Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Plumbing permit Date: April 20, 2015 Client: Zion Non-Profit Corp | Client Company: Zion Baptist Church | Permit status: Completed | Permit id: 587296 | |||||
Alteration permit Date: December 29, 2014 Client: Zion Non-Profit Corp | Client Company: Zion Baptist Church | Permit status: Completed | Permit id: 572418 | |||||
Mechanical permit Date: April 14, 2015 Client: Zion Non-Profit Corp | Client Company: Zion Baptist Church | Permit status: Completed | Permit id: 594872 | |||||
Alteration permit Date: February 5, 2015 Client: Zion Non-Profit Corp | Client Company: Zion Baptist Church | Permit status: Completed | Permit id: 585798 | |||||
Use permit Date: August 19, 2014 Client: Zion Non-Profit Corp | Client Company: Zion Baptist Church | Permit status: Completed | Permit id: 547497 | |||||
Electrical permit Date: February 18, 2015 Client: Zion Non-Profit Corp | Client Company: Zion Baptist Church | Permit status: Expired | Permit id: 582484 | |||||
Mechanical permit Date: April 14, 2015 Client: Zion Nonprofit Group | Client Company: Zion Baptist Church | Permit status: Completed | Permit id: 594872 | |||||
Use permit Date: December 16, 2014 Client: Zion Nonprofit Group | Client Company: Zion Baptist Church | Permit status: Completed | Permit id: 580093 | |||||
Electrical permit Date: February 18, 2015 Client: Zion Nonprofit Group | Client Company: Zion Baptist Church | Permit status: Expired | Permit id: 582484 | |||||
Alteration permit Date: February 5, 2015 Client: Zion Nonprofit Group | Client Company: Zion Baptist Church | Permit status: Completed | Permit id: 585798 | |||||
Plumbing permit Date: April 20, 2015 Client: Zion Nonprofit Group | Client Company: Zion Baptist Church | Permit status: Completed | Permit id: 587296 | |||||
Alteration permit Date: December 29, 2014 Client: Zion Nonprofit Group | Client Company: Zion Baptist Church | Permit status: Completed | Permit id: 572418 | |||||
SCORE 100 For selective interior demolition and for level iii alterations (no change in occupancy) to create new apartment units (with accessible units). Separate permits required for mechanical, electrical, plumbing, and fire suppression systems. All asbestos to be treated & removed prior to commencement of work. Date: December 29, 2014 Contractor: Daniel J Keating Company Client: Zion Nonprofit Group | Client Company: Zion Baptist Church | Permit type: Alteration permit | Permit status: Completed | Completion date: November 21, 2015 | Permit id: 572418 | |||||
SCORE 100 Work includes relocate & replace apt panels, adding new branch ckts, replace existing devices, new light fixtures & tying new mechanical equipment as per nec 2008 cc district no fire alarm on this permit Date: February 18, 2015 Contractor: C.A.D. Electric Inc Client: Zion Nonprofit Group | Client Company: Zion Baptist Church | Permit type: Electrical permit | Permit status: Completed | Completion date: February 15, 2017 | Permit id: 582484 | |||||
For use as 48 dwelling units with 49 accessory, off-street open-air parking spaces including 3 accessible spaces. Size and location as shown on plans. Date: December 16, 2014 Client: Zion Nonprofit Group | Client Company: Zion Baptist Church | Permit type: Use permit | Permit status: Completed | Completion date: December 16, 2014 | Permit id: 580093 | |||||
1st floor 16 residential units. 2nd floor 16 residential units. 3rd floor, add 2 additional units for a total of 18 residential units. Re-stripe parking lot. Date: August 19, 2014 Client: Zion Nonprofit Group | Client Company: Zion Baptist Church | Permit type: Use permit | Permit status: Completed | Completion date: August 19, 2014 | Permit id: 547497 | |||||
SCORE 100 New waste stacks & fixtures throughout for clothes washer standpipe boxes and drainage pans in buildings "g" to "l" (50)units total - work will comply with the approved plans and the philadelphia plumbing code 2004 Date: April 20, 2015 Contractor: Eagle Mechanical Inc Client: Zion Nonprofit Group | Client Company: Zion Baptist Church | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 14, 2016 | Permit id: 587296 | |||||
SCORE 100 Alterations to existing hvac system including new fin tube radiation, through the wall a c units, exhaust fans, split system a c units with hot water heat, dryer vents, two condensing boilers and hydronic pumps as per approved plans. Date: April 14, 2015 Contractor: Eagle Mechanical Inc Client: Zion Nonprofit Group | Client Company: Zion Baptist Church | Permit type: Mechanical permit | Permit status: Completed | Completion date: March 14, 2016 | Permit id: 594872 | |||||
SCORE 100 Fixture replacement (water closets, lavatories & kitchen sinks) only throughout buildings "g" to "l" (50)units total - clothes washer pans washer boxes require plan review and a separate permit application will be obtained Date: January 29, 2015 Contractor: Eagle Mechanical Inc Client: Zion Nonprofit Group | Client Company: Zion Baptist Church | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 14, 2016 | Permit id: 583630 | |||||
SCORE 100 Permit application in response to unsafe dangerous violations. To comply violations # 463719 & 464044. Completed work is to be inspected and approved as an appropriate repair to each violation. No engineers report submitted. Licensed contractor to assume responsibility of work no other work allowed in this permit. Separate permits required for renovation, plumbing, electric and hvac. Contact streets department for any dumpster and or footway closure permits. Date: February 5, 2015 Contractor: Daniel J Keating Company Client: Zion Nonprofit Group | Client Company: Zion Baptist Church | Permit type: Alteration permit | Permit status: Completed | Completion date: February 25, 2015 | Permit id: 585798 |