Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 80 Total tear-off & reroof of multifamily townhouse building with four attached units (units a, b, c, and d), 22 squares of asphalt shingles on a pitch represented as 4 12. All roof materials shall be installed per manufacturerfoots specs. Mid-roof inspection required if pitch is less than 4 12. Client: Kathleen Macdonald | Permit type: Roofing | Permit status: Cmp | Completion date: April 27, 2017 | Current use: Townhomes, existing | Permit id: Pmt2017-01553 |