Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Interior remodeling -misc wiring - outlets/switches to final out this project, ref. Elec permit #27005677. Date: April 13, 2010 Client: Loofboro, Brian | Permit id: Elect20101251 | |||||
Interior remodeling - these permits are a continuation of permit #27005673 (bldg), #27005677 (e) and #28000905 (m) and zoning clearance: #07-0726. These permits need to be finaled. Original description read as follows: 9 x addition for cars onto front of gargae, take 9 x from the back of garage (became a kitchen), re-side and re-roof, add new doors (garage area only) and windows. Raise the roof to raise the ceiling to 8 remodel 5 x 7 bathroom and add a 8 x 4 closet to change living room to bdrm. Per zoning clearance: #07-0726. Setbacks; n 6, e 31, s ex), w ex). Per b. A. 5/21/07. Date: April 15, 2010 Value: $2,000 Client: Loofboro, Brian | Permit id: Sfd20101354 | |||||
Gas line to new meter need total btu - 2 btu Date: May 5, 2010 Value: $175 Permit id: Mech20101572 | |||||
(1) ks Date: May 5, 2010 Value: $1,000 Permit id: Plum20101407 | |||||
SCORE 96 Two week service work list Date: May 19, 2010 Contractor: Nicor Gas Permit id: Row20101715 | |||||
SCORE 100 Bath rough-in - lav, wc, shex 1" water line Client: Loofboro, Brian | Permit id: Plum20101854 | |||||
(electrical) misc wiring - (8) outlets and (3) lights/switch outlets. 2nd phase of work and final inspection work. Demo wall between two bdrms to make one and add walls to make closet and bathroom. Date: September 7, 2010 Client: Loofboro, Brian | Permit id: Elect20101674 | |||||
(plumbing) - (1) shower and (1) tub. 2nd phase of work - demo wall between two bdrms to make one and add walls to make closet and bathroom. Date: September 7, 2010 Client: Loofboro, Brian | Permit id: Plum20101861 | |||||
2nd phase of work - demo wall between two bdrms to make one and add walls to make closet and bathroom. Date: September 7, 2010 Value: $8,000 Client: Loofboro, Brian | Permit id: Sfd20102676 | |||||
SCORE 100 (mechanical) exhaust bath fan - 2nd phase of work - demo wall between two bdrms to make one and add walls to make closet and bathroom. Date: September 7, 2010 Contractor: Home Owner Client: Loofboro, Brian | Permit id: Mech20102143 | |||||
SCORE 64 Interior remodeling - these permits are a continuation of permit #27005673 (bldg), #27005677 (e) and #28000905 (m) and zoning clearance: #07-0726. These permits need to be finaled. Original description read as follows: 9 x addition for cars onto front of gargae, take 9 x from the back of garage (became a kitchen), re-side and re-roof, add new doors (garage area only) and windows. Raise the roof to raise the ceiling to 8 remodel 5 x 7 bathroom and add a 8 x 4 closet to change living room to bdrm. Per zoning clearance: #07-0726. Setbacks; n 6, e 31, s ex), w ex). Per b. A. 5 21 07. Client: Loofboro, Brian | Permit id: Sfd20101354 | |||||
SCORE 64 (electrical) misc wiring - (8) outlets and (3) lights/switch outlets. 2nd phase of work and final inspection work. Demo wall between two bdrms to make one and add walls to make closet and bathroom. Date: September 7, 2010 Contractor: Loofboro Brian Client: Loofboro, Brian | Permit id: Elect20101674 | |||||
SCORE 96 Gas line to new meter need total btu - 2 btu Permit id: Mech20101572 | |||||
SCORE 64 (plumbing) - (1) shower and (1) tub. 2nd phase of work - demo wall between two bdrms to make one and add walls to make closet and bathroom. Date: September 7, 2010 Contractor: Loofboro Brian Client: Loofboro, Brian | Permit id: Plum20101861 | |||||
SCORE 64 2nd phase of work - demo wall between two bdrms to make one and add walls to make closet and bathroom. Client: Loofboro, Brian | Permit id: Sfd20102676 | |||||
SCORE 96 (1) ks Permit id: Plum20101407 | |||||
SCORE 64 Interior remodeling - these permits are a continuation of permit #27005673 (bldg), #27005677 (e) and #28000905 (m) and zoning clearance: #07-0726. These permits need to be finaled. Original description read as follows: 9 x addition for cars onto front of gargae, take 9 x from the back of garage (became a kitchen), re-side and re-roof, add new doors (garage area only) and windows. Raise the roof to raise the ceiling to 8 remodel 5 x 7 bathroom and add a 8 x 4 closet to change living room to bdrm. Per zoning clearance: #07-0726. Setbacks; n 6, e 31, s ex), w ex). Per b. A. 5/21/07. Client: Loofboro, Brian | Permit id: Sfd20101354 | |||||
SCORE 96 (1) ks Permit id: Plum20101407 | |||||
SCORE 64 2nd phase of work - demo wall between two bdrms to make one and add walls to make closet and bathroom. Client: Loofboro, Brian | Permit id: Sfd20102676 | |||||
SCORE 64 (electrical) misc wiring - (8) outlets and (3) lights switch outlets. 2nd phase of work and final inspection work. Demo wall between two bdrms to make one and add walls to make closet and bathroom. Date: September 7, 2010 Contractor: Loofboro, Brian Client: Loofboro, Brian | Permit id: Elect20101674 | |||||
SCORE 96 Gas line to new meter need total btu - 2 btu Permit id: Mech20101572 | |||||
SCORE 100 Interior remodeling -misc wiring - outlets switches to final out this project, ref. Elec permit #27005677. Date: April 13, 2010 Contractor: Homeowner Client: Loofboro, Brian | Permit id: Elect20101251 | |||||
SCORE 64 (plumbing) - (1) shower and (1) tub. 2nd phase of work - demo wall between two bdrms to make one and add walls to make closet and bathroom. Date: September 7, 2010 Contractor: Loofboro, Brian Client: Loofboro, Brian | Permit id: Plum20101861 | |||||
SCORE 100 Interior remodeling -misc wiring - outlets switches to final out this project, ref. Elec permit #27005677. Date: April 13, 2010 Contractor: Homeowner Client: Loofboro, Brian | Permit id: Elect20101251 | |||||
SCORE 100 Move gas line for the stove. 1/2" gas pipe size. Ref previous mechanical permit. #28000905 Date: April 13, 2010 Contractor: Home Owner Client: Loofboro, Brian | Permit id: Mech20101464 |