Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Riverbank rd. Water main replacement Date: November 1, 2002 Permit id: 80-3630 | |||||
SCORE 100 W. O. #99022utility company # 7051425all work in row shall be reported to inspection line asap - (916) 617-4692. All work in row will conform to current city standards and specs (2002). Final engineering encroachment inspection is required. Install a 20" transmission pressure natual gas steel pipeline scope of work includes beginning s w of harbor blvd riverside rd and exiting river rd. On private property. Date: February 24, 2006 Contractor: Pg And E Permit id: 06-0118 | |||||
Geotechnical borings in riverbank rd between north hobson & fountain drive. Boring to be backfilled with cement slurry and upper 6" with aggregate concrete. (traffic control plan attached)a preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk or landscape will be repaired Date: January 25, 2007 Permit id: 07-0072 |