Building Permits at 12046 Lakeside Ave Ne Seattle WA


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 12046 Lakeside Ave Ne Seattle WA over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
95
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installing one dedicated amp breaker in existing breaker panel for solar pv panels to be installed on the roof
Date:  July 20, 2015

Permit type: Electrical | Permit status: Permit closed | Completion date: July 24, 2015 | Expiration date: July 19, 2016 | Current use: Single family / duplex | Permit id: 6485214
2015/07/2009512046 Lakeside Ave Ne Seattle WaWest Seattle Natrl Energy Llc
SCORE
95
Replace gas furnace
Date:  January 11, 2008

Applicant: Genesee Fuel&htng Co Inc | Permit type: Mechanical | Permit status: Permit finaled | Completion date: January 18, 2008 | Expiration date: July 11, 2009 | Current use: Single family / duplex | Permit id: 6166665
2008/01/1109512046 Lakeside Ave Ne Seattle WaGenesee Fuel And Htng Co Inc
SCORE
95
[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installing one dedicated amp breaker in existing breaker panel for solar pv panels to be installed on the roof
Date:  July 20, 2015

Permit type: Electrical | Permit status: Permit closed | Completion date: July 24, 2015 | Expiration date: July 19, 2016 | Current use: Single family / duplex | Permit id: 6485214
2015/07/2009512046 Lakeside Ave Ne Seattle WaWest Seattle Electric And Solar
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.