Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
For the removal of all existing window signs and for the legalization of the erection of one (1) accessory free standing sign (size and location as shown in the application). Sign accessory to personal services on 1st floor with all other uses as previously approved. Client: Rutsky Boris | Permit type: Zoning/use permit | Permit status: Completed | Completion date: September 8, 2014 | Permit id: 436311 | |||||
SCORE 93 Home improvement management office with accessory storage not to exceed 25% of gross floor area on the second floor in the same building with a school for massage therapy & allied health (not providing massage to the general public existing on the first floor. Client: Rutsky Boris | Permit type: Use permit | Permit status: Completed | Completion date: September 8, 2014 | Permit id: 199072 | |||||
Certificate of occupancy not required for 1st floor allied health school. See ole for conr memo. Client: Rutsky Boris | Permit type: Administrative permit | Permit status: Completed | Completion date: November 11, 2008 | Permit id: 166039 | |||||
School for massage therapy and allied health (not providing massage to the public) on 1st floor in an existing structure with all other uses previously approved. No sign on this permit. Client: Rutsky Boris | Permit type: Use permit | Permit status: Completed | Completion date: September 8, 2014 | Permit id: 139787 |