Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Photovoltaic system. 2 23 11 added (1) branch circuit per gary noble. Bt. Date: December 22, 2010 Contractor: Solarcity Corporation Client: Davies | Permit type: Electrical | Permit status: Closed | Permit id: Elc2010-00705 | |||||
SCORE 95 Installation to photovoltaic system. Client: Davies | Permit type: Building | Permit status: Closed | Permit id: Bup2010-00275 | |||||
SCORE 95 Gas fireplace insert with flue and fuel piping. Date: December 31, 2013 Contractor: Owner Client: Davies | Permit type: Mechanical | Permit status: Closed | Permit id: Mec2013-00776 | |||||
SCORE 100 Panel change Date: November 21, 2013 Contractor: Bear Electric Client: Brian Davies | Permit type: Electrical | Permit status: Closed | Permit id: Elc2013-00694 |