SCORE 96 Replace water heater in basement with gallon, 40,0 btu unit. Date: January 5, 2005 Contractor: Deer Creek Plumbing Inc Client: Harry Ross,Lisa Ross | Applicant: Deer Creek Plumbing, Inc. | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 58 Retaining wall Date: May 2, 2000 Contractor: John Figoski Client: John Figoski,Mary Rose Figoski | Applicant: John Figoski | Permit type: Fence | Permit status: Cmp | Completion date: August 23, 2000 | Current use: Single family d | |||||
SCORE 95 Interior remodel for basement finish and first floor, including installation of new basement bedroom, office, full bath and family room, and kitchen reconfiguration, installation of spiral stair, misc. Wall and door work, and associated electrical, mechanical, and plumbing work. Client: Douglas Mckenna,Judith Houlding | Applicant: B W Construction | Permit type: Building, electrical | Permit status: Cmp | Completion date: October 29, 2004 | Current use: Single family d | |||||
SCORE 88 Installation of approximately 2 linear feet of 6 foot fencing. Fence to be installed according to submitted plans, w a removable section across an easement. Date: May 17, 2007 Contractor: Keep Out Fencing Client: James Bloomer | Applicant: Keep Out Fencing | Permit type: Fence | Permit status: N&v | Current use: Single family d | |||||
SCORE 100 Total tear-off & reroof of 37 squares on a sfd, compostion shingle on a pitch represented as 4 12. Date: July 20, 2007 Contractor: Boulder Roofing Inc Client: John Figoski,Mary Trust | Applicant: Boulder Roofing, Inc. | Permit type: Roofing | Permit status: Cmp | Completion date: August 16, 2007 | Current use: Single family d | |||||
SCORE 95 Replacement forced air furnace Date: November 9, 2007 Contractor: Precision Plumbing And Heating Client: Douglas Mckenna,Judith Houlding | Applicant: Precision Plumbing & Heating | Permit type: Mechanical | Permit status: Cmp | Completion date: February 4, 2008 | Current use: Single family d | |||||
SCORE 56 Add and replace decks in sfd. Client: James Bloomer | Applicant: James Bloomer | Permit type: Building | Permit status: Cmp | Completion date: March 20, 2012 | Current use: Single family d | |||||
SCORE 100 Remove existing shingles and re-roof single-family residence with dimensional shingles. 46 squares, 4:12 pitch. Date: May 8, 2008 Contractor: Viking Roofing Inc Client: Douglas Long | Applicant: Viking Roofing Inc | Permit type: Roofing | Permit status: Cmp | Completion date: June 2, 2008 | Current use: Single family d | |||||
SCORE 58 Remove 2 windows and door and install 1 10x6 8" french gliding door replace header. Sfd Client: John Figoski,Mary Trust | Applicant: John Figoski | Permit type: Building | Permit status: Cmp | Completion date: October 3, 2008 | Current use: Single family d | |||||
SCORE 56 Fence permit for stucco wall with stone cap along broadway. Fence is 7-ft max height and 120-ft long. Date: May 6, 2009 Contractor: Janna Mcdonald Client: Janna Mcdonald | Applicant: Janna Mcdonald | Permit type: Fence | Permit status: Cmp | Completion date: June 16, 2014 | Current use: Single family d | |||||
SCORE 95 Remove tree for forestry Date: October 9, 2009 Contractor: Swingle Tree Company Client: Douglas Mckenna,Judith Houlding | Applicant: Swingle Tree Company | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 Installation of new cedar privacy fence along northern property line. Fence is required to include a 12 foot opening for access to city of boulder sewer main. Date: January 15, 2010 Contractor: Boulder Fence Company Client: James Bloomer | Applicant: Boulder Fence Company | Permit type: Fence | Permit status: N&v | Current use: Single family d | |||||
SCORE 100 Total tear off and reroof of existing single family dwelling. Certainteed presidential tl, 49 squares, 7 12 pitch as indicated on permit application. Date: October 15, 2010 Contractor: Boulder Roofing Inc Client: Donald Bowman,Elizabeth Bowman | Applicant: Boulder Roofing, Inc. | Permit type: Roofing | Permit status: Cmp | Completion date: July 21, 2011 | Current use: Single family d | |||||
SCORE 70 Pv installation on sfd. Flush mounted, grid-tied, and 8. 5 kw. Date: November 8, 2010 Contractor: Donald Bowman Client: Donald Bowman,Elizabeth Bowman | Applicant: Donald Bowman | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 29, 2013 | Current use: Single family d | |||||
SCORE 95 Minor interior remodel of kitchen in single family residence including soffit removal, associated electrical wor, relocation of plumbing fixtures, installation of gas line for range, installation of new hood vent. Associated flooring, cabinetry and countertops that do not require a permit are associated with project. Client: John Figoski,Mary Trust | Applicant: Agr Building, Inc | Permit type: Building, electrical | Permit status: Iss | Current use: Single family d | |||||
SCORE 94 Installation of a 7. 68 kw solar array, flush mounted and grid tied Date: October 31, 2011 Contractor: Thames Electric Company Client: Tracy Tu | Applicant: Thames Electric Company | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 14, 2014 | Current use: Single family d | |||||
SCORE 98 Total tear off and reroof of existing single family dwelling: oc woodcrest asphalt shingles, 32 squares on an 8 12 pitch as indicated on permit application. Date: February 29, 2012 Contractor: Precision Roofing And Design Client: Tracy Tu | Applicant: Precision Roofing & Design | Permit type: Roofing | Permit status: Cmp | Completion date: March 8, 2012 | Current use: Single family d | |||||
SCORE 100 Remove existing shingles and roofing and re-roof residence with dimensional shingles and install epdm on garage. 24 squares, roof pitch represented by contractor to be 9:12 and 1 4:1 pitch on garage. Date: May 16, 2012 Contractor: Boulder Roofing Inc Client: James Bloomer | Applicant: Boulder Roofing, Inc | Permit type: Roofing | Permit status: Iss | Current use: Single family d | |||||
SCORE 100 Installation of a replacement gas fired water heater. Date: September 25, 2012 Contractor: Planet Plumbing Inc Client: Tracy Tu | Applicant: Planet Plumbing, Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: September 27, 2012 | Current use: Single family d | |||||
SCORE 100 Remodel of master bathroom on second floor of residence consisting of replacement of fixtures including twin sinks, tub, shower, and toilet, electrical work including lighting fixtures and in-floor heating. Scope of project requires electrical and plumbing permits only. Tile work on floor does not require a building permit. Date: October 8, 2012 Contractor: Rgm Construction Company Inc Client: Matthew Suchor,Christine Suchor | Applicant: Rgm Construction Company Inc | Permit type: Electrical, plumbing | Permit status: Cmp | Completion date: April 29, 2013 | Current use: Single family d | |||||
SCORE 56 Two forced air direct vent furnace replacements 80,0 and 60,0 btu location in basement Date: November 5, 2012 Contractor: Lisa Ross Client: Harry Ross,Lisa Ross | Applicant: Lisa Ross | Permit type: Mechanical | Permit status: Cmp | Completion date: November 8, 2012 | Current use: Single family d | |||||
SCORE 95 Installation of a flush mount 11. 18 kw photovoltaic system array to be parallel to roof plane, and remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and or drawing(s) for specific information. Date: March 25, 2013 Contractor: Namaste Solar Electric Inc Client: Matthew Suchor,Christine Suchor | Applicant: Namaste Solar Electric Inc | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 14, 2014 | Current use: Single family d | |||||
SCORE 93 Remove existing shingles and re-roof residence with dimensional shingles. 24 squares, roof pitch represented by contractor to be 5:12. Date: May 6, 2013 Contractor: Exceptional Exteriors Client: Douglas Long | Applicant: Exceptional Exteriors | Permit type: Roofing | Permit status: Cmp | Completion date: May 9, 2013 | Current use: Single family d | |||||
SCORE 93 Demolition of a deteriorated 7 sf deck off the rear of the house and construction of a replacement 7 sf deck -- a portion of which is to be cantilevered section as detailed on the enclosed engineerfoots drawings and specifications. Client: Matthew Suchor,Christine Suchor | Applicant: Polaris Contractors Llc | Permit type: Building | Permit status: Cmp | Completion date: February 25, 2014 | Current use: Single family d | |||||
SCORE 88 Remove existing shingles and re-roof residence with dimensional shingles. 52 squares, roof pitch represented by contractor to be 5:12. Date: August 21, 2013 Contractor: Rm Commercial Contractors Llc Client: Douglas Mckenna,Judith Houlding | Applicant: Rm Commercial Contractors, Llc | Permit type: Roofing | Permit status: Cmp | Completion date: January 10, 2014 | Current use: Single family d | |||||
SCORE 100 Interior remodel of sfdd to include relocation of stairway, relocation of one bath and laundry room, remodel of kitchen and mudroom, and addition of second furnace. Client: Christine Suchor,Matthew Suchor | Applicant: Melton Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 5, 2015 | Current use: Single family d | |||||
SCORE 95 Replacement forced air furnace, replacement comfort cooling Date: May 1, 2015 Contractor: Precision Plumbing And Heating Inc Client: D Rendlemman | Applicant: Precision Plumbing & Heating Inc | Permit type: Mechanical | Permit status: Iss | Current use: Single family d | |||||
Gas service renewal. Asphalt r&r. Job #12348400 Date: April 21, 2016 Client: Janna Mcdonald | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2016-01705 | |||||
Fence permit for stucco wall with stone cap along broadway. Fence is 7-ft max height and 120-ft long. Date: May 6, 2009 Value: $10,000 Client: Janna Mcdonald | Permit type: Fence | Permit status: Cmp | Completion date: June 16, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-01542 | |||||
SCORE 95 Installation of a flush mount 11. 18 kw photovoltaic system array to be parallel to roof plane, and remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and or drawing(s) for specific information. Client: Matthew Suchor | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 14, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-01227 | |||||
SCORE 93 Remove existing shingles and re-roof residence with dimensional shingles. 24 squares, roof pitch represented by contractor to be 5:12. Client: Douglas Long | Permit type: Roofing | Permit status: Cmp | Completion date: May 9, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-01928 | |||||
SCORE 95 Remove existing shingles and re-roof residence with dimensional shingles. 52 squares, roof pitch represented by contractor to be 5:12. Client: Douglas Mckenna | Permit type: Roofing | Permit status: Cmp | Completion date: January 10, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-04140 | |||||
Retaining wall Date: May 2, 2000 Value: $1 Client: John Figoski | Permit type: Fence | Permit status: Cmp | Completion date: August 23, 2000 | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-01793 | |||||
SCORE 95 Interior remodel of sfdd to include relocation of stairway, relocation of one bath and laundry room, remodel of kitchen and mudroom, and addition of second furnace. Client: Christine Suchor | Permit type: Building, electrical, mechanical, plumbing, water | Permit status: Cmp | Completion date: March 5, 2015 | Current use: Single family detached dwelling, remodel | Permit id: Pmt2014-03476 | |||||
SCORE 98 Total tear off and reroof of existing single family dwelling: oc woodcrest asphalt shingles, 32 squares on an 8 12 pitch as indicated on permit application. Client: Tracy Tu | Permit type: Roofing | Permit status: Cmp | Completion date: March 8, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-00833 | |||||
SCORE 95 Remove existing shingles and roofing and re-roof residence with dimensional shingles and install epdm on garage. 24 squares, roof pitch represented by contractor to be 9:12 and 1 4:1 pitch on garage. Client: James Bloomer | Permit type: Roofing | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-02371 | |||||
SCORE 95 Installation of a replacement gas fired water heater. Client: Tracy Tu | Permit type: Mechanical | Permit status: Cmp | Completion date: September 27, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-04663 | |||||
SCORE 100 Remodel of master bathroom on second floor of residence consisting of replacement of fixtures including twin sinks, tub, shower, and toilet, electrical work including lighting fixtures and in-floor heating. Scope of project requires electrical and plumbing permits only. Tile work on floor does not require a building permit. Client: Matthew Suchor | Permit type: Electrical, plumbing | Permit status: Cmp | Completion date: April 29, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-04888 | |||||
Two forced air direct vent furnace replacements 80,0 and 60,0 btu location in basement Date: November 5, 2012 Value: $7,200 Client: Harry Ross | Permit type: Mechanical | Permit status: Cmp | Completion date: November 8, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-05356 | |||||
SCORE 95 Replace water heater in basement with gallon, 40,0 btu unit. Client: Harry Ross | Permit type: Mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2005-00044 | |||||
SCORE 95 Total tear off and reroof of existing single family dwelling. Certainteed presidential tl, 49 squares, 7 12 pitch as indicated on permit application. Client: Donald Bowman | Permit type: Roofing | Permit status: Cmp | Completion date: July 21, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04521 | |||||
Pv installation on sfd. Flush mounted, grid-tied, and 8. 5 kw. Date: November 8, 2010 Value: $25,000 Client: Donald Bowman | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 29, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04937 | |||||
Add and replace decks in sfd. Date: April 9, 2008 Value: $5 Client: James Bloomer | Permit type: Building | Permit status: Cmp | Completion date: March 20, 2012 | Current use: Single family detached dwelling, deck, n | Permit id: Pmt2008-01127 | |||||
Remove 2 windows and door and install 1 10x6 8" french gliding door replace header. Sfd Date: September 11, 2008 Value: $6 Client: John Figoski | Permit type: Building | Permit status: Cmp | Completion date: October 3, 2008 | Current use: Single family detached dwelling, remodel | Permit id: Pmt2008-03962 | |||||
SCORE 95 Minor interior remodel of kitchen in single family residence including soffit removal, associated electrical wor, relocation of plumbing fixtures, installation of gas line for range, installation of new hood vent. Associated flooring, cabinetry and countertops that do not require a permit are associated with project. Client: John Figoski | Permit type: Building, electrical, mechanical, plumbing | Permit status: Iss | Current use: Single family detached dwelling, remodel | Permit id: Pmt2011-02314 | |||||
SCORE 94 Installation of a 7. 68 kw solar array, flush mounted and grid tied Client: Tracy Tu | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 14, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-04751 | |||||
SCORE 95 Interior remodel to three second floor bathrooms in a single family detached dwelling. No net change in plumbing fixtures. Client: D Rendlemman | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: February 17, 2016 | Current use: Single family detached dwelling, remodel | Permit id: Pmt2015-03784 | |||||
SCORE 95 Replacement forced air furnace, replacement comfort cooling Client: D Rendlemman | Permit type: Mechanical | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2015-20122 | |||||
Retaining wall Date: May 2, 2000 Value: $1,000 Client: John Figoski | Permit type: Fence | Permit status: Cmp | Completion date: August 23, 2000 | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-01793 | |||||
SCORE 95 Interior remodel for basement finish and first floor, including installation of new basement bedroom, office, full bath and family room, and kitchen reconfiguration, installation of spiral stair, misc. Wall and door work, and associated electrical, mechanical, and plumbing work. Client: Douglas Mckenna | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: October 29, 2004 | Current use: Single family detached dwelling, remodel | Permit id: Pmt2004-02330 | |||||
SCORE 88 Installation of approximately 2 linear feet of 6 foot fencing. Fence to be installed according to submitted plans, w a removable section across an easement. Client: James Bloomer | Permit type: Fence | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-01922 | |||||
SCORE 95 Total tear-off & reroof of 37 squares on a sfd, compostion shingle on a pitch represented as 4 12. Client: John Figoski | Permit type: Roofing | Permit status: Cmp | Completion date: August 16, 2007 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-03066 | |||||
SCORE 95 Replacement forced air furnace Client: Douglas Mckenna | Permit type: Mechanical | Permit status: Cmp | Completion date: February 4, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-20335 | |||||
Add and replace decks in sfd. Date: April 9, 2008 Value: $5,498 Client: James Bloomer | Permit type: Building | Permit status: Cmp | Completion date: March 20, 2012 | Current use: Single family detached dwelling, deck, n | Permit id: Pmt2008-01127 | |||||
SCORE 100 Remove existing shingles and re-roof single-family residence with dimensional shingles. 46 squares, 4:12 pitch. Client: Douglas Long | Permit type: Roofing | Permit status: Cmp | Completion date: June 2, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-01805 | |||||
Remove 2 windows and door and install 1 10footx6foot 8inch french gliding door replace header. Sfd Date: September 11, 2008 Value: $6,800 Client: John Figoski | Permit type: Building | Permit status: Cmp | Completion date: October 3, 2008 | Current use: Single family detached dwelling, remodel | Permit id: Pmt2008-03962 | |||||
SCORE 95 Installation of new cedar privacy fence along northern property line. Fence is required to include a 12 foot opening for access to city of boulder sewer main. Value: $1,300 Contractor: Boulder Fence Company Client: James Bloomer | Permit type: Fence | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-00175 |