Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 Plumbing and gas Date: December 12, 2016 Contractor: Moris O Ochoa Pineda Sr Client: Tuan T Huynh | Permit status: Permit issued | Permit id: P1701993 | |||||
SCORE 97 Mechanical Date: December 6, 2016 Contractor: Ralph Jackson Client: Tuan T Huynh | Permit status: Permit issued | Permit id: M1700614 | |||||
SCORE 56 Interior renovation to include the following: modified kitchen new first floor bathroom modified second floor bathroom repair roofing as required new mechanical system and duckwork existing electrical system to remain Date: October 20, 2016 Contractor: Final Jahabin; Kemaurelle Preddie Client: Final Jahabin | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1700723 | |||||
SCORE 56 Replacement in kind of interior wall coverings. Replacement in kind, when applied to architectural features, means replacement with a feature of like material that replicates the existing feature in proportion, appearance, texture, design, detail and dimensions. Date: October 19, 2016 Contractor: Ava Shahdadian Client: Ava Shahdadian | Permit type: Building | Permit status: Permit issued | Permit id: Pc84547425 | |||||
SCORE 56 Interior demolition of non-bearing elements in a space up to 5,0 square feet (464. 5 square meters) Date: October 19, 2016 Contractor: Ava Shadadian Client: Ava Shadadian | Permit type: Building | Permit status: Permit issued | Permit id: Pc25846956 | |||||
SCORE 82 Plumbing and gas Date: December 12, 2016 Contractor: Moris O Ochoa Pineda Sr Client: Tuan T Huynh | Permit status: Completed | Permit id: P1701993 | |||||
SCORE 97 Mechanical Date: December 6, 2016 Contractor: Ralph Jackson Client: Tuan T Huynh | Permit status: Completed | Permit id: M1700614 | |||||
SCORE 96 Electrical Date: January 10, 2017 Contractor: Robert K Willett Client: Ava F Shahdadian | Permit status: Completed | Permit id: E1702704 |