Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Asbestos remediation required prior to start of work alterations to existing building envelope. Work to include: replacement of existing windows, removal of existing roof and replacement with new roof insulation and modified bituminous membrane roofing, repointing of all brick work, repairs to brick masonry and construction of a new accessible entrance. ![]() Client: School District Of Phila | Client Company: William Fox, Jr., Dir. | Permit type: Alteration permit | Permit status: Active | Completion date: November 24, 2017 | Permit id: 802620 | |||||
SCORE 100 Conduit & wiring to 23 existing exterior lights, power and control wiring for window motors, door release and intercom system as per 2008 nec (east district) ![]() ![]() Client: School District Of Phila | Client Company: William Fox, Jr., Dir. | Permit type: Electrical permit | Permit status: Active | Completion date: November 28, 2017 | Permit id: 824923 | |||||
SCORE 59 Alterations: exterior plumbing; schoolyard site;pwd stormwater managment project; 12x12 yard drain 6" cast iron storm drain, 6" hdpe storm drain, 8" perferated hdpe, 15 hdpe pipe, 12" hdpe pipe. "self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection"the installation will comply with the philadephia plubming code 2004 ![]() ![]() Client: School District Of Phila | Client Company: William Fox, Jr., Dir. | Permit type: Plumbing permit | Permit status: Active | Completion date: December 1, 2017 | Permit id: 828078 |