Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
No water supply to the entire building. Fire department shut down the water line due to break in line at basement. Repair broken water line in baseme Date: March 4, 2014 Permit type: Plumb | Permit id: Ee17875 | |||||
(apt#1f) @ basement (gas fired hot water heater): make all necessary repairs to gas fired hot water heater. Restore to proper working condition. Resto Date: February 6, 2012 Permit type: Heat | Permit id: Ec20116 | |||||
(apt#4a) @ vestibule: trace, locate and repair water leak from above. Demolish and repair ceiling (24 sq ft) with sheetrock. Tape, compound, prime a Date: March 21, 2012 Permit type: Gc | Permit id: Ec25117 | |||||
SCORE 95 Equipment work Date: November 19, 2015 Contractor: Impact Builders Corp Permit status: Permit issued | Permit id: 32118212602 | |||||
SCORE 96 Plumbing Date: August 10, 2015 Contractor: Premier Sewer And Watermain Permit status: Permit issued | Permit id: 32118212601 | |||||
SCORE 100 Equipment work Date: August 10, 2015 Contractor: Building Usa Llc Permit status: Permit issued | Permit id: 32118212601 | |||||
Nationalgrid provide gas to boiler/hot water heater Date: July 1, 2010 Permit type: Util | Permit id: Eb03570 | |||||
Nationalgrid provide gas to boiler/hot water heater Date: July 1, 2009 Permit type: Util | Permit id: Ea02273 | |||||
Nationalgrid provide gas to boiler/hot water heater Date: July 1, 2012 Permit type: Util | Permit id: Ed00447 | |||||
Nationalgrid provide gas to boiler/hot water heater Date: July 18, 2008 Permit type: Util | Permit id: E902102 | |||||
Nationalgrid provide gas to boiler/hot water heater Date: July 1, 2013 Permit type: Util | Permit id: Ee01062 | |||||
Install new pilot assembly, gas valve, feeder, and glass gauges assembly. Restore heat to entire building. Note: contractor must contact h. P. D. @( Date: December 5, 2008 Permit type: Heat | Permit id: E917126 | |||||
Nationalgrid provide gas to boiler/hot water heater Date: July 1, 2014 Permit type: Util | Permit id: Ef02505 | |||||
Nationalgrid provide gas to boiler/hot water heater Date: July 1, 2011 Permit type: Util | Permit id: Ec00704 | |||||
Nationalgrid provide gas to boiler hot water heater Date: March 6, 2012 Permit type: Util | Permit id: Ec23283 | |||||
Nationalgrid provide gas to boiler hot water heater Date: July 1, 2011 Permit type: Util | Permit id: Ec00704 | |||||
Nationalgrid provide gas to boiler hot water heater Date: July 1, 2014 Permit type: Util | Permit id: Ef02505 | |||||
Nationalgrid provide gas to boiler hot water heater Date: January 31, 2013 Permit type: Util | Permit id: Ed15781 | |||||
Nationalgrid provide gas to boiler hot water heater Date: July 18, 2008 Permit type: Util | Permit id: E902102 | |||||
Nationalgrid provide gas to boiler hot water heater Date: July 1, 2009 Permit type: Util | Permit id: Ea02273 | |||||
Nationalgrid provide gas to boiler hot water heater Date: July 1, 2010 Permit type: Util | Permit id: Eb03570 | |||||
Apt 4a: provide and install (1) window guard throughout entire apartment. As per the requirements contract with hpd Date: March 27, 2012 Permit type: Gc | Permit id: Ec25557 | |||||
Basement. Install a new gas fired water heater to replace leaking 75 gallon heater. Remove all work related debris. Contractor must Date: January 4, 2012 Permit type: Heat | Permit id: Ec16952 | |||||
Apt#4a: (north#3 aka livingroom): trace and repair the source of water leak from roof, sheetrock and plaster ceiling estimated ( sq ft). With sheetr Date: March 21, 2012 Permit type: Gc | Permit id: Ec25119 | |||||
Basement. Restore gas water heater to pwo. Remove all work related debris. Contractor must sign and return bid. Note; contractor mu Date: February 28, 2012 Permit type: Heat | Permit id: Ec21730 | |||||
(apt#2b) @ es1 room aka living room: trace, locate and repair water leak from above. Demolish and repair ceiling ( sq ft) with sheetrock. Tape, c Date: March 21, 2012 Permit type: Gc | Permit id: Ec25115 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: June 8, 2012 Permit type: Delead | Permit id: Ec31207 | |||||
At apt 2b trace and repair water leak affecting the ceiling in the bathroom. Also, remove obstruction in the wash basin and replace drain line as Date: August 6, 2012 Permit type: Plumb | Permit id: Ed03607 |