015852 Mp | |||||
Separate circuit in existing panel only Date: November 23, 1999 Value: $250 Permit type: Mechanical permit | Permit status: Final | Completion date: November 29, 1999 | Expiration date: August 29, 2007 | Permit id: 1999-011867 Mp | |||||
SCORE 56 Repairing exst cooling tower piping only Permit type: Mechanical permit | Permit status: Final | Completion date: July 1, 2005 | Expiration date: July 1, 2005 | Permit id: 2005-018972 Mp | |||||
Interior remodel to existing administratives office to drop ceilings for future chiller Date: June 15, 2005 Value: $5,000 Permit type: Mechanical permit | Permit status: Void | Expiration date: December 12, 2005 | Permit id: 2005-016146 Mp | |||||
Trellis addition to exist comm bldg Date: March 12, 1997 Value: $40,000 Permit type: Building permit | Permit status: Final | Completion date: August 25, 1997 | Expiration date: August 25, 1997 | Permit id: 1997-0082 Bp | |||||
SCORE 56 Interior remodel to existing administrativebusiness office to create data center Permit type: Mechanical permit | Permit status: Final | Completion date: March 27, 2007 | Expiration date: November 28, 2007 | Permit id: 2006-0269 Mp | |||||
Interior remodel to existing administrative office for package y 1st floor area a Date: September 10, 2003 Value: $23,500 Permit type: Mechanical permit | Permit status: Void | Expiration date: March 8, 2004 | Permit id: 2003-008029 Mp | |||||
SCORE 99 Interior admin office remodel on the 3rd floor Permit type: Mechanical permit | Permit status: Final | Completion date: July 20, 2000 | Expiration date: July 20, 2000 | Permit id: 2000-004739 Mp | |||||
Electric to elevator Date: November 28, 1994 Value: $13,158 Permit type: Mechanical permit | Permit status: Final | Completion date: October 4, 1995 | Expiration date: August 29, 2007 | Permit id: 1994-013067 Mp | |||||
H t loop Date: November 8, 1994 Value: $100 Permit type: Mechanical permit | Permit status: Void | Completion date: May 7, 1995 | Expiration date: May 29, 1995 | Permit id: 1994-010557 Mp | |||||
Finishout for commercial office building Date: February 9, 1995 Value: $2,400,000 Permit type: Mechanical permit | Permit status: Final | Completion date: September 14, 1995 | Expiration date: September 14, 1995 | Permit id: 1995-013775 Mp | |||||
Three temporary job site trailers Date: July 19, 1994 Permit type: Mechanical permit | Permit status: Void | Completion date: January 15, 1995 | Expiration date: August 29, 2007 | Permit id: 1994-012089 Mp | |||||
Underground fire line Date: October 20, 1994 Value: $150,000 Permit type: Plumbing permit | Permit status: Void | Completion date: April 18, 1995 | Expiration date: August 29, 2007 | Permit id: 1994-007972 Pp | |||||
Underground site utilities Date: October 20, 1994 Value: $100,000 Permit type: Plumbing permit | Permit status: Final | Completion date: December 20, 1994 | Expiration date: February 25, 1996 | Permit id: 1994-007975 Pp | |||||
Tenant expasion to exist office Date: October 14, 1999 Value: $560,000 Permit type: Mechanical permit | Permit status: Final | Completion date: November 10, 1999 | Expiration date: November 10, 1999 | Permit id: 1999-002372 Mp | |||||
SCORE 99 Interior remodel to admnbus offices tip package phase j third floor Permit type: Plumbing permit | Permit status: Final | Completion date: August 12, 2003 | Expiration date: August 12, 2003 | Permit id: 2003-001654 Pp | |||||
SCORE 97 Interior remodel to existing administrative office 2nd floor tip package b Permit type: Mechanical permit | Permit status: Final | Completion date: April 25, 2003 | Expiration date: April 25, 2003 | Permit id: 2003-0176 Mp | |||||
SCORE 99 Interior remodel to existing admnbus office tip pkg h area c 3rd flr Permit type: Mechanical permit | Permit status: Final | Completion date: June 16, 2003 | Expiration date: June 16, 2003 | Permit id: 2003-004403 Mp | |||||
SCORE 97 Interior remodel to existing administrative office package f 4th floor area b Permit type: Mechanical permit | Permit status: Final | Completion date: June 23, 2003 | Expiration date: June 23, 2003 | Permit id: 2003-004415 Mp | |||||
SCORE 78 Replace cooling towers Permit type: Plumbing permit | Permit status: Final | Completion date: June 30, 2006 | Expiration date: June 30, 2006 | Permit id: 2006-026846 Pp | |||||
SCORE 100 Interior remodel to existing administrative office 2nd floor tip package b Permit type: Plumbing permit | Permit status: Final | Completion date: April 25, 2003 | Expiration date: April 25, 2003 | Permit id: 2003-0176 Pp | |||||
SCORE 100 Interior remodel to existing administrative office package f 4th floor area b Permit type: Plumbing permit | Permit status: Final | Completion date: June 26, 2003 | Expiration date: June 26, 2003 | Permit id: 2003-004415 Pp | |||||
SCORE 100 Interior remodel to existing administrative officespackage d 4th floor area b Permit type: Plumbing permit | Permit status: Final | Completion date: June 18, 2003 | Expiration date: June 18, 2003 | Permit id: 2003-007465 Pp | |||||
Freestanding sign for templeinland Date: December 6, 1995 Permit type: Electrical permit | Permit status: Final | Completion date: December 15, 1995 | Expiration date: December 15, 1995 | Permit id: 1995-016073 Ep | |||||
SCORE 100 Interior remodel to existing administrative office 2nd floor tip package b Permit type: Electrical permit | Permit status: Final | Completion date: May 1, 2003 | Expiration date: May 1, 2003 | Permit id: 2003-0176 Ep | |||||
SCORE 100 Interior remodel to existing offices for tip package phase l area b Permit type: Electrical permit | Permit status: Void | Expiration date: December 13, 2003 | Permit id: 2003-000943 Ep | |||||
SCORE 100 Interior remodel to existing administrative office package f 4th floor area b Permit type: Electrical permit | Permit status: Final | Completion date: June 18, 2003 | Expiration date: June 18, 2003 | Permit id: 2003-004415 Ep | |||||
SCORE 100 Interior remodel for tippackage r 2nd floor area b Permit type: Electrical permit | Permit status: Final | Completion date: May 9, 2003 | Expiration date: May 9, 2003 | Permit id: 2003-004846 Ep | |||||
SCORE 100 Interior remodel to existing administrative officespackage d 4th floor area b Permit type: Electrical permit | Permit status: Final | Completion date: June 9, 2003 | Expiration date: June 9, 2003 | Permit id: 2003-007465 Ep | |||||
Interior remodel to existing administrative officespackage d 4th floor area b Date: April 28, 2003 Value: $189,000 Permit type: Building permit | Permit status: Final | Completion date: June 23, 2003 | Expiration date: June 23, 2003 | Permit id: 2003-007465 Bp | |||||
Interior remodel to existing administrative office 2nd floor tip package b Date: April 18, 2003 Value: $100,000 Permit type: Building permit | Permit status: Final | Completion date: May 5, 2003 | Expiration date: May 5, 2003 | Permit id: 2003-0176 Bp | |||||
Interior remodel for tippackage r 2nd floor area b Date: April 25, 2003 Value: $4,750 Permit type: Building permit | Permit status: Final | Completion date: May 14, 2003 | Expiration date: May 14, 2003 | Permit id: 2003-004846 Bp | |||||
Interior remodel to existing administrative office package o Date: May 9, 2003 Value: $5,000 Permit type: Building permit | Permit status: Final | Completion date: July 17, 2003 | Expiration date: July 17, 2003 | Permit id: 2003-0141 Bp | |||||
Roof addition to existing bridge Date: February 5, 1999 Value: $45,000 Permit type: Building permit | Permit status: Final | Completion date: October 20, 1999 | Expiration date: October 20, 1999 | Permit id: 1999-000072 Bp | |||||
Interior remodel to existing administrative office package f 4th floor area b Date: April 28, 2003 Value: $257,000 Permit type: Building permit | Permit status: Final | Completion date: June 24, 2003 | Expiration date: June 24, 2003 | Permit id: 2003-004415 Bp | |||||
SCORE 100 Interior remodel to existing adminbusprof office accessory cafe Date: March 7, 2012 Contractor: John V Cook Permit type: Electrical permit | Permit status: Final | Completion date: April 24, 2012 | Expiration date: April 24, 2012 | Permit id: 2012-020397 Ep | |||||
SCORE 88 Interior nonstructural demolition for commercial bldg Applicant Phone: (303) 439-2800 | Permit type: Building permit | Permit status: Active | Expiration date: December 10, 2017 | Permit id: 2017-066479 Bp | |||||
SCORE 100 Interior remodel to existing data office Applicant Phone: (512) 973-3930 | Permit type: Building permit | Permit status: Final | Completion date: November 13, 2014 | Expiration date: November 13, 2014 | Permit id: 2014-066501 Bp | |||||
SCORE 93 Interior remodel replace and upgrade mechanical equipment Date: June 26, 2014 Contractor: Gregory E Santos Permit type: Electrical permit | Permit status: Final | Completion date: December 4, 2014 | Expiration date: December 4, 2014 | Permit id: 2014-062782 Ep | |||||
SCORE 93 Interior remodel replace and upgrade mechanical equipment Date: July 3, 2014 Contractor: John Mcrae Permit type: Mechanical permit | Permit status: Final | Completion date: November 21, 2014 | Expiration date: November 21, 2014 | Permit id: 2014-062782 Mp | |||||
SCORE 100 Interior non structural demo only Permit type: Building permit | Permit status: Final | Completion date: February 23, 2015 | Expiration date: February 23, 2015 | Permit id: 2014-135142 Bp | |||||
SCORE 100 Interior remodel to existing adminbusprof office accessory cafe Applicant Phone: (512) 520-2709 | Permit type: Building permit | Permit status: Final | Completion date: May 14, 2012 | Expiration date: May 14, 2012 | Permit id: 2012-020397 Bp | |||||
SCORE 100 Interior remodel to existing admnbusprof offices 1st floor suite 100 Applicant Phone: (512) 520-2709 | Permit type: Building permit | Permit status: Final | Completion date: May 12, 2015 | Expiration date: May 12, 2015 | Permit id: 2015-019643 Bp | |||||
SCORE 100 Interior remodel to existing administrative office 2nd floor tip package b Permit type: Plumbing permit | Permit status: Final | Completion date: April 25, 2003 | Expiration date: April 25, 2003 | Permit id: 2003-0176 Pp | |||||
SCORE 100 Interior remodel to existing administrative office package f 4th floor area b Permit type: Plumbing permit | Permit status: Final | Completion date: June 26, 2003 | Expiration date: June 26, 2003 | Permit id: 2003-004415 Pp | |||||
SCORE 100 Interior remodel to existing administrative officespackage d 4th floor area b Permit type: Plumbing permit | Permit status: Final | Completion date: June 18, 2003 | Expiration date: June 18, 2003 | Permit id: 2003-007465 Pp | |||||
SCORE 100 Interior non structural demo only a2nd floor Permit type: Building permit | Permit status: Final | Completion date: January 20, 2012 | Expiration date: January 20, 2012 | Permit id: 2011-067422 Bp | |||||
SCORE 68 Interior non structrual demo only intel corp Applicant Phone: (210) 566-8787 | Permit type: Building permit | Permit status: Final | Completion date: December 20, 2013 | Expiration date: December 20, 2013 | Permit id: 2013-114233 Bp | |||||
SCORE 99 Interior remodel to existing admnbus offices 1st floor area a pkg m Permit type: Mechanical permit | Permit status: Final | Completion date: July 25, 2003 | Expiration date: July 25, 2003 | Permit id: 2003-014001 Mp | |||||
SCORE 100 Interior non structural demo only a2nd floor Permit type: Building permit | Permit status: Final | Completion date: January 20, 2012 | Expiration date: January 20, 2012 | Permit id: 2011-067422 Bp | |||||
SCORE 100 Interior non structural demo only a1st floor Permit type: Building permit | Permit status: Final | Completion date: October 13, 2011 | Expiration date: October 13, 2011 | Permit id: 2011-067425 Bp | |||||
SCORE 100 Interior non structural demo only a1st floor Permit type: Building permit | Permit status: Final | Completion date: October 13, 2011 | Expiration date: October 13, 2011 | Permit id: 2011-067425 Bp | |||||
SCORE 99 Interior remodel to existing admnbusprof offices Date: February 23, 2015 Contractor: Mark Mitchell Permit type: Electrical permit | Permit status: Final | Completion date: April 27, 2015 | Expiration date: April 27, 2015 | Permit id: 2015-019642 Ep | |||||
SCORE 100 Interior remodel to existing admnbusprof offices Date: March 6, 2015 Contractor: Robert A. Fabrizio Permit type: Mechanical permit | Permit status: Final | Completion date: April 30, 2015 | Expiration date: April 30, 2015 | Permit id: 2015-019642 Mp | |||||
SCORE 100 Interior remodel to existing admnbusprof offices Date: February 24, 2015 Contractor: Billy Wayne Angell Jr Permit type: Plumbing permit | Permit status: Final | Completion date: April 28, 2015 | Expiration date: April 28, 2015 | Permit id: 2015-019642 Pp | |||||
SCORE 100 Interior remodel to existing admnbusprof offices Applicant Phone: (512) 520-2700 | Permit type: Building permit | Permit status: Final | Completion date: May 1, 2015 | Expiration date: May 1, 2015 | Permit id: 2015-019642 Bp | |||||
SCORE 99 Interior remodel to existing admnbus offices temple inland Permit type: Mechanical permit | Permit status: Final | Completion date: August 26, 2005 | Expiration date: August 26, 2005 | Permit id: 2005-024695 Mp | |||||
SCORE 100 Interior remodel to existing admnbusprof offices Applicant Phone: (512) 520-2709 | Permit type: Building permit | Permit status: Final | Completion date: May 1, 2015 | Expiration date: May 1, 2015 | Permit id: 2015-019642 Bp | |||||
SCORE 100 Interior remodel to existing adminbusprof office Date: September 8, 2011 Contractor: Eugene Hester Permit type: Plumbing permit | Permit status: Final | Completion date: November 1, 2011 | Expiration date: November 1, 2011 | Permit id: 2011-077812 Pp | |||||
SCORE 100 Interior non structural demo only 5th fl hank slocum 2146814783 Permit type: Building permit | Permit status: Final | Completion date: August 17, 2011 | Expiration date: August 17, 2011 | Permit id: 2011-065412 Bp | |||||
SCORE 100 Interior remodel to existing adminbusprof office Applicant Phone: (512) 520-2700 | Permit type: Building permit | Permit status: Final | Completion date: January 17, 2012 | Expiration date: January 17, 2012 | Permit id: 2011-077812 Bp | |||||
SCORE 100 Interior remodel to existing adminbusprof office Date: September 2, 2011 Contractor: John V Cook Permit type: Electrical permit | Permit status: Final | Completion date: January 12, 2012 | Expiration date: January 12, 2012 | Permit id: 2011-077812 Ep | |||||
SCORE 100 Interior remodel to existing adminbusprof office Date: September 8, 2011 Contractor: John Marchand Permit type: Mechanical permit | Permit status: Final | Completion date: October 19, 2011 | Expiration date: October 19, 2011 | Permit id: 2011-077812 Mp | |||||
SCORE 100 Interior non structural demo only 5th fl hank slocum 2146814783 Permit type: Building permit | Permit status: Final | Completion date: August 17, 2011 | Expiration date: August 17, 2011 | Permit id: 2011-065412 Bp | |||||
SCORE 100 Interior remodel to existing adminbusprof office Applicant Phone: (512) 520-2709 | Permit type: Building permit | Permit status: Final | Completion date: January 17, 2012 | Expiration date: January 17, 2012 | Permit id: 2011-077812 Bp | |||||
SCORE 100 Interior non structural demo only 1abcr Permit type: Building permit | Permit status: Final | Completion date: September 1, 2011 | Expiration date: September 1, 2011 | Permit id: 2011-067409 Bp | |||||
SCORE 100 Interior remodel to existing adminbusprof office Date: February 2, 2012 Contractor: Eugene Hester Permit type: Plumbing permit | Permit status: Final | Completion date: May 3, 2012 | Expiration date: May 3, 2012 | Permit id: 2011-0788 Pp | |||||
SCORE 100 Interior non structural demo only 1abcr Permit type: Building permit | Permit status: Final | Completion date: September 1, 2011 | Expiration date: September 1, 2011 | Permit id: 2011-067409 Bp | |||||
SCORE 100 Interior remodel to existing adminbusprof office Applicant Phone: (512) 520-2700 | Permit type: Building permit | Permit status: Final | Completion date: May 15, 2012 | Expiration date: May 15, 2012 | Permit id: 2011-0788 Bp | |||||
SCORE 100 Interior remodel to existing adminbusprof office Date: October 13, 2011 Contractor: John V Cook Permit type: Electrical permit | Permit status: Final | Completion date: April 26, 2012 | Expiration date: April 26, 2012 | Permit id: 2011-0788 Ep | |||||
SCORE 100 Interior remodel to existing adminbusprof office Date: February 2, 2012 Contractor: John Marchand Permit type: Mechanical permit | Permit status: Final | Completion date: April 25, 2012 | Expiration date: April 25, 2012 | Permit id: 2011-0788 Mp | |||||
SCORE 100 Interior remodel to existing adminbusprof office Applicant Phone: (512) 520-2709 | Permit type: Building permit | Permit status: Final | Completion date: May 15, 2012 | Expiration date: May 15, 2012 | Permit id: 2011-0788 Bp | |||||
SCORE 100 Interior non structural demo only c2nd floor Permit type: Building permit | Permit status: Final | Completion date: September 29, 2011 | Expiration date: September 29, 2011 | Permit id: 2011-067417 Bp | |||||
SCORE 100 Interior remodel to existing adminbusprof office Applicant Phone: (512) 520-2709 | Permit type: Building permit | Permit status: Final | Completion date: January 19, 2012 | Expiration date: January 19, 2012 | Permit id: 2011-089164 Bp | |||||
SCORE 100 Interior remodel to existing adminbusprof officelance 8481652 Date: October 12, 2011 Contractor: John Marchand Permit type: Mechanical permit | Permit status: Final | Completion date: November 29, 2011 | Expiration date: November 29, 2011 | Permit id: 2011-089164 Mp | |||||
SCORE 100 Interior remodel to existing adminbusprof officec second floor Date: October 12, 2011 Contractor: Eugene Hester Permit type: Plumbing permit | Permit status: Final | Completion date: December 20, 2011 | Expiration date: December 20, 2011 | Permit id: 2011-089164 Pp | |||||
SCORE 100 Interior non structural demo only c2nd floor Permit type: Building permit | Permit status: Final | Completion date: September 29, 2011 | Expiration date: September 29, 2011 | Permit id: 2011-067417 Bp | |||||
SCORE 100 Interior remodel to existing adminbusprof office Applicant Phone: (512) 520-2700 | Permit type: Building permit | Permit status: Final | Completion date: January 19, 2012 | Expiration date: January 19, 2012 | Permit id: 2011-089164 Bp | |||||
SCORE 100 Interior remodel to existing adminbusprof office Date: October 10, 2011 Contractor: John V Cook Permit type: Electrical permit | Permit status: Final | Completion date: January 4, 2012 | Expiration date: January 4, 2012 | Permit id: 2011-089164 Ep | |||||
SCORE 100 Interior remodel to existing admnbusprof offices Date: October 13, 2011 Contractor: John Marchand Permit type: Mechanical permit | Permit status: Final | Completion date: January 5, 2012 | Expiration date: January 5, 2012 | Permit id: 2011-092254 Mp | |||||
SCORE 97 Interior remodel to existing admin office package t 2nd fl area b Permit type: Mechanical permit | Permit status: Final | Completion date: October 22, 2003 | Expiration date: October 22, 2003 | Permit id: 2003-006582 Mp | |||||
SCORE 71 Interior remodel admnbus offices tip package s 2nd flr area b Permit type: Mechanical permit | Permit status: Final | Completion date: October 22, 2003 | Expiration date: October 22, 2003 | Permit id: 2003-006629 Mp | |||||
SCORE 100 Interior remodel to 2nd floor temple inland package x Permit type: Plumbing permit | Permit status: Final | Completion date: October 1, 2003 | Expiration date: October 1, 2003 | Permit id: 2003-008624 Pp | |||||
SCORE 71 Interior remodel to existing admnbus offices tip pkg v 2nd flr area b Permit type: Mechanical permit | Permit status: Final | Completion date: May 27, 2003 | Expiration date: May 27, 2003 | Permit id: 2003-011165 Mp | |||||
SCORE 97 Interior remodel to 2nd floor temple inland package x Permit type: Mechanical permit | Permit status: Final | Completion date: October 2, 2003 | Expiration date: October 2, 2003 | Permit id: 2003-008624 Mp | |||||
SCORE 100 Interior remodel to existing admin office package t 2nd fl area b Permit type: Electrical permit | Permit status: Final | Completion date: October 30, 2003 | Expiration date: October 30, 2003 | Permit id: 2003-006582 Ep | |||||
SCORE 100 Interior remodel to 2nd floor temple inland package x Permit type: Electrical permit | Permit status: Final | Completion date: October 14, 2003 | Expiration date: October 14, 2003 | Permit id: 2003-008624 Ep | |||||
Interior remodel to existing admin office package t 2nd fl area b Date: May 7, 2003 Value: $17,250 Permit type: Building permit | Permit status: Final | Completion date: October 31, 2003 | Expiration date: October 31, 2003 | Permit id: 2003-006582 Bp | |||||
Interior remodel to 2nd floor temple inland package x Date: September 19, 2003 Value: $23,000 Permit type: Building permit | Permit status: Final | Completion date: October 14, 2003 | Expiration date: October 14, 2003 | Permit id: 2003-008624 Bp | |||||
SCORE 100 Interior remodel to existing admnbusprof offices 2146862531 Applicant Phone: (512) 520-2700 | Permit type: Building permit | Permit status: Final | Completion date: January 26, 2012 | Expiration date: January 26, 2012 | Permit id: 2011-092254 Bp | |||||
SCORE 100 Interior remodel to existing admnbusprof offices Date: October 13, 2011 Contractor: John V Cook Permit type: Electrical permit | Permit status: Final | Completion date: January 12, 2012 | Expiration date: January 12, 2012 | Permit id: 2011-092254 Ep | |||||
SCORE 100 Interior remodel to existing admnbusprof offices Date: October 13, 2011 Contractor: Eugene Hester Permit type: Plumbing permit | Permit status: Final | Completion date: January 5, 2012 | Expiration date: January 5, 2012 | Permit id: 2011-092254 Pp | |||||
SCORE 100 Interior remodel to existing admnbusprof offices 2146862531 Applicant Phone: (512) 520-2709 | Permit type: Building permit | Permit status: Final | Completion date: January 26, 2012 | Expiration date: January 26, 2012 | Permit id: 2011-092254 Bp | |||||
SCORE 100 Interior remodel to 2nd floor temple inland package x Permit type: Plumbing permit | Permit status: Final | Completion date: October 1, 2003 | Expiration date: October 1, 2003 | Permit id: 2003-008624 Pp | |||||
SCORE 100 Interior remodel to existing admnbusprof office 2a Applicant Phone: (512) 520-2709 | Permit type: Building permit | Permit status: Final | Completion date: March 1, 2012 | Expiration date: March 1, 2012 | Permit id: 2011-093639 Bp | |||||
SCORE 100 Interior remodel to existing admnbusprof office 1c Applicant Phone: (512) 520-2709 | Permit type: Building permit | Permit status: Final | Completion date: January 27, 2012 | Expiration date: January 27, 2012 | Permit id: 2011-0936 Bp | |||||
SCORE 100 Interior remodel to existing admnbusprof office 2a Applicant Phone: (512) 520-2700 | Permit type: Building permit | Permit status: Final | Completion date: March 1, 2012 | Expiration date: March 1, 2012 | Permit id: 2011-093639 Bp | |||||
SCORE 100 Interior remodel to existing admnbusprof office 1c Applicant Phone: (512) 520-2700 | Permit type: Building permit | Permit status: Final | Completion date: January 27, 2012 | Expiration date: January 27, 2012 | Permit id: 2011-0936 Bp | |||||
SCORE 99 Install interior electric power from panel for starline track to existing commercial building lab room Date: August 8, 2013 Contractor: Kenneth Tumlinson Permit type: Electrical permit | Permit status: Final | Completion date: January 29, 2014 | Expiration date: January 29, 2014 | Permit id: 2013-082788 Ep | |||||
SCORE 100 Interior remodel to existing admnbusprof office 2a Date: October 24, 2011 Contractor: John V Cook Permit type: Electrical permit | Permit status: Final | Completion date: January 6, 2012 | Expiration date: January 6, 2012 | Permit id: 2011-093639 Ep | |||||
SCORE 100 Interior remodel to existing admnbusprof office 2a Date: October 21, 2011 Contractor: John Marchand Permit type: Mechanical permit | Permit status: Final | Completion date: January 5, 2012 | Expiration date: January 5, 2012 | Permit id: 2011-093639 Mp | |||||
SCORE 100 Interior remodel to existing admnbusprof office 2a Date: October 21, 2011 Contractor: Eugene Hester Permit type: Plumbing permit | Permit status: Final | Completion date: February 28, 2012 | Expiration date: February 28, 2012 | Permit id: 2011-093639 Pp | |||||
SCORE 100 Interior remodel to existing admnbusprof office 1c Date: October 24, 2011 Contractor: John V Cook Permit type: Electrical permit | Permit status: Final | Completion date: December 20, 2011 | Expiration date: December 20, 2011 | Permit id: 2011-0936 Ep | |||||
SCORE 100 Interior remodel to existing admnbusprof office 1c Date: October 21, 2011 Contractor: John Marchand Permit type: Mechanical permit | Permit status: Final | Completion date: January 5, 2012 | Expiration date: January 5, 2012 | Permit id: 2011-0936 Mp | |||||
SCORE 100 Interior remodel to existing admnbusprof office 1c Date: October 21, 2011 Contractor: Eugene Hester Permit type: Plumbing permit | Permit status: Final | Completion date: January 5, 2012 | Expiration date: January 5, 2012 | Permit id: 2011-0936 Pp | |||||
SCORE 100 Interior remodel to exisitng admnbusprof office Applicant Phone: (512) 520-2700 | Permit type: Building permit | Permit status: Final | Completion date: July 3, 2013 | Expiration date: July 3, 2013 | Permit id: 2013-052894 Bp | |||||
SCORE 100 Interior remodel to exisitng admnbusprof office Date: May 23, 2013 Contractor: Jesse Beckett Permit type: Electrical permit | Permit status: Final | Completion date: June 7, 2013 | Expiration date: June 7, 2013 | Permit id: 2013-052894 Ep | |||||
SCORE 100 Interior remodel to exisitng admnbusprof office Date: May 23, 2013 Contractor: Robert A. Fabrizio Permit type: Mechanical permit | Permit status: Final | Completion date: July 2, 2013 | Expiration date: July 2, 2013 | Permit id: 2013-052894 Mp | |||||
SCORE 100 Interior remodel to exisitng admnbusprof office Applicant Phone: (512) 520-2709 | Permit type: Building permit | Permit status: Final | Completion date: July 3, 2013 | Expiration date: July 3, 2013 | Permit id: 2013-052894 Bp | |||||
SCORE 100 Interior remodel to existing admnbusprof offices Applicant Phone: (512) 520-2709 | Permit type: Building permit | Permit status: Final | Completion date: May 8, 2012 | Expiration date: May 8, 2012 | Permit id: 2011-113396 Bp | |||||
SCORE 100 Interior remodel to existing admnbusprof offices Applicant Phone: (512) 520-2700 | Permit type: Building permit | Permit status: Final | Completion date: May 8, 2012 | Expiration date: May 8, 2012 | Permit id: 2011-113396 Bp | |||||
SCORE 99 Change out water heater to comm bldg only Date: September 19, 2013 Contractor: Richard Neitzke Permit type: Plumbing permit | Permit status: Final | Completion date: October 11, 2013 | Expiration date: October 11, 2013 | Permit id: 2013-098701 Pp | |||||
SCORE 100 Interior remodel to existing admnbusprof offices Date: December 28, 2011 Contractor: John V Cook Permit type: Electrical permit | Permit status: Final | Completion date: April 26, 2012 | Expiration date: April 26, 2012 | Permit id: 2011-113396 Ep | |||||
SCORE 100 Interior remodel to existing admnbusprof offices Date: December 22, 2011 Contractor: John Marchand Permit type: Mechanical permit | Permit status: Final | Completion date: April 25, 2012 | Expiration date: April 25, 2012 | Permit id: 2011-113396 Mp | |||||
SCORE 100 Interior nonstructural demo Permit type: Building permit | Permit status: Final | Completion date: February 14, 2013 | Expiration date: February 14, 2013 | Permit id: 2013-000685 Bp | |||||
SCORE 100 Interior remodel to existing admnbusprof office Applicant Phone: (512) 520-2709 | Permit type: Building permit | Permit status: Final | Completion date: July 3, 2012 | Expiration date: July 3, 2012 | Permit id: 2012-044501 Bp | |||||
SCORE 99 Connect cmt test equipment to existing electrical system for testing purposes only Date: April 27, 2012 Contractor: Kenneth Tumlinson Permit type: Electrical permit | Permit status: Final | Completion date: September 24, 2012 | Expiration date: September 24, 2012 | Permit id: 2012-041334 Ep | |||||
SCORE 99 Interior remodel for admnbus offices tip package phs e 2nd flr Permit type: Mechanical permit | Permit status: Final | Completion date: May 6, 2003 | Expiration date: May 6, 2003 | Permit id: 2003-006843 Mp | |||||
SCORE 97 Interior administrative offices package i 1st floor area b Permit type: Mechanical permit | Permit status: Final | Completion date: May 27, 2003 | Expiration date: May 27, 2003 | Permit id: 2003-011281 Mp | |||||
SCORE 99 Interior remodel to admnbus offices tip pkg w Permit type: Mechanical permit | Permit status: Final | Completion date: September 9, 2003 | Expiration date: September 9, 2003 | Permit id: 2003-018781 Mp | |||||
SCORE 99 Interior remodel to existing admnbus offices tip pkg p 1st flr area b Permit type: Mechanical permit | Permit status: Final | Completion date: July 24, 2003 | Expiration date: July 24, 2003 | Permit id: 2003-002373 Mp | |||||
SCORE 100 Interior administrative offices package i 1st floor area b Permit type: Electrical permit | Permit status: Final | Completion date: May 28, 2003 | Expiration date: May 28, 2003 | Permit id: 2003-011281 Ep | |||||
Interior administrative offices package i 1st floor area b Date: April 25, 2003 Value: $125,500 Permit type: Building permit | Permit status: Final | Completion date: June 4, 2003 | Expiration date: June 4, 2003 | Permit id: 2003-011281 Bp | |||||
SCORE 100 Interior non structural demo only b1st floor hank 2146814783 Permit type: Building permit | Permit status: Final | Completion date: September 2, 2011 | Expiration date: September 2, 2011 | Permit id: 2011-067427 Bp | |||||
SCORE 100 Interior non structural demo only b2nd floor Permit type: Building permit | Permit status: Final | Completion date: September 12, 2011 | Expiration date: September 12, 2011 | Permit id: 2011-067432 Bp | |||||
SCORE 100 Interior remodel to existing admnbusprof office Applicant Phone: (512) 520-2700 | Permit type: Building permit | Permit status: Final | Completion date: July 3, 2012 | Expiration date: July 3, 2012 | Permit id: 2012-044501 Bp | |||||
SCORE 100 Interior remodel to existing admnbusprof office Date: May 8, 2012 Contractor: John V Cook Permit type: Electrical permit | Permit status: Final | Completion date: May 9, 2012 | Expiration date: May 9, 2012 | Permit id: 2012-044501 Ep | |||||
SCORE 100 Interior remodel to existing admnbusprof office Date: May 9, 2012 Contractor: John Marchand Permit type: Mechanical permit | Permit status: Final | Completion date: May 25, 2012 | Expiration date: May 25, 2012 | Permit id: 2012-044501 Mp | |||||
SCORE 100 Interior nonstructural demo Permit type: Building permit | Permit status: Final | Completion date: February 14, 2013 | Expiration date: February 14, 2013 | Permit id: 2013-000685 Bp | |||||
SCORE 100 Interior non structural demo only b1st floor hank 2146814783 Permit type: Building permit | Permit status: Final | Completion date: September 2, 2011 | Expiration date: September 2, 2011 | Permit id: 2011-067427 Bp | |||||
SCORE 100 Interior non structural demo only b2nd floor Permit type: Building permit | Permit status: Final | Completion date: September 12, 2011 | Expiration date: September 12, 2011 | Permit id: 2011-067432 Bp | |||||
SCORE 99 Interior remodel to existing admnbus offices tippackage c 3rd floor area c Permit type: Mechanical permit | Permit status: Final | Completion date: April 10, 2003 | Expiration date: April 10, 2003 | Permit id: 2003-000577 Mp | |||||
SCORE 100 Interior non structural demo only c3rd floor Permit type: Building permit | Permit status: Final | Completion date: September 21, 2011 | Expiration date: September 21, 2011 | Permit id: 2011-067418 Bp | |||||
SCORE 100 Interior remodel to existing adminbusprof office Applicant Phone: (512) 520-2700 | Permit type: Building permit | Permit status: Final | Completion date: January 11, 2012 | Expiration date: January 11, 2012 | Permit id: 2011-089163 Bp | |||||
SCORE 100 Interior remodel to existing adminbusprof office Date: October 10, 2011 Contractor: John V Cook Permit type: Electrical permit | Permit status: Final | Completion date: January 4, 2012 | Expiration date: January 4, 2012 | Permit id: 2011-089163 Ep | |||||
SCORE 100 Interior remodel to existing adminbusprof office Date: October 17, 2011 Contractor: John Marchand Permit type: Mechanical permit | Permit status: Final | Completion date: November 8, 2011 | Expiration date: November 8, 2011 | Permit id: 2011-089163 Mp | |||||
SCORE 100 Interior remodel to existing adminbusprof office Date: October 17, 2011 Contractor: Eugene Hester Permit type: Plumbing permit | Permit status: Final | Completion date: December 20, 2011 | Expiration date: December 20, 2011 | Permit id: 2011-089163 Pp | |||||
SCORE 100 Interior non structural demo only c3rd floor Permit type: Building permit | Permit status: Final | Completion date: September 21, 2011 | Expiration date: September 21, 2011 | Permit id: 2011-067418 Bp | |||||
SCORE 100 Interior remodel to existing adminbusprof office Applicant Phone: (512) 520-2709 | Permit type: Building permit | Permit status: Final | Completion date: January 11, 2012 | Expiration date: January 11, 2012 | Permit id: 2011-089163 Bp | |||||
SCORE 100 Interior remodel to existing admnbus offices bldg c 4th floor Applicant Phone: (512) 520-2700 | Permit type: Building permit | Permit status: Final | Completion date: March 14, 2016 | Expiration date: March 14, 2016 | Permit id: 2015-114264 Bp | |||||
SCORE 100 Interior remodel to existing admnbus offices bldg c 4th floor Date: December 9, 2015 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: March 1, 2016 | Expiration date: March 1, 2016 | Permit id: 2015-114264 Ep | |||||
SCORE 93 Interior remodel to existing admnbus offices bldg c 4th floor Date: December 9, 2015 Contractor: Tu Huynh Permit type: Mechanical permit | Permit status: Final | Completion date: March 11, 2016 | Expiration date: March 11, 2016 | Permit id: 2015-114264 Mp | |||||
SCORE 100 Interior remodel to existing admnbus offices bldg c 4th floor Date: December 29, 2015 Contractor: Billy Wayne Angell Jr Permit type: Plumbing permit | Permit status: Final | Completion date: February 26, 2016 | Expiration date: February 26, 2016 | Permit id: 2015-114264 Pp | |||||
SCORE 71 Interior remodel to existing administrative offices Permit type: Mechanical permit | Permit status: Final | Completion date: May 27, 2005 | Expiration date: May 27, 2005 | Permit id: 2005-001923 Mp | |||||
SCORE 100 Interior remodel to existing admnbus offices bldg c 4th floor Date: December 9, 2015 Contractor: Gary Fraser Permit type: Electrical permit | Permit status: Final | Completion date: March 1, 2016 | Expiration date: March 1, 2016 | Permit id: 2015-114264 Ep | |||||
SCORE 100 Interior remodel to existing admnbus offices bldg c 4th floor Applicant Phone: (512) 520-2709 | Permit type: Building permit | Permit status: Final | Completion date: March 14, 2016 | Expiration date: March 14, 2016 | Permit id: 2015-114264 Bp | |||||
SCORE 93 Interior remodel to existing admnbus offices bldg c 4th floor Date: December 9, 2015 Contractor: Tu Huynh Permit type: Mechanical permit | Permit status: Final | Completion date: March 11, 2016 | Expiration date: March 11, 2016 | Permit id: 2015-114264 Mp | |||||
SCORE 100 Interior remodel to existing adminbusprof office Applicant Phone: (512) 520-2709 | Permit type: Building permit | Permit status: Final | Completion date: May 15, 2012 | Expiration date: May 15, 2012 | Permit id: 2011-078831 Bp | |||||
SCORE 100 Interior non structural demo only bcr1c Permit type: Building permit | Permit status: Final | Completion date: October 6, 2011 | Expiration date: October 6, 2011 | Permit id: 2011-067406 Bp | |||||
SCORE 100 Interior remodel to existing adminbusprof office Applicant Phone: (512) 520-2700 | Permit type: Building permit | Permit status: Final | Completion date: May 15, 2012 | Expiration date: May 15, 2012 | Permit id: 2011-078831 Bp | |||||
SCORE 100 Interior remodel to existing adminbusprof office Date: October 13, 2011 Contractor: John V Cook Permit type: Electrical permit | Permit status: Final | Completion date: April 26, 2012 | Expiration date: April 26, 2012 | Permit id: 2011-078831 Ep | |||||
SCORE 100 Interior remodel to existing adminbusprof office Date: February 2, 2012 Contractor: John Marchand Permit type: Mechanical permit | Permit status: Final | Completion date: April 25, 2012 | Expiration date: April 25, 2012 | Permit id: 2011-078831 Mp | |||||
SCORE 100 Interior remodel to existing adminbusprof office Date: February 2, 2012 Contractor: Eugene Hester Permit type: Plumbing permit | Permit status: Final | Completion date: May 3, 2012 | Expiration date: May 3, 2012 | Permit id: 2011-078831 Pp | |||||
SCORE 100 Interior non structural demo only bcr1c Permit type: Building permit | Permit status: Final | Completion date: October 6, 2011 | Expiration date: October 6, 2011 | Permit id: 2011-067406 Bp | |||||
SCORE 100 Interior non structural demo only c1st floor Permit type: Building permit | Permit status: Final | Completion date: October 6, 2011 | Expiration date: October 6, 2011 | Permit id: 2011-067414 Bp | |||||
SCORE 100 Interior non structural demo only c1st floor Permit type: Building permit | Permit status: Final | Completion date: October 6, 2011 | Expiration date: October 6, 2011 | Permit id: 2011-067414 Bp |