Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Equipment work Date: November 27, 2013 Permit status: Permit issued | Permit id: 42092694801 | |||||
SCORE 99 Plumbing Date: November 27, 2013 Contractor: Lloyd G Drummond Plbg And Gen Permit status: Permit issued | Permit id: 42092694801 | |||||
SCORE 86 Equipment work Date: November 27, 2013 Contractor: Dahill Construction Co. I Permit status: Permit issued | Permit id: 42092694801 | |||||
Keyspan provides gas to boiler/hot water heater. Date: August 25, 2005 Permit type: Util | Permit id: E606074 | |||||
Repair all leaks in basement. Install shut-off valves at base of all risers. Restore water to boiler and water heaters. Insulate pipes. Note: co Date: January 23, 2004 Permit type: Plumb | Permit id: E414076 | |||||
Clean boiler, flue and base of chimney. Install a 7 flue tee with 7 damper. Install spill switch. Replace gas valve 1/2. Replace pressuretrol. Date: December 24, 2003 Permit type: Heat | Permit id: E411255 | |||||
As per rc # 2003001159202 (b&n&k), perform asbestos abatement work as per hpd specification throughout basement and boiler room, on ft. Of pipe in Date: February 9, 2004 Permit type: Asbest | Permit id: E415901 | |||||
As per mini rc#2004000226202 (eas) and hpd specification, perform polarized light microscopy (plm) analysis of 03 samples for asbestos content utilizi Date: February 9, 2004 Permit type: Asbest | Permit id: E415875 | |||||
Make all necessary repairs to gas fired boiler to restore to proper working order. Restore heat into building. Note: contractor must contact hpd a Permit type: Heat | Permit id: E414354 | |||||
Remove existing heating plant and install new gas fired boiler. Install new cast iron/ steel gas fired boiler to supply adequate heat and hot water t Date: February 25, 2004 Permit type: Heat | Permit id: E417248 | |||||
As per mini rc #2004000226202 (eas) and hpd specification perform phase contrast microscopy (pcm) analysis of 05 air samples for fiber content utilizi Date: February 11, 2004 Permit type: Asbest | Permit id: E416075 | |||||
Make all necessary repairs to gas fired boiler to restore to proper working order. Restore heat into building. Note: contractor must contact hpd a Permit type: Heat | Permit id: E414354 | |||||
Make all necessary repairs to gas fired boiler to restore to proper working order. Restore heat into building. Note: contractor must contact hpd a Permit type: Heat | Permit id: E414354 |