Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Alteration permit Client: Alpha Pa 1 | Permit status: Completed | Permit id: 643126 | |||||
Demolition permit Client: Alpha Pa 1 | Permit status: Active | Permit id: 694196 | |||||
Demolition permit Client: Alpha Pa 1 | Permit status: Expired | Permit id: 694196 | |||||
Alteration permit Client: Alpha Pa 1 | Permit status: Completed | Permit id: 643126 | |||||
SCORE 82 Ez interior demolition - for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Client: Alpha Pa 1 | Permit type: Demolition permit | Permit status: Expired | Completion date: October 19, 2016 | Permit id: 694196 | |||||
For the erection of a three (3) story rear addition. For interior level 3 alteration as per plans. Separate permits required for all mechanical, electrical and plumbing work. Client: Alpha Pa 1 | Permit type: Addition permit | Permit status: Expired | Completion date: November 6, 2017 | Permit id: 726112 | |||||
SCORE 82 Make safe permit to comply case #503048; work to include: re-setting and repointing loose bricks and structurally stabilizing roof structure and make water tight. Client: Alpha Pa 1 | Permit type: Alteration permit | Permit status: Completed | Completion date: October 19, 2015 | Permit id: 643126 | |||||
SCORE 93 For the complete demolition of an existing building for use as a vacant lot Client: Alpha Pa 1 | Permit type: Zoning/use permit | Permit status: Completed | Completion date: August 17, 2017 | Permit id: 805261 | |||||
SCORE 93 For the complete demolition of a three (3) story existing structure. Structure to be demolished by hand and with hand held tools only. Pedestrian protection to be in place prior to start of work and to be maintained during all demolition activities. A covered walkway or sidewalk closure shall be required within 8. 75 feet of building facade in accordance with section 3306 of the ibc. Separate building and or streets department permits are required. 21 day posting and notice required per a-303. 2 permit received from downstairs Client: Alpha Pa 1 | Permit type: Demolition permit | Permit status: Completed | Completion date: November 3, 2017 | Permit id: 805266 | |||||
Interior remidel existing multi story single family rear addition. Re work mechanicals. Client: Alpha Pa 1 | Permit type: Zoning permit | Permit status: Completed | Completion date: March 22, 2017 | Permit id: 765249 | |||||
SCORE 96 Seal 5" lateral & fai -pa1#2017-1630726 remove house trap and hermetically sealing the lateral by a cap or plug per section p-606. 1 of the philadelphia plumbing code 2004 - "self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Client: Alpha Pa 1 | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 6, 2017 | Permit id: 791596 |