Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
2007 fire rebuild rebuilding six cabins for camp stevens (cabins #10-14, 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. Cabin # -- 432 sqft 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058 Permit type: Building : 21 - com | Permit status: Permit finaled | Completion date: June 6, 2013 | Permit id: Pds2012-1019-20 | |||||
2007 fire rebuild rebuilding six cabins for camp stevens (cabins #10-14, 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. Cabin #11 - 432 sqft 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058 Permit type: Building : 21 - com | Permit status: Permit finaled | Completion date: June 6, 2013 | Permit id: Pds2012-1019-20 | |||||
2007 fire rebuild rebuilding six cabins for camp stevens (cabins #10-14, 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. Cabin #12 - 432 sqft 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058 Permit type: Building : 21 - com | Permit status: Permit finaled | Completion date: June 6, 2013 | Permit id: Pds2012-1019-20 | |||||
2007 fire rebuild rebuilding six cabins for camp stevens (cabins #10-14, 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. Cabin #13 -- 432 sqft 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058 Permit type: Building : 21 - com | Permit status: Permit finaled | Completion date: June 6, 2013 | Permit id: Pds2012-1019-20 | |||||
2007 fire rebuild rebuilding six cabins for camp stevens (cabins #10-14, 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. Cabin #14 - 432 sqft 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058 Permit type: Building : 21 - com | Permit status: Permit finaled | Completion date: June 6, 2013 | Permit id: Pds2012-1019-20 | |||||
2007 fire rebuild rebuilding six cabins for camp stevens (cabins #10-14, 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. Cabin #16 -- 432 sqft 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058 Permit type: Building : 21 - com | Permit status: Permit finaled | Completion date: June 6, 2013 | Permit id: Pds2012-1019-20 | |||||
2007 fire rebuild rebuilding six cabins for camp stevens (cabins #10-14, 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058 Permit type: Building : 21 - com | Permit status: Permit finaled | Completion date: February 17, 2012 | Permit id: Pds2011-1017-20 | |||||
SCORE 98 (2) roof mount commercial solar pvs no. Of modules: 24 16 = no. Of inverters: 1 1 = 2 total system size in kilowatts: 5. 5 3. 6 = 9. 1 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Permit type: Electrical : 8004 - | Permit status: Permit finaled | Completion date: October 28, 2010 | Permit id: Pds2010-1031-20 | |||||
SCORE 100 (2) roof mount commercial solar pvs no. Of modules 24 + 16 = no. Of inverters 1 + 1 = 2 total system size in kilowatts 5. 5 + 3. 6 = 9. 1 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Permit type: Commercial alteration-addn | Permit status: Completed | Completion date: October 28, 2010 | Permit id: Pds2010-1031-20 | |||||
Angel fire 2007 - rebuilding two buildings as follows for camp stevens original buildings were 18 sq ft.(for this area in campground) building 1 - 2305 sq ft 2 story building 1165 1st floor meeting and conference rooms with 2 restrooms and laundry room storage and 2 drinking fountains and an attached 2 story 11 sq ft 4 unit cabin with bathroom ac/heat exterior stairs and balcony building 2 - 2 story 11 sf 4 unit cabins each with a full bathroom/heat and ac exterior stairs and balconies Permit type: Commercial multi-bldg parent | Permit status: Open | Permit id: Pds2016-Cmaspc- | |||||
2007 fire rebuild rebuilding six cabins for camp stevens (cabins #10-14, 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058 Permit type: New primary comm structure | Permit status: Completed | Completion date: February 17, 2012 | Permit id: Pds2011-1017-20 | |||||
Angel fire 2007 - rebuilding two buildings as follows for camp stevens original buildings were 18 sq ft.(for this area in campground) building 1 - 2305 sq ft 2 story building 1165 1st floor meeting and conference rooms with 2 restrooms and laundry room storage and 2 drinking fountains and an attached 2 story 11 sq ft 4 unit cabin with bathroom ac heat exterior stairs and balcony building 2 - 2 story 11 sf 4 unit cabins each with a full bathroom heat and ac exterior stairs and balconies Permit type: Commercial multi-bldg parent | Permit status: Open | Permit id: Pds2016-Cmaspc- | |||||
SCORE 96 Roof mount residential solar pv for existing sfd (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
SCORE 93 Angel fire 2007 - rebuilding two buildings as follows for camp stevens original buildings were 18 sq ft.(for this area in campground) building 1 - 2305 sq ft 2 story building 1165 1st floor meeting and conference rooms with 2 restrooms and laundry room storage and 2 drinking fountains and an attached 2 story 11 sq ft 4 unit cabin with bathroom ac heat exterior stairs and balcony building 2 - 2 story 11 sf 4 unit cabins each with a full bathroom heat and ac exterior stairs and balconies Permit type: Bldg parent | Permit status: Completed | Completion date: April 26, 2017 | Permit id: Pds2016-Cmaspc- | |||||
SCORE 93 Angel fire 2007 - rebuilding two buildings as follows for camp stevens original buildings were 18 sq ft.(for this area in campground) building 1 - 2305 sq ft 2 story building 1165 1st floor meeting and conference rooms with 2 restrooms and laundry room storage and 2 drinking fountains and an attached 2 story 11 sq ft 4 unit cabin with bathroom ac heat exterior stairs and balcony Permit type: New commercial acc structure | Permit status: Issued | Permit id: Pds2017-Comacc- | |||||
Building site inspection Permit status: Done | Permit id: Pds2016-Cmaspc- | |||||
Building site inspection Permit status: Done | Permit id: Pds2005-1016-20 | |||||
Stormwater insp Permit status: Monitor | Permit id: Pds2012-1014-20 | |||||
Stormwater insp Permit status: Cancel | Permit id: Pds2012-1014-20 | |||||
Final Permit status: Pass | Permit id: Pds2009-1019-20 | |||||
Final Permit status: Fail | Permit id: Pds2009-1019-20 | |||||
Stormwater insp Permit status: Monitor | Permit id: Pds2009-1019-20 | |||||
Lath/drywall - interior Permit status: Pass | Permit id: Pds2008-1019-20 | |||||
Final Permit status: Pass | Permit id: Pds2007-1007-20 | |||||
Foundation/steel/holdowns/abs/2nd Permit status: Pass | Permit id: Pds2006-1019-20 |