Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Hra--- misc mechanical for condesor replacement (no alterations to existing elect system) for existing sfd Permit type: Mechanical : 80 - ac | Permit status: Permit finaled | Completion date: May 8, 2012 | Permit id: Pds2012-1030-20 | |||||
--- misc mechanical for condesor replacement (no alterations to existing elect system) for existing sfd Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 8, 2012 | Permit id: Pds2012-1030-20 | |||||
4000sf re-roof for existing sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material asphalt proposed roofing material asphalt manufacturer gaf brand and model timberline, natural shadow color (if cool roof required) artic white built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) required building inspector field verification (if applicable) yes, complete re-roof note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 9, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 70 --- misc mechanical for condesor replacement (no alterations to existing elect system) for existing sfd Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 8, 2012 | Permit id: Pds2012-1030-20 | |||||
SCORE 86 4000sf re-roof for existing sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material asphalt proposed roofing material asphalt manufacturer gaf brand and model timberline, natural shadow color (if cool roof required) artic white built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) required building inspector field verification (if applicable) yes, complete re-roof note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: November 9, 2015 | Permit id: Pds2015-Resalt- | |||||
Final Permit status: Pass | Permit id: Pds2015-Resalt- | |||||
Final Permit status: Pass | Permit id: Pds2005-1007-20 | |||||
Final Permit status: Pass | Permit id: Pds2012-1030-20 | |||||
Final Permit status: Pass | Permit id: Pds2008-1007-20 | |||||
Final Permit status: Pass | Permit id: Pds2006-1007-20 |