Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Hvac change out - fau or wall heater - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: November 12, 2014 Contractor: A S I Hastings Inc Permit type: Mechanical - hvac change out | Permit status: Completed | Permit id: Pds2014-Resalt- | |||||
SCORE 86 Roof mount residential solar pv for existing sfd (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 12, 2017 Contractor: C W D Loma Inc Permit type: Online | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
SCORE 99 Install new ac w electrical Date: May 18, 2017 Contractor: Oak Island Heating And Air Conditioning Inc Permit type: Electrical & mechanical | Permit status: Issued | Permit id: Pds2017-Resalt- | Parcel: 2222800400 |