Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 Install mechanical equipment double residence install gas line and gas water heater. Leroy perrier 277-5733 Date: May 8, 2001 Contractor: Leroy F. Perrien Client: Tutton, Roger H | Permit id: M01002833 | |||||
SCORE 98 Install mechanical equipment single-family dwelling install 5-ton a c with duct work and elec warm air furnace. Peter creppel - 347-1719 Date: May 10, 2001 Contractor: Pete Creppel Client: Tutton, Roger H | Permit id: M01002938 | |||||
Replace rotten siding in front gable and repair window. Finished installation of balcony railing and porch divider at end of balcony as privacy screen on gov nic side of rear balcony. Repair and repaint windows on the barracks side wall. Date: December 29, 2015 Permit type: Vcc general work | Permit status: Application submitted | Completion date: May 31, 2016 | Current use: Single family | Permit id: 15-38731-Vcgen | |||||
Replace rotten siding in front gable and repair window. Finished installation of balcony railing and porch divider at end of balcony as privacy screen on gov nic side of rear balcony. Repair and repaint windows on the barracks side wall. Date: January 19, 2017 Permit type: Vcc general work | Permit status: Application submitted | Current use: Half of a party wall double | Permit id: 17-02046-Vcgen | |||||
SCORE 56 Building addition (less than 50% new) multi-family dwelling build a two story addition on rear of existing 1 story 3-plex. As per plans & vcc #970733. Demo on permit b97005859. Date: March 13, 1998 Contractor: Steve Lacy Client: Tutton, Roger H | Permit id: B97005860 | |||||
SCORE 91 Consolidation of service multi-family dwelling michael emig Date: April 3, 2001 Contractor: Michael Emig Client: Lacey, Steve | Permit id: E01002439 |