Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Roof mount residential solar pv for existing sfd no. Of modules: 16 no. Of inverters: 1 (33 kw) total system size in kilowatts: 3. 7 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: July 27, 2011 Permit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: September 1, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 79 This project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: June 12, 2015 Contractor: Matt Mauzy Permit type: Mechanical : 8023 - | Permit status: Permit issued | Permit id: Pds2015-Resalt- | |||||
Roof mount residential solar pv for existing sfd no. Of modules 16 no. Of inverters 1 (33 kw) total system size in kilowatts 3. 7 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: July 27, 2011 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 1, 2011 | Permit id: Pds2011-1031-20 | |||||
SCORE 99 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: June 12, 2015 Contractor: M N Mauzy Mechanical Inc Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2015-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd no. Of modules 16 no. Of inverters 1 (33 kw) total system size in kilowatts 3. 7 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: July 27, 2011 Contractor: Solaire Energy Systems Permit type: Residential alteration-addn | Permit status: Completed | Completion date: September 1, 2011 | Permit id: Pds2011-1031-20 | |||||
Final Date: August 30, 2011 Permit status: Pass | Permit id: Pds2011-1031-20 |