Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Non-illuminated free standing sign Date: May 17, 2007 Permit status: Closed | Permit id: 07-02414 | |||||
Date: April 16, 2003 Permit status: Closed | Permit id: 03-01553 | |||||
Other Date: June 21, 2004 Permit status: Closed | Permit id: 03-00728 | |||||
Date: December 10, 2002 Permit status: Closed | Permit id: 02-05494 | |||||
Sprinkler system Date: June 30, 2000 Permit status: Issued | Permit id: 00-03176 | |||||
Permit 14-05325 requires a flood plain development permit Date: April 29, 2014 Permit status: Plan check | Permit id: 14-05918 | |||||
Moving metal building 24 northwest to the side of existing building for cotton mill studios Date: May 28, 2014 Permit type: Other | Permit status: Plan check | Permit id: 14-07389 | |||||
Permit 14-07389 requires a flood plain development permit Date: May 28, 2014 Permit status: Plan check | Permit id: 14-07396 | |||||
SCORE 89 Fire alarm for old cotton mill to remove and replace fire alarm communicator Date: October 21, 2014 Contractor: Alltek Systems Design Client: Old Cotton Mill | Permit type: Fire alarm | Permit status: Finaled | Current use: Fire | Permit id: 14-07686 | Parcel: 10791 | |||||
Cotton mill studio mural Date: August 30, 2010 Permit status: Closed | Permit id: 10-04723 | |||||
Cloth fiber workshop Date: May 10, 2010 Permit status: Closed | Permit id: 10-01874 | |||||
Commercial occupancy for metal and thread antique shop unit a & b;no work to be done;sls Date: April 16, 2014 Permit id: 14-05325 | |||||
SCORE 100 Fire alarm for old cotton mill to remove and replace fire alarm communicator Date: June 9, 2014 Contractor: Barlow Electrical Service Client: Old Cotton Mill | Permit type: Com: electrical | Permit status: Issued | Current use: Commercial | Permit id: 14-07687 | Parcel: 10791 | |||||
SCORE 100 Illuminated free standing sign Date: May 17, 2007 Contractor: Cheadle Art And Sign Co Client: Cotton Mill Studios | Permit type: Stand alone sign | Permit status: Closed | Current use: Sign | Permit id: 07-02414 | Parcel: 10791 | |||||
Commercial occupancy and open flame for jeribella unit h;no work to be done; silversmithing studio, making jewelry; Client: Jeribella | Permit type: Occupancy | Permit status: Co issued | Current use: Over the counter | Permit id: 16-02015 | Parcel: 10791 | |||||
02015 requires a flood plain development permit Permit type: Flood | Permit status: Finaled | Current use: Stormwater | Permit id: 16-02128 | Parcel: 10791 | |||||
SCORE 100 Commercial occupancy, change of use, abc, remodel for asheville guitar co;building 3 walls and adding bathroom, pelace existing window with exterior door, new 4 sq foot deck and new handicap ramp and electrical work; Date: June 23, 2016 Contractor: Crown Electric Services Client: Asheville Guitar Co Unit D | Permit type: Com: electrical | Permit status: Finaled | Current use: Commercial | Permit id: 16-02717 | Parcel: 10791 | |||||
SCORE 100 07389 requires a flood plain development permit Date: June 23, 2014 Contractor: Sun Construction And Realty Inc Permit type: Flood | Permit status: Issued | Current use: Stormwater | Permit id: 14-07396 | Parcel: 10791 | |||||
Commercial occupancy and open flame for jeribella;no work to be done; Client: Jeribella | Permit type: Fire: operational | Permit status: Finaled | Current use: Fire | Permit id: 16-02017 | Parcel: 10791 | |||||
SCORE 82 Commercial occupancy, change of use, abc, remodel for asheville guitar co;building 3 walls and adding bathroom, pelace existing window with exterior door, new 4 sq foot deck and new handicap ramp and electrical work; Date: June 23, 2016 Contractor: Plumbsmart Technologies Client: Asheville Guitar Co Unit D | Permit type: Com: plumbing | Permit status: Finaled | Current use: Commercial | Permit id: 16-02718 | Parcel: 10791 | |||||
SCORE 80 Commercial occupancy, change of use, abc, remodel for asheville guitar co;building 3 walls and adding bathroom, pelace existing window with exterior door, new 4 sq foot deck and new handicap ramp and electrical work; Date: July 15, 2016 Contractor: Paul Olszewski Client: Asheville Guitar Co Unit D | Permit type: Abc | Permit status: Closed | Current use: Over the counter | Permit id: 16-02720 | Parcel: 10791 | |||||
SCORE 82 Vents for bathroom exhaust Date: June 23, 2016 Contractor: Buckingham Heating And Cooling Client: Asheville Guitar Bar Co Unit D | Permit type: Com: mechanical | Permit status: Finaled | Current use: Commercial | Permit id: 16-06330 | Parcel: 10791 | |||||
Commercial occupancy for metal and thread antique shop unit a & b;no work to be done;sls Permit type: Occupancy | Permit status: Inspections | Current use: Over the counter | Permit id: 14-05325 | Parcel: 10791 | |||||
05325 requires a flood plain development permit Permit type: Flood | Permit status: Issued | Current use: Stormwater | Permit id: 14-05918 | Parcel: 10791 | |||||
Building enforcement Permit status: In compliance | Current use: Complaint-enforcement | Permit id: 02-01659s | Parcel: 10791 | |||||
Metal building; recd electrical and misc;cah;2/26/03 9:12:25 am; p&z#03-11012; recd plan changes;cah; recd application for mountain air to add gas piping. Pmd; zoning permit needs to be applied for. Pmd; planning level one approve - metal building for kiln. Setbacks along street right of ways must be measured from the street right of way line or the street, whichever is closest to the property. All other setbacks are to be measured from the property boundary lines. Setbacks also apply such items as porches, decks, patios, etc.; contact natalie berry at redacted phone number.; discussed anchoring of building to withstand flood waters and the finished floor elevation to be 1 foot above the base flood elevation for the site. Waiting on further directions. At this point can not approve the permit. For more information contact natalie berry at redacted phone number. 3/17/03 11:15:44 am; ron evans indicated that i could send the plans on to review as is and he would work with them. I am fa Permit type: Com: other new | Permit status: Closed | Permit id: 03-00728 | Parcel: 10791 | |||||
SCORE 100 Com: site work Contractor: Sun Construction And Realty Inc Permit status: Issued | Permit id: 14-07390 | Parcel: 10791 | |||||
Flood Permit status: Finaled | Permit id: 16-02128 | Parcel: 10791 | |||||
SCORE 100 Com: electrical Contractor: Crown Electric Services Permit status: Finaled | Permit id: 16-02717 | Parcel: 10791 | |||||
SCORE 82 Com: plumbing Contractor: Plumbsmart Technologies Permit status: Finaled | Permit id: 16-02718 | Parcel: 10791 | |||||
SCORE 80 Abc Contractor: Paul Olszewski Permit status: Closed | Permit id: 16-02720 | Parcel: 10791 | |||||
Flood Permit status: Issued | Permit id: 14-05918 | Parcel: 10791 | |||||
SCORE 100 Com: electrical Contractor: Barlow Electrical Service Permit status: Issued | Permit id: 14-07687 | Parcel: 10791 | |||||
Commercial occupancy and open flame for jeribella unit h;no work to be done;silversmithing studio, making jewelry; the existing building address 122 is an even number on what should be the odd side number of riverside dr. No alpha numeric designation like an a or a b can be used. Property owner or management should submit proposed suite numbering schematic to my attention. Stuart rohrbaugh 828. Redacted phone number Permit type: Occupancy | Permit status: Co issued | Permit id: 16-02015 | Parcel: 10791 | |||||
SCORE 82 Com: mechanical Contractor: Buckingham Heating And Cooling Permit status: Finaled | Permit id: 16-06330 | Parcel: 10791 | |||||
The existing building address 122 is an even number on what should be the odd side number of riverside dr. No alpha numeric designation like an a or a b can be used. Property owner or management should submit proposed suite numbering schematic to my attention. Stuart rohrbaugh 828. Redacted phone number Permit type: Fire: operational | Permit status: Finaled | Permit id: 16-02017 | Parcel: 10791 | |||||
Commercial occupancy and open flame for jeribella unit h;no work to be done; silversmithing studio, making jewelry; Date: March 1, 2016 Client: Jeribella | Permit type: Occupancy | Permit status: Co issued | Current use: Over the counter | Permit id: 16-02015 | Parcel: 10791 | |||||
02015 requires a flood plain development permit Date: February 25, 2016 Permit type: Flood | Permit status: Finaled | Current use: Stormwater | Permit id: 16-02128 | Parcel: 10791 | |||||
Commercial occupancy and open flame for jeribella;no work to be done; Date: February 23, 2016 Client: Jeribella | Permit type: Fire: operational | Permit status: Finaled | Current use: Fire | Permit id: 16-02017 | Parcel: 10791 | |||||
05325 requires a flood plain development permit Date: April 30, 2014 Permit type: Flood | Permit status: Issued | Current use: Stormwater | Permit id: 14-05918 | Parcel: 10791 | |||||
Building enforcement Date: December 13, 2002 Permit status: In compliance | Current use: Complaint-enforcement | Permit id: 02-01659s | Parcel: 10791 | |||||
Commercial Date: June 21, 2004 Value: $4,800 Permit status: Closed | Permit id: 03-00728 | |||||
Commercial Date: December 10, 2002 Value: $600 Permit status: Closed | Permit id: 02-05494 | |||||
Historical Date: December 31, 2002 Value: $1,500 Permit status: Closed | Permit id: 02-05496 | |||||
Fire Date: June 30, 2000 Value: $400 Permit status: Issued | Permit id: 00-03176 | |||||
Cotton mill studio mural Date: August 30, 2010 Value: $2,000 Permit type: Commercial | Permit status: Closed | Permit id: 10-04723 | |||||
SCORE 99 Comment date: wed apr 16 00:00: edt 2003 - --- permit for one attached wall sign (to be development i. D. Sign)-- 41 sq. Ft --- foam letters attached to bldg. W/ silicone adhesive... ---; comment date: Date: April 16, 2003 Contractor: Lettering By Larry Colemon Client: Cotton Mill Studios | Permit type: Stand alone sign | Permit status: Closed | Current use: Sign | Permit id: 03-01553 | Parcel: 10791 | |||||
Metal building; recd electrical and misc;cah;2 26 03 9:12:25 am; p&z#03-11012; recd plan changes;cah; recd application for mountain air to add gas piping. Pmd; zoning permit needs to be applied for. Pmd; planning level one approve - metal building for kiln. Setbacks along street right of ways must be measured from the street right of way line or the street, whichever is closest to the property. All other setbacks are to be measured from the property boundary lines. Setbacks also apply such items as porches, decks, patios, etc.; contact natalie berry at redacted phone number.; discussed anchoring of building to withstand flood waters and the finished floor elevation to be 1 foot above the base flood elevation for the site. Waiting on further directions. At this point can not approve the permit. For more information contact natalie berry at redacted phone number. 3 17 03 11:15:44 am; ron evans indicated that i could send the plans on to review as is and he would work with them. I am fa Date: June 21, 2004 Permit type: Com: other new | Permit status: Closed | Permit id: 03-00728 | Parcel: 10791 | |||||
SCORE 98 Repairs at old cotton mill - artist studio:; mixed-use has not been approved by zoning. Jeff baker talked with the realator for this property, binna green, on 10/31/02. She was informed of this decision and told to proceed with zoning approval first.; call bob vickery and the fire inspector for inspections upon completion of sprinkler work, smoke detector and railing. Loft is to be used for storage only; cost do not exceed 50% of fair market value of the building. Approved for addition of fire sprinkler equipment. Njb 12/10/2002 Client: Old Cotton Mill-Artist Sp | Permit type: Com: remodel | Permit status: Closed | Current use: Commercial | Permit id: 02-05494 | Parcel: 10791 | |||||
SCORE 100 Comment date: thu jun 29 00:00: edt 20 - old cotton mill bldg:; comment date: fri jun 00:00: edt 20 - >>>>fire prevention comments<<<< inspections must be requested between 8:00am to 9:30am and 4:00pm Client: Old Cotton Mill Bldg | Permit type: Sprinkler sys. | Permit status: Closed | Current use: Fire | Permit id: 00-03176 | Parcel: 10791 | |||||
SCORE 100 Comment date: thu feb 00:00: est 2003 - metal building; comment date: wed feb 26 00:00: est 2003 - recd electrical and misc;cah;2/26/03 9:12:25 am; comment date: fri feb 28 00:00: est 2003 - p&z#03-11 Client: Black | Permit type: Com: other new | Permit status: Closed | Current use: Commercial | Permit id: 03-00728 | Parcel: 10791 | |||||
SCORE 100 Comment date: thu feb 00:00: est 2003 - metal building; comment date: wed feb 26 00:00: est 2003 - recd electrical and misc;cah;2/26/03 9:12:25 am; comment date: fri feb 28 00:00: est 2003 - p&z#03-11 Client: Black | Permit type: Com: other new | Permit status: Closed | Current use: Commercial | Permit id: 03-00728 | Parcel: 10791 | |||||
SCORE 100 September 24, 2009 9:38: am heatherr. Cotton mill studios unit c; pipe and stub for soildering torch to satisfy fire marshal via fax. Call dan stewart @ redacted phone number for inspection. Date: October 5, 2009 Contractor: Public Service Co Of Nc Client: Cotton Mill Studios Unit | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 09-04858 | Parcel: 997918 | |||||
SCORE 98 Renovations to suite c & f; recd zoning plans and application;cah; p&z#02-10124; received amendment to change application to read "change of use permit to be 2 residential units".; per bob vickery: type this on cc. The loft in unit f is not to be used for sleeping.; renovations to units c & f. The loft in unit f is not to be used for sleeping. Issued by ssb.; wnc air pollution approved by mike matthews recd fax; building safety review comments the approved plans with the attached review comments are required to be at the job site for use by the field inspector(s) at all times. The building permit is required to be posted at the jobsite at all times. Call harry taylor for building inspection at redacted phone number all subcontractors shall contact building safety (redacted phone number) to activate electrical, plumbing & mechanical permits. Smoke alarm system to be installed in accordance with code section 907. 2. 10. 1. 2 of the state building code. A separate alarm permit is Date: December 13, 2002 Contractor: Nilsson Construction Co Inc Client: Suite C & F | Permit type: Com: remodel | Permit status: Closed | Current use: Commercial | Permit id: 02-05117 | Parcel: 10791 | |||||
SCORE 100 Old cotton mill:; >>>>fire prevention comments<<<< no plans required, changing heads to quick response type for change of use in two units. Call herb roberson or lewis garrison for fire inspection at redacted phone number: inspections must be requested between 8:00am to 9:30am and 4:00pm to 4:30pm Client: Old Cotton Mill | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 02-05496 | Parcel: 10791 | |||||
SCORE 80 Rec tranmsittal form for ada ramp amendment relating to section 3411. 7; rec transmittal form to provide elevation certificate. Date: July 15, 2016 Contractor: Paul Olszewski Permit type: Flood | Permit status: Finaled | Current use: Stormwater | Permit id: 16-02876 | Parcel: 10791 | |||||
SCORE 100 April 12, 20 9:46:31 am alisam. Cloth fiber workshop - new perm wall sign;aml; application approved for permanent wall sign in river district. Multi tenant. Size of sign is 4x2 for a total of 8 sf of non-illuminated signage. Signs shall not project above the building soffit, eave line, roof line, or building parapet. Signs shall not be placed on the roof. Zoning is approved. April 15, 20 9:48:49 am janicew.; april 12, 20 9:52:02 am alisam. Cost of work required;aml; received application and site plans. April 13, 20 9:03: am soconner.; gave application and site plans to chuck watson for review. April 13, 20 9:25:22 am soconner.; the application is for a non-illuminated sign attached to an existing building. A flood permit is not required.; this permit is issued based on information provided by the applicant as to matters of title to the property involved. The city has undertaken no examination of title and this permit may not be construed as an opinion of title. Upon request permit a Date: May 10, 2010 Contractor: Applicant Client: Cloth Fiber Workshop | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 10-01874 | Parcel: 10791 | |||||
SCORE 80 Commercial occupancy, change of use, abc, remodel for asheville guitar bar co;building 3 walls and adding bathroom, pelace existing window with exterior door, new 4 sq foot deck and new handicap ramp and electrical work; fyi. I will add this to my copy of the application info and enter it into my file records. Ric ledford, cfm (828) redacted phone number from: paul olszewski [mailto:olszewski6868@gmail. Com] sent: tuesday, march 08, 2016 1:24 pm to: ric ledford subject: re: 122 riverside dr. Project (permit #16-02711) plumbing costs are 58 sent from my iphone on mar 8, 2016, at 11:42 am, ric ledford Date: July 15, 2016 Contractor: Paul Olszewski Client: Asheville Guitar Bar Co Unit D | Permit type: Com: remodel | Permit status: Co issued | Current use: Commercial | Permit id: 16-02711 | Parcel: 10791 | |||||
SCORE 77 August 20, 20 8:43:26 am ssalyer. Stucco over brick on portion of building to prepare wall for painted mural on building for cotton mill studio;sls flood fee reduced to 75. Per chuck and mccray;sls; august 24, 20 11:50:07 am ssalyer. Per robert griffin permit fees reduced to 78. For flood permit only; no charge building fire and no plan review fee;sls; august 20, 20 8:50:33 am ssalyer. Contractor needs to obtain city license;sls; received application. August 23, 20 1:18:27 pm soconner.; received application. August 23, 20 1:29:44 pm soconner.; building code inspection requests must be received before 7: a. M.: phone: redacted phone number. Internet: go to www. Ashevillenc. Gov; select online services; select permit tracking help; select development & building permit tracking tool and enter permit # the building code inspectors assigned to this project can be reached on their cell: building - anne graham redacted phone number electrical - jay eichhorn redacted phone number plumbing / m Client: Cotton Mill Studio Mural | Permit type: Com: remodel | Permit status: Closed | Current use: Commercial | Permit id: 10-04723 | Parcel: 10791 | |||||
SCORE 100 Moving metal building 24 northwest to the side of existing building for cotton mill studios; rec amendment, changing the cost of work to 2875. 00. Adc. Date: June 23, 2014 Contractor: Sun Construction And Realty Inc Permit type: Com: other new | Permit status: Issued | Permit id: 14-07389 | Parcel: 10791 | |||||
SCORE 100 Com: site work Date: June 23, 2014 Contractor: Sun Construction And Realty Inc Permit status: Issued | Permit id: 14-07390 | Parcel: 10791 | |||||
SCORE 100 Moving metal building 24 northwest to the side of existing building for cotton mill studios Date: June 23, 2014 Contractor: Sun Construction And Realty Inc Client: Cotton Mill Studios- Metal Building | Permit type: Fire prevention | Permit status: Finaled | Current use: Fire | Permit id: 14-08054 | Parcel: 10791 | |||||
Flood Date: April 30, 2014 Permit status: Issued | Permit id: 14-05918 | Parcel: 10791 | |||||
SCORE 100 Com: electrical Date: June 9, 2014 Contractor: Barlow Electrical Service Permit status: Issued | Permit id: 14-07687 | Parcel: 10791 | |||||
SCORE 100 Moving metal building 24 northwest to the side of existing building for cotton mill studios rehooking electrical to metal building Date: August 13, 2014 Contractor: Current Energy Llc Client: Cotton Mill Studios- Metal Building | Permit type: Com: electrical | Permit status: Finaled | Current use: Commercial | Permit id: 14-11259 | Parcel: 10791 | |||||
Flood Date: February 25, 2016 Permit status: Finaled | Permit id: 16-02128 | Parcel: 10791 | |||||
SCORE 100 Com: electrical Date: June 23, 2016 Contractor: Crown Electric Services Permit status: Finaled | Permit id: 16-02717 | Parcel: 10791 | |||||
SCORE 82 Com: plumbing Date: June 23, 2016 Contractor: Plumbsmart Technologies Permit status: Finaled | Permit id: 16-02718 | Parcel: 10791 | |||||
SCORE 80 Abc Date: July 15, 2016 Contractor: Paul Olszewski Permit status: Closed | Permit id: 16-02720 | Parcel: 10791 | |||||
Commercial occupancy and open flame for jeribella unit h;no work to be done;silversmithing studio, making jewelry; the existing building address 122 is an even number on what should be the odd side number of riverside dr. No alpha numeric designation like an a or a b can be used. Property owner or management should submit proposed suite numbering schematic to my attention. Stuart rohrbaugh 828. Redacted phone number Date: March 1, 2016 Permit type: Occupancy | Permit status: Co issued | Permit id: 16-02015 | Parcel: 10791 | |||||
SCORE 80 Rec transmittal form for handicap bathroom revision-ara exit and space exit signs and door hardware/lighting specs; rec tranmsittal form for ada ramp amendment relating to section 3411. 7 Date: July 15, 2016 Contractor: Paul Olszewski Permit type: Fire prevention | Permit status: Finaled | Permit id: 16-02719 | Parcel: 10791 | |||||
SCORE 100 Commercial occupancy, change of use, abc, remodel for asheville guitar co;building 3 walls and adding bathroom, pelace existing window with exterior door, new 4 sq foot deck and new handicap ramp and electrical work; Date: July 1, 2016 Contractor: Diboco Fire Sprinklers Inc Client: Asheville Guitar Co Unit D | Permit type: Sprinkler sys. | Permit status: Finaled | Current use: Fire | Permit id: 16-05687 | Parcel: 10791 | |||||
SCORE 82 Com: mechanical Date: June 23, 2016 Contractor: Buckingham Heating And Cooling Permit status: Finaled | Permit id: 16-06330 | Parcel: 10791 | |||||
The existing building address 122 is an even number on what should be the odd side number of riverside dr. No alpha numeric designation like an a or a b can be used. Property owner or management should submit proposed suite numbering schematic to my attention. Stuart rohrbaugh 828. Redacted phone number Date: February 23, 2016 Permit type: Fire: operational | Permit status: Finaled | Permit id: 16-02017 | Parcel: 10791 | |||||
Mugen studios Date: February 26, 2013 Permit status: Closed | Permit id: 13-00192 | |||||
Mugen studios Client: Mugen Studios | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 13-00192 | Parcel: 1914478 | |||||
January 8, 2013 3:08:52 pm scarver. Occupacny permit no work for mugen studios-suite c;scc; february 26, 2013 1:15:13 pm heatherr. Occupacny permit no work for mugen studios-suite c; har; review comments the new tenant use must be inspected. A deputy fire marshal from the asheville fire department will make an inspection. Before you call for that inspection, you must be ready. The items listed below are the most common items the deputy fire marshal will be looking for. Address: every building and/or business suite is required to post approved address numbers that are visible from the street and alley. Address numbers shall be a minimum of six (6) inches in height and contrast with their background. Suite or room numbers shall be a minimum of (4) inches in height and contrast with their background. Tenant identification: space with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Six inch letters Permit type: Permits - historical | Permit status: Closed | Permit id: 13-00192 | Parcel: 1914478 | |||||
Mugen studios Date: February 26, 2013 Client: Mugen Studios | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 13-00192 | Parcel: 1914478 | |||||
January 8, 2013 3:08:52 pm scarver. Occupacny permit no work for mugen studios-suite c;scc; february 26, 2013 1:15:13 pm heatherr. Occupacny permit no work for mugen studios-suite c; har; review comments the new tenant use must be inspected. A deputy fire marshal from the asheville fire department will make an inspection. Before you call for that inspection, you must be ready. The items listed below are the most common items the deputy fire marshal will be looking for. Address: every building and or business suite is required to post approved address numbers that are visible from the street and alley. Address numbers shall be a minimum of six (6) inches in height and contrast with their background. Suite or room numbers shall be a minimum of (4) inches in height and contrast with their background. Tenant identification: space with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and or address. Six inch letters Date: February 26, 2013 Permit type: Permits - historical | Permit status: Closed | Permit id: 13-00192 | Parcel: 1914478 |