Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 No change to current layout, design, or materials allowed. All work must be performed and all material must be stored within fenced area adjacent to house. Date: November 3, 2005 Contractor: Mi Casa Permit status: Permit expired | Expiration date: December 18, 2005 | Permit id: Pa15964 | |||||
Repair 4 clean out sewer /work from meter into house 1 copper install. Date: November 7, 2005 Permit status: Permit expired | Expiration date: December 7, 2005 | Permit id: Pa16033 | |||||
SCORE 99 In conjunction with ribbon cutting for the opening of house to be attended by mayor. Date: February 13, 2006 Contractor: Dc Government Permit status: Permit expired | Expiration date: February 14, 2006 | Permit id: Pa17782 | |||||
Repair 4 clean out sewer work from meter into house 1 copper install. Date: November 7, 2005 Permit status: Permit expired | Expiration date: December 7, 2005 | Permit id: Pa16033 | |||||
SCORE 99 Date: February 13, 2006 Contractor: Dc Government Permit status: 8 | Expiration date: February 14, 2006 | Permit id: Pa17782 | |||||
SCORE 59 Date: November 3, 2005 Contractor: Mi Casa Permit status: 8 | Expiration date: December 18, 2005 | Permit id: Pa15964 | |||||
Date: November 7, 2005 Permit status: 8 | Expiration date: December 7, 2005 | Permit id: Pa16033 |