Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Cap off unused branches on gas line and pressure test and restore service Date: November 17, 2014 Contractor: Rayne Plumbing And Sewer Service Inc Permit status: Permit issued | Permit id: 14000-02966 | |||||
SCORE 100 13-1648: per inspector, structural calculations for the anchorage of equipment is required. Date: July 16, 2013 Contractor: Contra Costa Electric Inc Permit status: Permit issued | Permit id: 13rev-00450 | |||||
SCORE 100 Remove and reinstall existing electrical panel equipment for the purpose of replacing concrete slabs Date: June 20, 2013 Contractor: Contra Costa Electric Inc Permit status: Permit issued | Permit id: 13000-01648 | |||||
Utility relocation: scope of work includes relocating water, fire lines, fas, stormwater, and sanitary sewer to the perimeter of the property. Replace 30 amp service that serves all four (4) buildings. Date: May 29, 2015 Value: $250,000 Permit status: In plan check | Permit id: 15000-01351 | |||||
SCORE 100 14-1065: revised plans include clarification construction trash enclosure Date: March 3, 2017 Contractor: Devcon Construction Incorporated Permit status: Completed | Permit id: 17rev-00131 | |||||
SCORE 100 Site development for (4) 2 story building office park with below grade parking to include landscaping, hardscape, civil utilities, site lighting, parking lots and drive aisles: 46,514 sq ft Permit status: Permit issued | Permit id: 14000-01069 | |||||
Demo exisiting 119,608 sq ft 2 story office building. New foundation and garage basement on permits 14-1065 thru 14-1069 Date: May 6, 2014 Permit status: In plan check | Permit id: 14000-01071 | |||||
SCORE 99 14000-01069: deferred submittal for site lighting Date: February 10, 2016 Contractor: Vance Brown Inc Permit status: Permit issued | Permit id: 16rev-00087 | |||||
SCORE 100 14000-01069: bulletin 16b revisions to include updates to trash enclosure details and associated landscape drainage at enclosures (building #1 #3 #4) no grading. Trash enclosure relocation at building #4 Date: March 3, 2017 Contractor: Devcon Construction Incorporated Permit status: Permit issued | Permit id: 17rev-00128 | |||||
SCORE 100 14000-01069: bulletin 16a revision to include (bulding 2) updated details to trash enclosure, associated landscape and water supply at trash enclosure. No grading (n) hatch door on floor 2nd floor (building 3) Date: March 3, 2017 Contractor: Devcon Construction Incorporated Permit status: Permit issued | Permit id: 17rev-00127 | |||||
14000-01069: 12 page mill building #3 bulletin #21 revision includes 2nd fl bathroom layout & associated mep change. Date: June 20, 2017 Permit status: Completed | Permit id: 17rev-00361 | |||||
14000-01069: revision to landscaping, landscape lighting, fountain vault location, and add dining terrace to seating, drainage, storm, and grading modifications. Date: June 23, 2017 Permit status: Completed | Permit id: 17rev-00370 | |||||
14000-01069: site improvements revision includes adding a (n) grease interceptor (trap also reference in 17rev-00386) (n) sanitary line from ext of builiding Date: June 28, 2017 Permit status: Completed | Permit id: 17rev-00385 | |||||
SCORE 100 Building 1: demo existing 145,734 sq ft 2 story office building. New office park under separate permits: 14-1065 thru 14-1069 (foundation and garage basements) Date: May 6, 2014 Contractor: Devcon Construction Incorporated Permit status: Permit issued | Permit id: 14000-01070 | |||||
SCORE 100 Building 1: 46,493 sq ft foundation and basement garage for future 2 story office building. Above grade portion of structure reviewed under 15rev-00753. Permit status: Permit issued | Permit id: 14000-01065 | |||||
14000-01069: revision includes addition of phone charging station, wi-fi camera poles, infrastructure and conduit for security equipment. Date: August 10, 2017 Permit status: Completed | Permit id: 17rev-00501 | |||||
14000-01067 01069: revision include new enclosure and pad for future generator. Relocated building 3 trash enclosure to accommodate new enclosure(17rev-00607). Fees for both revisions collected under this record. Date: August 10, 2017 Permit status: Permit issued | Permit id: 17rev-00500 | |||||
SCORE 90 Commercial construction power from an (e) transformer to service construction to building #1 & #4 via power skids. Date: December 20, 2017 Contractor: Redwood Electric Group Inc Permit status: In plan check | Permit id: 17000-03081 | |||||
SCORE 100 14-1069: revised landscape design includes relocating (5) trees. Date: December 22, 2017 Contractor: Devcon Construction Incorporated Permit status: In plan check | Permit id: 17rev-00802 |