Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: July 3, 2007 Client: Matey John Edward | Permit status: Completed | Permit id: 87408 | |||||
Electrical permit Date: January 8, 2008 Client: Matey John Edward | Permit status: Completed | Permit id: 125193 | |||||
Plumbing permit Date: March 4, 2008 Client: Matey John Edward | Permit status: Completed | Permit id: 135936 | |||||
Alteration permit Date: February 6, 2008 Client: Matey John Edward | Permit status: Completed | Permit id: 109782 | |||||
Alteration permit Date: July 23, 2007 Client: Matey John Edward | Permit status: Completed | Permit id: 89966 | |||||
Alteration permit Date: February 6, 2008 Client: Matey John Edward | Permit status: Completed | Permit id: 109782 | |||||
Plumbing permit Date: March 4, 2008 Client: Matey John Edward | Permit status: Completed | Permit id: 135936 | |||||
Electrical permit Date: January 8, 2008 Client: Matey John Edward | Permit status: Completed | Permit id: 125193 | |||||
SCORE 59 Repairs to rear wall per engineers report. This permit is for repairs to walls only. Date: July 23, 2007 Contractor: Macto Design Build Llc Client: Matey John Edward | Permit type: Alteration permit | Permit status: Completed | Completion date: July 20, 2013 | Permit id: 89966 | |||||
SCORE 59 Ez permit-applicant agrees to limit the construction to comply with ez permit for alterations,7 3 07. Deviation from this standard will result in revocation of this permit and imposition of further penalties. Work to include:stucco,roof covering,sheathing and joist repair replacement as needed. Replace sub-flooring as needed. Date: July 3, 2007 Contractor: Macto Design Build Llc Client: Matey John Edward | Permit type: Alteration permit | Permit status: Completed | Completion date: July 10, 2007 | Permit id: 87408 | |||||
SCORE 93 5" curb trap,4" vent and 4" house drain 20172630241(sfd) "self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: September 21, 2017 Contractor: Lepore Plumbing Inc Client: Matey John Edward | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 22, 2017 | Permit id: 817813 | |||||
SCORE 98 Installation of drainage, waste and venting piping plus water dist complete to all proposed fxts: 3 wc, 1 ks, 4 lavs, 1 sh, 2 bt, 1 lt Date: March 4, 2008 Contractor: Russell Brown Client: Matey John Edward | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 3, 2008 | Permit id: 135936 | |||||
SCORE 100 Install 200amp service and wire single family dwelling as per 2005 nec (east district) Date: January 8, 2008 Contractor: Rosenberg Neil Client: Matey John Edward | Permit type: Electrical permit | Permit status: Completed | Completion date: August 31, 2010 | Permit id: 125193 | |||||
SCORE 83 Rebuild exterior walls as per engineers report and alterations as per plans Date: February 6, 2008 Contractor: Don Wanamaker Client: Matey John Edward | Permit type: Alteration permit | Permit status: Completed | Completion date: December 5, 2008 | Permit id: 109782 | |||||
SCORE 83 Repairs to stabilize roof front wall as per engineers report Date: September 20, 2007 Contractor: Don Wanamaker Client: Matey John Edward | Permit type: Alteration permit | Permit status: Completed | Completion date: December 5, 2008 | Permit id: 104401 |