Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Zoning permit ![]() Permit status: Completed | Permit id: 712386 | |||||
Use permit ![]() Permit status: Completed | Permit id: 657211 | |||||
Plumbing permit ![]() Permit status: Completed | Permit id: 609350 | |||||
Zoning/use permit ![]() Permit status: Completed | Permit id: 607533 | |||||
Demolition permit ![]() Permit status: Completed | Permit id: 607534 | |||||
For the lot adjustment to create one(1) lot "parcel a" from three(3) opa accounts ( 1 south 19th street, 19 r chestnut street and 112 south 19th street). ( see app# 708917 for plans) ![]() Client Company: Reed J Slogoff | Permit type: Zoning permit | Permit status: Completed | Completion date: September 15, 2016 | Permit id: 712386 | |||||
SCORE 100 Pump out clean and remove 1,0 gallon #2 fuel oil underground storage tank ust in excavation. Petroleum products will be removed and ust cleaned prior to removal. Conformity soil sample will be performed below ust. Ust closure report will be issued post closure. Contingency plan in place in case contaminated soils discovered during ust closure. All work completed in accordance with padep ust removal guidelines ust is unregulated fuel oil tank all fuel oil disposed of at eldredge inc pa residual waste processing facility permit ![]() ![]() Client Company: Reed J Slogoff | Permit type: Demolition permit | Permit status: Active | Completion date: November 2, 2017 | Permit id: 828484 | |||||
SCORE 100 For the complete demolition of an existing attached structure. Size and location as shown in application. For use to vacant lot. See a p 607532 for plans ![]() ![]() Client Company: Reed J Slogoff | Permit type: Zoning/use permit | Permit status: Completed | Completion date: May 26, 2015 | Permit id: 607533 | |||||
Use permit ![]() Permit status: Completed | Permit id: 657211 | |||||
Zoning use permit ![]() Permit status: Completed | Permit id: 607533 | |||||
Demolition permit ![]() Permit status: Completed | Permit id: 607534 | |||||
Zoning permit ![]() Permit status: Completed | Permit id: 712386 | |||||
Plumbing permit ![]() Permit status: Completed | Permit id: 609350 | |||||
SCORE 100 Remove trap and seal lateral part of demo (commercial)pa 1 call 2015-12028 self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection" ![]() ![]() Client Company: Reed J Slogoff | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 5, 2017 | Permit id: 609350 | |||||
SCORE 82 Amend permit #788751 to include assembly and disassembly of a tower crane as part of construction of high-rise building as per approved plans and documentation. ![]() ![]() Client Company: Reed J Slogoff | Permit type: Administrative permit | Permit status: Active | Completion date: November 21, 2017 | Permit id: 827761 | |||||
SCORE 100 For the complete demolition of an existing attached one (1) story, masonry and concrete commercial building [112 s 19th st] and the adjacent semi-detached [alley on one side] three (3) story, masonry and wood commercial building [1 s 19th st]. All permitted demolition activity to be in accordance with approved site safety demolition plan & such plan to be maintained on site at all times in accordance with code bulletin b-1302. Full sidewalk closure required as reflected on approved site plan and in accordance with section 3306 of the ibc. Separate street closure permit required prior to start of work. Any deviation will require an amended building permit. Asbestos removal required ![]() ![]() Client Company: Reed J Slogoff | Permit type: Demolition permit | Permit status: Completed | Completion date: October 26, 2015 | Permit id: 607534 |