Building Permits at 11818 Redwood Rd Ne Redmond, WA 98052


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 11818 Redwood Rd Ne Redmond, WA 98052 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Enter existing underground system for copper splice rearrangement
Date:  December 4, 2014

Applicant: Mike Hakahan | Permit type: Right of way | Permit id: Row-2014-09522 | Parcel: 1115800110
2014/12/04095East Ne Lake Sammamish Parkway Redmond, Wa 98052
SCORE
65
Replace manhole frame and lid (that is beyond repair) in right-of-way - west side of west lake sammamish parkway ne - lid marked with x work needs to be expedited due to risk of manhole lid being knocked out of place as vehicles cross it.
Date:  January 9, 2015
Contractor: Pete Kenney

Applicant: Chris Dew | Permit type: Right of way | Permit id: Row-2015-00088 | Parcel: 1425059049
2015/01/0906548 Block Of West Lake Sammamish Parkway Ne West Side) Redmond, BlockPete Kenney
Occupying southbound lane of 152nd to relocate 4-inch pe gas main approximately 18 feet north of ne 24th street where 152nd heads ne at sr520. Relocate main from existing line at 31 feet west to 24 feet west/ between 1896 feet and 1968 feet north of ne 124th. 5x7 asphalt cuts and
Date:  March 2, 2015

Applicant: Julie Simmons | Permit type: Right of way | Permit id: Row-2015-01131 | Parcel: 2063500060
2015/03/02095Sr5 Ne Redmond, Wa 98052
Occupying southbound lane of 152nd to relocate 4-inch pe gas main approximately 18 feet north of ne 24th street where 152nd heads ne at sr520. Relocate main from existing line at 31 feet west to 24 feet west between 1896 feet and 1968 feet north of ne 124th. 5x7 asphalt cuts and
Date:  March 2, 2015

Applicant: Julie Simmons | Permit type: Right of way | Permit id: Row-2015-01131 | Parcel: 2063500060
2015/03/02095Sr5 Ne Redmond, Wa 98052
SCORE
62
Install new concrete pole with new street light. Pull new #6 underground triplex in existing pre-installed conduit. Remove existing sidewalk seam to seam to remove existing pse wood pole. After installing new street light pole pour new sidewalk with 2x2 block out for new grouting around street light pole.
Date:  March 4, 2015
Contractor: Bryan Waters

Applicant: Joe Belcher | Permit type: Right of way | Permit id: Row-2015-01253 | Parcel: 3927200230
2015/03/04062150 Block Of Ne 24th St Redmond, Wa 98052Bryan Waters
SCORE
100
Install new concrete pole with new street light. Pull new #6 underground triplex in existing pre-installed conduit. Remove existing sidewalk seam to seam to remove existing pse wood pole. After installing new street light pole pour new sidewalk with 2x2 block out for new grouting around street light pole.
Date:  March 4, 2015
Contractor: Potelco

Applicant: Joe Belcher | Permit type: Right of way | Permit id: Row-2015-01253 | Parcel: 3927200230
2015/03/040100150 Block Of Ne 24th St Redmond, Wa 98052Potelco
SCORE
100
Install new concrete pole with new street light. Pull new #6 underground triplex in existing pre-installed conduit. Remove existing sidewalk seam to seam to remove existing pse wood pole. After installing new street light pole pour new sidewalk with 2x2 block out for new grouting around street light pole.
Date:  March 4, 2015
Contractor: Potelco

Applicant: Joe Belcher | Permit type: Right of way | Permit id: Row-2015-01253
2015/03/040100150 Block Of Ne 24th St Redmond, Wa 98052Potelco
Construction of a stormwater detention vault for the betrozoff-jones subdivision.
Date:  March 30, 2015
Value:   $250,000

Applicant: Hans Christiansen | Permit type: Stormwater vault | Permit id: Bldg-2014-04746 | Parcel: 9428500065
2015/03/302500009511845 Red Wood Rd Ne Redmond, Wa 98052
SCORE
86
Replace twisted line arms and pins on three poles
Date:  April 7, 2015
Contractor: Ernie Engen

Applicant: Michael Bosshardt | Permit type: Right of way | Permit id: Row-2014-09795 | Parcel: 7201700095
2015/04/0708687 Block Of Willows Rd Redmond, Wa 98052Ernie Engen
Occupying southbound lane of willows road to investigate and repair a gas leak on the main in southwest corner of intersection of willows road and ne 87th street. One 3x5 hard surface cut anticipated.
Date:  March 14, 2016

Applicant: Aurelie Johannson | Permit type: Right of way | Permit id: Row-2016-01624 | Parcel: 225059015
2016/03/1409587 Block Of Willows Rd Redmond, Wa 98052
SCORE
100
Replace twisted line arms and pins on three poles
Date:  April 7, 2015
Contractor: Potelco

Applicant: Michael Bosshardt | Permit type: Right of way | Permit id: Row-2014-09795 | Parcel: 7201700095
2015/04/07010087 Block Of Willows Rd Redmond, Wa 98052Potelco
SCORE
100
Replace twisted line arms and pins on three poles
Date:  April 7, 2015
Contractor: Potelco

Applicant: Michael Bosshardt | Permit type: Right of way | Permit id: Row-2014-09795
2015/04/07010087 Block Of Willows Rd Redmond, Wa 98052Potelco
Sopa/frontier/ education hill rsu/206-856-9529/tranmitter change out on the building fire alarm system. Reference case #fire-2014-03898
Date:  April 10, 2015

Applicant: Janet Stebbins | Permit type: Fire alarm | Permit id: Fire-2015-02635 | Parcel: 3526059118
2015/04/1009511529 Red Wood Rd Ne Redmond, Wa 98052
Wsdot to close sr5 westbound off-ramp to ne 51st/ne 40th street. Detour route provided. Temporary traffic control devices place on city row to convey ramp closure restrictions and provide guidance along detour routes. Ramp closures will occur during non-peak traffic periods. No permanent work is proposed outside of wsdot row.
Date:  April 29, 2015

Applicant: Zung Rock | Permit type: Right of way | Permit id: Row-2015-02851 | Parcel: 5503500030
2015/04/29095Ne Sr5 Westbound Off Ramp Redmond, Wa 98052
Wsdot to close sr5 westbound off-ramp to ne 51st ne 40th street. Detour route provided. Temporary traffic control devices place on city row to convey ramp closure restrictions and provide guidance along detour routes. Ramp closures will occur during non-peak traffic periods. No permanent work is proposed outside of wsdot row.
Date:  April 29, 2015

Applicant: Zung Rock | Permit type: Right of way | Permit id: Row-2015-02851 | Parcel: 5503500030
2015/04/29095Ne Sr5 Westbound Off Ramp Redmond, Wa 98052
SCORE
77
Move existing utility riser at three locations to new poles placed. Location 1 - riser needs to be open/ trench 4 feet to new pole. Location 2 - existing riser needs to be open trenched 5 feet to new pole. Location 3 - existing utility riser needs to be open trench 5 feet to new pole.
Date:  May 6, 2015
Contractor: Cameron Christlieb

Applicant: Sunshine Crabbs | Permit type: Right of way | Permit id: Row-2015-03071 | Parcel: 5196420390
2015/05/0607716609 Ne 50th Way Working South On Wlsp) Redmond, Wa 98052Cameron Christlieb
SCORE
99
Move existing utility riser at three locations to new poles placed. Location 1 - riser needs to be open trench 4 feet to new pole. Location 2 - existing riser needs to be open trenched 5 feet to new pole. Location 3 - existing utility riser needs to be open trench 5 feet to new pole.
Date:  May 6, 2015
Contractor: Sefnco

Applicant: Sunshine Crabbs | Permit type: Right of way | Permit id: Row-2015-03071 | Parcel: 5196420390
2015/05/0609916609 Ne 50th Way Working South On Wlsp) Redmond, Wa 98052Sefnco
SCORE
99
Move existing utility riser at three locations to new poles placed. Location 1 - riser needs to be open trench 4 feet to new pole. Location 2 - existing riser needs to be open trenched 5 feet to new pole. Location 3 - existing utility riser needs to be open trench 5 feet to new pole.
Date:  May 6, 2015
Contractor: Sefnco

Applicant: Sunshine Crabbs | Permit type: Right of way | Permit id: Row-2015-03071
2015/05/0609916609 Ne 50th Way Working South On Wlsp) Redmond, Wa 98052Sefnco
Occupying southbound lane of 160th avenue ne to investigate and repair a gas leak at intersection of ne 51st and 160th avenue ne. One 3x5 black to cut anticipated.
Date:  May 7, 2015

Applicant: Emily Best | Permit type: Right of way | Permit id: Row-2015-02624 | Parcel: 2155000320
2015/05/0709551 Block Of 160th Ave Ne Redmond, Wa 98052
Occupying the southbound lane of willows road to investigate and repair a gas leak at 27 feet south of centerline of ne 87th street and feet west of centerline of willows road. One 3x5 blacktop cut anticipated.
Date:  May 7, 2015

Applicant: Emily Best | Permit type: Right of way | Permit id: Row-2015-02586 | Parcel: 125059150
2015/05/0709587 Red Wood Rd Ne Redmond, Wa 98052
SCORE
67
Access manholes to rod and verify existing duct path - portion is in bellevue. Mh 332/333/511/526/334/ab/415hh14320/14312/
Date:  May 22, 2015
Contractor: Stewart Lyon

Applicant: Dena Kludsikofsky | Permit type: Right of way | Permit id: Row-2015-03472 | Parcel: 2625059196
2015/05/22067Ne 20th Street Between 148th Ave Ne Ne Redmond, Wa 98052Stewart Lyon
SCORE
77
Access manholes to rod and verify existing duct path - portion is in bellevue. Mh 332 333 511 526 334 ab 415hh14320 14312
Date:  May 22, 2015

Applicant: Dena Kludsikofsky | Permit type: Right of way | Permit id: Row-2015-03472 | Parcel: 2625059196
2015/05/22077Ne 20th Street Between 148th Ave Ne Ne Redmond, Wa 98052Pacific Utilitycontractors
SCORE
77
Access manholes to rod and verify existing duct path - portion is in bellevue. Mh 332 333 511 526 334 ab 415hh14320 14312
Date:  May 22, 2015

Applicant: Dena Kludsikofsky | Permit type: Right of way | Permit id: Row-2015-03472
2015/05/22077Ne 20th Street Between 148th Ave Ne Ne Redmond, Wa 98052Pacific Utilitycontractors
Res alt emergency repair country place existing duplex destroyed by fire on 6/1/2015. All framing material and interior finish materials shall be removed except the concrete foundation. 19 sq ft.
Date:  July 24, 2015
Value:   $6,000

Applicant: Michael Schuerlein | Permit type: Residential | Permit id: Bldg-2015-05565 | Parcel: 225059201
2015/07/246000959002 Red Wood Rd Ne Redmond, Wa 98052
SCORE
65
Replace manhole frame and lid (that is beyond repair) in right-of-way - west side of west lake sammamish parkway ne - lid marked with x work needs to be expedited due to risk of manhole lid being knocked out of place as vehicles cross it.
Date:  January 9, 2015
Contractor: Pete Kenney

Applicant: Chris Dew | Permit type: Right of way | Permit id: Row-2015-00088 | Parcel: 1425059049
2015/01/0906548 Block Of West Lake Sammamish Parkway Ne West Side) Redmond, Wa 98052Pete Kenney
SCORE
67
Replace manhole frame and lid (that is beyond repair) in right-of-way - west side of west lake sammamish parkway ne - lid marked with x work needs to be expedited due to risk of manhole lid being knocked out of place as vehicles cross it.
Date:  January 9, 2015

Applicant: Chris Dew | Permit type: Right of way | Permit id: Row-2015-00088 | Parcel: 1425059049
2015/01/0906748 Block Of West Lake Sammamish Parkway Ne West Side) Redmond, Wa 98052Road Contruction Nw
SCORE
67
Replace manhole frame and lid (that is beyond repair) in right-of-way - west side of west lake sammamish parkway ne - lid marked with x work needs to be expedited due to risk of manhole lid being knocked out of place as vehicles cross it.
Date:  January 9, 2015

Applicant: Chris Dew | Permit type: Right of way | Permit id: Row-2015-00088
2015/01/0906748 Block Of West Lake Sammamish Parkway Ne West Side) Redmond, Wa 98052Road Contruction Nw
SCORE
99
Construction of a stormwater detention vault for the betrozoff-jones subdivision.
Date:  March 30, 2015
Value:   $250,000
Contractor: Toll Bros Inc

Applicant: Hans Christiansen | Permit type: Stormwater vault | Permit id: Bldg-2014-04746 | Parcel: 9428500065
2015/03/302500009911845 Redwood Rd Ne Redmond, Wa 98052Toll Bros Inc
SCORE
99
Construction of a stormwater detention vault for the betrozoff-jones subdivision.
Date:  March 30, 2015
Value:   $250,000
Contractor: Toll Bros Inc

Applicant: Hans Christiansen | Permit type: Stormwater vault | Permit id: Bldg-2014-04746
2015/03/302500009911845 Redwood Rd Ne Redmond, Wa 98052Toll Bros Inc
SCORE
87
Res alt emergency repair country place existing duplex destroyed by fire on 6 1 2015. All framing material and interior finish materials shall be removed except the concrete foundation. 19 sq ft.
Date:  July 24, 2015
Value:   $6,000

Applicant: Michael Schuerlein | Permit type: Residential | Permit id: Bldg-2015-05565 | Parcel: 225059201
2015/07/246000879002 Redwood Rd Ne Redmond, Wa 98052Perkins Excavating Inc
SCORE
87
Res alt emergency repair country place existing duplex destroyed by fire on 6 1 2015. All framing material and interior finish materials shall be removed except the concrete foundation. 19 sq ft.
Date:  July 24, 2015
Value:   $6,000

Applicant: Michael Schuerlein | Permit type: Residential | Permit id: Bldg-2015-05565
2015/07/246000879002 Redwood Rd Ne Redmond, Wa 98052Perkins Excavating Inc
SCORE
95
Sopa frontier education hill rsu 206-856-9529 tranmitter change out on the building fire alarm system. Reference case #fire-2014-03898
Date:  April 10, 2015

Applicant: Janet Stebbins | Permit type: Fire alarm | Permit id: Fire-2015-02635 | Parcel: 3526059118
2015/04/1009511529 Redwood Rd Ne Redmond, Wa 98052Simplex Grinnell Lp
SCORE
95
Sopa frontier education hill rsu 206-856-9529 tranmitter change out on the building fire alarm system. Reference case #fire-2014-03898
Date:  April 10, 2015

Applicant: Janet Stebbins | Permit type: Fire alarm | Permit id: Fire-2015-02635
2015/04/1009511529 Redwood Rd Ne Redmond, Wa 98052Simplex Grinnell Lp
Occupying the southbound lane of willows road to investigate and repair a gas leak at 27 feet south of centerline of ne 87th street and feet west of centerline of willows road. One 3x5 blacktop cut anticipated.
Date:  May 7, 2015

Applicant: Emily Best | Permit type: Right of way | Permit id: Row-2015-02586 | Parcel: 125059150
2015/05/0709587 Redwood Rd Ne Redmond, Wa 98052
SCORE
99
Wall- betrozoff-jones subdivision- construct geogrid reinforced segmental block retaining walls geogrid reinforced rockeries (fill areas) conventional unreinforced rockeries (face cuts) associated with grading shown on approved civil plans.
Date:  May 5, 2015
Value:   $30,000
Contractor: Toll Bros Inc

Applicant: Hans Christiansen | Permit type: Retaining wall | Permit id: Bldg-2015-02298 | Parcel: 9428500071
2015/05/05300009911818 Redwood Rd Ne Redmond, Wa 98052Toll Bros Inc
SCORE
99
Wall- betrozoff-jones subdivision- construct geogrid reinforced segmental block retaining walls geogrid reinforced rockeries (fill areas) conventional unreinforced rockeries (face cuts) associated with grading shown on approved civil plans. - actual address 11845 red-wood rd.
Date:  May 5, 2015
Value:   $15,000
Contractor: Toll Bros Inc

Applicant: Hans Christiansen | Permit type: Retaining wall | Permit id: Bldg-2015-02295 | Parcel: 9428500065
2015/05/05150009911818 Redwood Rd Ne Redmond, Wa 98052Toll Bros Inc
SCORE
99
Betrozoff-jones plat - complete frontage street lighting alterations to include the relocation of two light standards and associated conduit and wire.
Date:  September 10, 2015
Value:   $44,887

Applicant: Roger Palfenier | Permit type: Electrical - otc | Permit id: Elec-2015-06890 | Parcel: 9428500070
2015/09/10448879911818 Redwood Rd Ne Redmond, Wa 98052Totem Electric Of Tacoma Inc
SCORE
99
Betrozoff-jones plat demolition of 4 2 sfr 35sf well house 800sf garage and 600sf barn. Abandon gas & electrical (by pse) and phone & cable (by provider) and abandon any spectic tank drainfield areas found per kc health reg. Abandon well.
Date:  May 27, 2014
Value:   $20,000
Contractor: Toll Bros Inc

Applicant: Hans Christiansen | Permit type: Demolition | Permit id: Demo-2014-03536 | Parcel: 9428500070
2014/05/27200009911818 Redwood Rd Ne Redmond, Wa 98052Toll Bros Inc
Occupying southbound lane of woodinville-redmond road to tie into existing 6-inch steel gas main 14 feet west of centerline. Extend 2-inch pe main into developer plat for 31 homes. Trenching will be required: 25 feet x 4 feet x 48 inch trench.
Date:  November 20, 2014

Applicant: Julie Simmons | Permit type: Right of way | Permit id: Row-2014-08713 | Parcel: 9428500070
2014/11/2009511818 Redwood Rd Ne Redmond, Wa 98052
SCORE
86
31-lot single phase line extension - feeding plat from existing j-box (226017-168062) across street from plat entrance. Existing empty conduit going across woodinville-redmond road ne will be used for new primary cable.
Date:  January 5, 2015
Contractor: Pse Potelco

Permit type: Right of way | Permit id: Row-2014-08733 | Parcel: 9428500070
2015/01/0508611818 Redwood Rd Ne Redmond, Wa 98052Pse Potelco
SCORE
92
Sign crestview- build monument entrance feature at nw corner of intersection of redwood rd. N. E. And n. E. 118th way for the crestview subdivision. Monument rough dimensions 6 6in tall by 14 long. Sign lettering area total is 12 s. F. (6 s. F. Each side). Letters mounted individually.
Date:  October 1, 2015
Value:   $12,000
Contractor: Toll Wa Lp

Applicant: Hans Christiansen | Permit type: Sign | Permit id: Sign-2015-07375 | Parcel: 9428500070
2015/10/01120009211818 Redwood Rd Ne Redmond, Wa 98052Toll Wa Lp
SCORE
99
Reinstatement of demo-2014-03536 - betrozoff-jones plat demolition of 4 2 sfr 35sf well house 800sf garage and 600sf barn. Abandon gas & electrical (by pse) and phone & cable (by provider) and abandon any spectic tank drainfield areas found per kc health reg. Abandon well.
Date:  September 2, 2015
Value:   $20,000
Contractor: Toll Bros Inc

Applicant: Hans Christiansen | Permit type: Demolition | Permit id: Demo-2015-06719 | Parcel: 9428500070
2015/09/02200009911818 Redwood Rd Ne Redmond, Wa 98052Toll Bros Inc
Remove and replace two underground vault lids due to to new sidewalk and elevation changes.
Date:  July 1, 2016

Applicant: Trina Gallaher | Permit type: Right of way | Permit id: Row-2016-05353 | Parcel: 3526059118
2016/07/0109511818 Redwood Rd Ne Redmond, Wa 98052
Dig and expose one 4-inch conduit that comcast is giving to frontier and tie it into frontiers existing duct bank on the shoulder of woodinville-redmond road. Work is required to brig frontier service to betrozoff plat and due to road going to be repaved.
Date:  September 7, 2016

Applicant: Thomas Dacey | Permit type: Right of way | Permit id: Row-2016-07304 | Parcel: 3526059052
2016/09/0709511818 Redwood Rd Ne Redmond, Wa 98052
SCORE
99
Betrozoff-jones plat demolition of 4 2 sfr 35sf well house 800sf garage and 600sf barn. Abandon gas & electrical (by pse) and phone & cable (by provider) and abandon any spectic tank drainfield areas found per kc health reg. Abandon well.
Date:  May 27, 2014
Value:   $20,000
Contractor: Toll Bros Inc

Applicant: Hans Christiansen | Permit type: Demolition | Permit id: Demo-2014-03536
2014/05/27200009911818 Redwood Rd Ne Redmond, Wa 98052Toll Bros Inc
SCORE
86
31-lot single phase line extension - feeding plat from existing j-box (226017-168062) across street from plat entrance. Existing empty conduit going across woodinville-redmond road ne will be used for new primary cable.
Date:  January 5, 2015
Contractor: Pse Potelco

Permit type: Right of way | Permit id: Row-2014-08733
2015/01/0508611818 Redwood Rd Ne Redmond, Wa 98052Pse Potelco
SCORE
99
Wall- betrozoff-jones subdivision- construct geogrid reinforced segmental block retaining walls geogrid reinforced rockeries (fill areas) conventional unreinforced rockeries (face cuts) associated with grading shown on approved civil plans.
Date:  May 5, 2015
Value:   $30,000
Contractor: Toll Bros Inc

Applicant: Hans Christiansen | Permit type: Retaining wall | Permit id: Bldg-2015-02298
2015/05/05300009911818 Redwood Rd Ne Redmond, Wa 98052Toll Bros Inc
SCORE
99
Wall- betrozoff-jones subdivision- construct geogrid reinforced segmental block retaining walls geogrid reinforced rockeries (fill areas) conventional unreinforced rockeries (face cuts) associated with grading shown on approved civil plans. - actual address 11845 red-wood rd.
Date:  May 5, 2015
Value:   $15,000
Contractor: Toll Bros Inc

Applicant: Hans Christiansen | Permit type: Retaining wall | Permit id: Bldg-2015-02295
2015/05/05150009911818 Redwood Rd Ne Redmond, Wa 98052Toll Bros Inc
SCORE
92
Sign crestview- build monument entrance feature at nw corner of intersection of redwood rd. N. E. And n. E. 118th way for the crestview subdivision. Monument rough dimensions 6 6in tall by 14 long. Sign lettering area total is 12 s. F. (6 s. F. Each side). Letters mounted individually.
Date:  October 1, 2015
Value:   $12,000
Contractor: Toll Wa Lp

Applicant: Hans Christiansen | Permit type: Sign | Permit id: Sign-2015-07375
2015/10/01120009211818 Redwood Rd Ne Redmond, Wa 98052Toll Wa Lp
SCORE
99
Reinstatement of demo-2014-03536 - betrozoff-jones plat demolition of 4 2 sfr 35sf well house 800sf garage and 600sf barn. Abandon gas & electrical (by pse) and phone & cable (by provider) and abandon any spectic tank drainfield areas found per kc health reg. Abandon well.
Date:  September 2, 2015
Value:   $20,000
Contractor: Toll Bros Inc

Applicant: Hans Christiansen | Permit type: Demolition | Permit id: Demo-2015-06719
2015/09/02200009911818 Redwood Rd Ne Redmond, Wa 98052Toll Bros Inc
SCORE
99
Betrozoff-jones plat - complete frontage street lighting alterations to include the relocation of two light standards and associated conduit and wire.
Date:  September 10, 2015
Value:   $44,887

Applicant: Roger Palfenier | Permit type: Electrical - otc | Permit id: Elec-2015-06890
2015/09/10448879911818 Redwood Rd Ne Redmond, Wa 98052Totem Electric Of Tacoma Inc
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.