Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 Roof mount residential solar pv for existing sfd (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 11, 2017 Contractor: M N Mauzy Mechanical Inc Permit type: Addn | Permit status: Completed | Completion date: October 2, 2017 | Permit id: Pds2017-Resalt- | |||||
SCORE 100 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: July 6, 2017 Contractor: Gabriel Carini Heating And Air Conditioning Inc Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
SCORE 82 Major remodel to (e) sfd to include remodel (e) bathrooms, replace plumbing fixtures, bedrooms expansion, add new powered room, add new pantry, w 54lf interior partitions, 6lf exterior infill walls, install 24 sqft windows, install 1 sqft doors, new risers @ living room area, install top arch, new ceiling at family room area, new deck w stairs, 627sqft conversion of enclosed patio to hab. Space (hallway, closets, laundry room, storage, and valet). New hvac. Misc. Epm. 6 22 17 plan change see c of a for details.... Ly Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
Foundation/steel/holdowns/abs/1st Date: March 14, 2017 Permit status: Fail | Permit id: Pds2016-Resalt- | |||||
Final Date: December 14, 2007 Permit status: Pass | Permit id: Pds2007-1023-20 |