Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Roof mount residential solar pv for existing sfd no. Of modules: 20 no. Of inverters: 4 total system size in kilowatts: 4. 6 svc upgrade to 125amp per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 6, 2011 Permit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: January 30, 2012 | Permit id: Pds2011-1031-20 | |||||
Roof mount residential solar pv for existing sfd no. Of modules no. Of inverters 4 total system size in kilowatts 4. 6 svc upgrade to 125amp per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 6, 2011 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 30, 2012 | Permit id: Pds2011-1031-20 | |||||
SCORE 100 Roof mount residential solar pv for existing sfd no. Of modules no. Of inverters 4 total system size in kilowatts 4. 6 svc upgrade to 125amp per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: December 6, 2011 Contractor: Solar West Electric Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 30, 2012 | Permit id: Pds2011-1031-20 | |||||
Fico demolition permit --for unpermitted adu note _ it may not be possible to rebuild. _ the fact that there was an existing structure on your lot does not guarantee that you will be able to replace it if it is demolished. Existence of a structure does not "grandfather" its use if it is removed. Please see the zoning counter at the kearny mesa pds offices (55 overland ave., suite 110) for more information. Date: June 16, 2017 Permit type: Addn | Permit status: Completed | Completion date: June 27, 2017 | Permit id: Pds2017-Resalt- | |||||
Final Date: January 26, 2012 Permit status: Pass | Permit id: Pds2011-1031-20 | |||||
Rough electric Date: December 29, 2011 Permit status: Pass | Permit id: Pds2011-1031-20 |