Remove one 6000-gallon underground storage tank, containing diesel fuel for emergency generator Date: April 20, 2012 Client: Verizon Washington Dc Inc | Applicant: Verizon Washington Dc Tax Dept.; Steve Burns | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ut1200055 | |||||
Excavation and install sheeting and shoring/underpinning bracing system as shown on the attached steel foundation llc plans. Date: October 24, 2012 Client: Verizon Washington Dc Inc | Applicant: Eastbanc; John Giuseppe-Ramco | Permit type: Sheeting and shoring | Permit status: Permit issued | Permit id: Sh1200094 | |||||
Plumbing and gas Date: February 8, 2012 Client: Verizon Washington Dc Inc | Permit status: Completed | Permit id: P1203014 | |||||
The proposed project is a new addition to the existing verizon building located at 1045 wisconsin ave. Nw. The proposed project will be a four story residential building seven (7) units and two levels of subsurface parking. A retail component is included on the ground floor that fronts wisconsin avenue. All as shown on the attached plans. Date: June 5, 2013 Client: Verizon Washington Dc Inc | Applicant: John Giuseppe-Ramco | Permit type: Addition alteration | Permit status: Permit issued | Permit id: B1206198 | |||||
Erect temporary scaffolding -covered pedestrian walkway Date: August 13, 2013 Client: East Banc | Applicant: John Pfeiffer | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sc1300150 | |||||
After hours to put up tower. Crane with mobile crane saturday and sundy 5am to 9 pm Date: August 1, 2013 Client: Verizon Washington Dc Inc | Applicant: Miller? Long | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300777 | |||||
Tower crane for jobsite use Date: August 1, 2013 Client: Miller? Long | Applicant: Miller? Long | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tc1300028 | |||||
Plumbing and gas Date: July 29, 2013 Client: Verizon Washington Dc Inc | Applicant: Richard V Carey | Permit status: Completed | Permit id: P1306736 | |||||
Revision to bldg. Permit b1206198 to show changes to south and west facade of new building as shown on the cfa and hprb approved plans. Date: February 3, 2014 Client: Eastbanc Inc. | Applicant: John Giuseppe-Ramco | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1403785 | |||||
Afterhours to take down tower crane with 2 ton crane sat ? Sun 3/22/2013 and 3/23/2014 from 5am to 9pm Date: March 19, 2014 Client: Miller?long | Applicant: Miller?long | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1400341 | |||||
Type of elevator : two (2) traction/steel / central/vertical transportion Date: July 8, 2014 Client: Verizon Washington Dc Inc | Applicant: Otis Elevator Company | Permit type: Elevator - new | Permit status: Permit issued | Permit id: En1402325 | |||||
Plumbing and gas Date: May 19, 2014 Client: Verizon Washington Dc Inc | Applicant: Richard V Carey | Permit status: Completed | Permit id: P1405640 | |||||
SCORE 96 Electrical Date: February 3, 2012 Contractor: Bernard G Kalb Client: Verizon Washington Dc Inc | Permit status: Permit issued | Permit id: E1203218 | |||||
Plumbing and gas Date: February 8, 2012 Client: Verizon Washington Dc Inc | Permit status: Completed | Permit id: P1203014 | |||||
SCORE 96 Electrical Date: April 18, 2013 Contractor: Robert T. Katski Client: Verizon Washington Dc Inc | Permit status: Completed | Permit id: E1304636 | |||||
SCORE 96 Electrical Date: October 16, 2013 Contractor: Robert T. Katski Client: Verizon Washington Dc Inc | Permit status: Completed | Permit id: E1400472 | |||||
SCORE 96 Electrical Date: August 8, 2013 Contractor: Robert T. Katski Client: Verizon Washington Dc Inc | Permit status: Permit issued | Permit id: E1307524 | |||||
SCORE 88 Mechanical Date: September 5, 2013 Contractor: Charles A. Klein Client: Verizon Washington Dc Inc | Permit status: Completed | Permit id: M1302830 | |||||
SCORE 93 Mechanical Date: October 24, 2013 Contractor: Michael W. Karnes Client: Verizon Washington Dc Inc | Permit status: Permit issued | Permit id: M1400192 | |||||
SCORE 96 Plumbing and gas Date: July 29, 2013 Contractor: Richard V Carey Client: Verizon Washington Dc Inc | Permit status: Completed | Permit id: P1306736 | |||||
Plumbing and gas Date: October 16, 2013 Client: Verizon Washington Dc Inc | Permit status: Completed | Permit id: P1400411 | |||||
SCORE 96 Plumbing and gas Date: May 19, 2014 Contractor: Richard V Carey Client: Verizon Washington Dc Inc | Permit status: Completed | Permit id: P1405640 | |||||
SCORE 96 Electrical Date: August 24, 2016 Contractor: David R Jarrell Client: Verizon Washington Dc Inc | Permit status: Permit issued | Permit id: E1609530 | |||||
Plumbing and gas Date: February 8, 2012 Client: Verizon Washington Dc Inc | Permit status: Completed | Permit id: P1203014 | |||||
SCORE 56 Remove one 6000-gallon underground storage tank, containing diesel fuel for emergency generator Date: April 20, 2012 Contractor: Verizon Washington Dc Tax Dept. Steve Burns Client: Verizon Washington Dc Inc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ut1200055 | |||||
SCORE 96 Electrical Date: August 8, 2013 Contractor: Robert T. Katski Client: Verizon Washington Dc Inc | Permit status: Permit issued | Permit id: E1307524 | |||||
SCORE 93 Mechanical Date: October 24, 2013 Contractor: Michael W. Karnes Client: Verizon Washington Dc Inc | Permit status: Permit issued | Permit id: M1400192 | |||||
SCORE 88 Mechanical Date: September 5, 2013 Contractor: Charles A. Klein Client: Verizon Washington Dc Inc | Permit status: Completed | Permit id: M1302830 | |||||
SCORE 96 Plumbing and gas Date: July 29, 2013 Contractor: Richard V Carey Client: Verizon Washington Dc Inc | Permit status: Completed | Permit id: P1306736 | |||||
Plumbing and gas Date: October 16, 2013 Client: Verizon Washington Dc Inc | Permit status: Completed | Permit id: P1400411 | |||||
SCORE 59 Excavation and install sheeting and shoring/underpinning bracing system as shown on the attached steel foundation llc plans. Date: October 24, 2012 Contractor: Eastbanc John Giusepperamco Client: Verizon Washington Dc Inc | Permit type: Sheeting and shoring | Permit status: Permit issued | Permit id: Sh1200094 | |||||
SCORE 96 Plumbing and gas Date: May 19, 2014 Contractor: Richard V Carey Client: Verizon Washington Dc Inc | Permit status: Completed | Permit id: P1405640 | |||||
SCORE 96 Electrical Date: February 3, 2012 Contractor: Bernard G Kalb Client: Verizon Washington Dc Inc | Permit status: Permit issued | Permit id: E1203218 | |||||
Plumbing and gas Date: February 22, 2012 Client: Verizon Washington Dc Inc | Permit status: Permit issued | Permit id: P1203338 | |||||
SCORE 96 Plumbing and gas Date: May 19, 2014 Contractor: Richard V Carey Client: Verizon Washington Dc Inc | Permit status: Completed | Permit id: P1405640 | |||||
SCORE 93 The proposed project is a new addition to the existing verizon building located at 1045 wisconsin ave. Nw. The proposed project will be a four story residential building seven (7) units and two levels of subsurface parking. A retail component is included on the ground floor that fronts wisconsin avenue. All as shown on the attached plans. Date: June 5, 2013 Contractor: John Giusepperamco Client: Verizon Washington Dc Inc | Permit type: Addition alteration repair | Permit status: Permit issued | Permit id: B1206198 | |||||
SCORE 89 After hours to put up tower. Crane with mobile crane saturday and sundy 5am to 9 pm Date: August 1, 2013 Contractor: Miller Long Client: Verizon Washington Dc Inc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300777 | |||||
SCORE 99 Erect temporary scaffolding -covered pedestrian walkway Date: August 13, 2013 Contractor: John Pfeiffer Client: East Banc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sc1300150 | |||||
SCORE 89 Tower crane for jobsite use Date: August 1, 2013 Contractor: Miller Long Client: Miller? Long | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tc1300028 | |||||
SCORE 93 Revision to bldg. Permit b1206198 to show changes to south and west facade of new building as shown on the cfa and hprb approved plans. Date: February 3, 2014 Contractor: John Giusepperamco Client: Eastbanc Inc. | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1403785 | |||||
SCORE 56 Remove one 6000-gallon underground storage tank, containing diesel fuel for emergency generator Date: April 20, 2012 Contractor: Verizon Washington Dc Tax Dept.; Steve Burns Client: Verizon Washington Dc Inc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ut1200055 | |||||
SCORE 96 Electrical Date: February 3, 2012 Contractor: Bernard G Kalb Client: Verizon Washington Dc Inc | Permit status: Permit issued | Permit id: E1203218 | |||||
Plumbing and gas Date: February 22, 2012 Client: Verizon Washington Dc Inc | Permit status: Permit issued | Permit id: P1203338 | |||||
Plumbing and gas Date: February 8, 2012 Client: Verizon Washington Dc Inc | Permit status: Completed | Permit id: P1203014 | |||||
SCORE 93 Mechanical Date: October 24, 2013 Contractor: Michael W. Karnes Client: Verizon Washington Dc Inc | Permit status: Permit issued | Permit id: M1400192 | |||||
SCORE 96 Electrical Date: August 8, 2013 Contractor: Robert T. Katski Client: Verizon Washington Dc Inc | Permit status: Permit issued | Permit id: E1307524 | |||||
SCORE 96 Electrical Date: April 18, 2013 Contractor: Robert T. Katski Client: Verizon Washington Dc Inc | Permit status: Completed | Permit id: E1304636 | |||||
SCORE 96 Electrical Date: October 16, 2013 Contractor: Robert T. Katski Client: Verizon Washington Dc Inc | Permit status: Completed | Permit id: E1400472 | |||||
SCORE 96 Plumbing and gas Date: July 29, 2013 Contractor: Richard V Carey Client: Verizon Washington Dc Inc | Permit status: Completed | Permit id: P1306736 | |||||
Plumbing and gas Date: October 16, 2013 Client: Verizon Washington Dc Inc | Permit status: Completed | Permit id: P1400411 | |||||
SCORE 88 Mechanical Date: September 5, 2013 Contractor: Charles A. Klein Client: Verizon Washington Dc Inc | Permit status: Completed | Permit id: M1302830 | |||||
SCORE 96 Plumbing and gas Date: May 19, 2014 Contractor: Richard V Carey Client: Verizon Washington Dc Inc | Permit status: Completed | Permit id: P1405640 | |||||
SCORE 86 Install a rectangular rooftop outdoor box pool, 45 x 15. Date: March 23, 2015 Contractor: Spurge Eismeier Permits By Pinecrest Client: Eastbanc | Permit type: Swimming pool | Permit status: Permit issued | Permit id: Sp1400012 | |||||
SCORE 96 Electrical Date: August 24, 2016 Contractor: David R Jarrell Client: Verizon Washington Dc Inc | Permit status: Permit issued | Permit id: E1609530 | |||||
SCORE 59 Excavation and install sheeting and shoring/underpinning bracing system as shown on the attached steel foundation llc plans. Date: October 24, 2012 Contractor: Eastbanc; John Giusepperamco Client: Verizon Washington Dc Inc | Permit type: Sheeting and shoring | Permit status: Permit issued | Permit id: Sh1200094 | |||||
SCORE 89 Afterhours to take down tower crane with 2 ton crane sat ? Sun 3/22/2013 and 3/23/2014 from 5am to 9pm Date: March 19, 2014 Contractor: Miller Long Client: Miller?long | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1400341 | |||||
SCORE 95 Type of elevator : two (2) traction/steel / central/vertical transportion Date: July 8, 2014 Contractor: Otis Elevator Company Client: Verizon Washington Dc Inc | Permit type: Elevator - new | Permit status: Permit issued | Permit id: En1402325 |