Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 Contractor to install the following utilities water mains, sewer mains, laterals and storm drains along potomac avenue, r street, half street, s street and other surrounding streets, if necessary. Monday through friday - 7am to 7pm and saturday 7am to 7pm. Date: August 5, 2016 Client: Department Of General Services | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600937 | |||||
SCORE 59 Rough grading and fill for the construction of the dc united stadium, including sediment and erosion control items and excavation and backfill associated with the separately submitted demolition permit. Work will also include the remediation of spoils per the previously approved cap plan for the site. Date: September 6, 2016 Contractor: Troy Dc United Client: Troy Dc United | Permit type: Excavation only | Permit status: Permit issued | Permit id: Ex1600101 | |||||
SCORE 64 This permit is for the installation of straw bale dike and construction staging area along the property line of 1 potomac avenue in preparation of razing the building on the site. Date: March 18, 2016 Client: District Of Columbia | Permit type: Excavation only | Permit status: Permit issued | Permit id: Ex1600049 | |||||
SCORE 59 Perform the demolition of slab-on-grade, equipment pads, asphalt paving, curb and gutter, utilities etc as required to prepare the site for the construction of the dc united stadium. The preparation work associated with the demolition of the buildings on site and the cut and cap of the utilities are being performed under a separate contract by the district of columbia. Demolition work only. Date: September 15, 2016 Contractor: Troy Dc United Client: District Of Columbia | Permit type: Demolition | Permit status: Permit issued | Permit id: D1600844 | |||||
SCORE 56 This project is for the dc united soccer stadium at buzzard point. This permit is for stormwater management, accessing utility laterals, and infrastructure right of way improvements. Date: June 2, 2016 Contractor: Mckissack And Mckissack; Cassidy Mullen Client: - District Of Columbia | Permit type: Civil plans | Permit status: Permit issued | Permit id: Bciv1600032 | |||||
SCORE 61 Raze a one story dome that is utilized for salt storage Date: June 17, 2016 Contractor: Mckissack Client: District Of Columbia | Permit type: Raze | Permit status: Permit issued | Permit id: R1600040 | |||||
SCORE 56 Contractor to install the following utilities water mains, sewer mains, laterals and storm drains along potomac avenue, r street, half street, s street and other surrounding streets, if necessary. Monday through friday - 7am to 7pm and saturday 7am to 7pm. Date: August 5, 2016 Client: Department Of General Services | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600937 | |||||
SCORE 59 Foundation to grade for areas 2, 3 and 4 of the dc united stadium project. Date: March 30, 2017 Contractor: Dc Stadium Llc; Jeffrey Owens Technologies Inc Client: Dc Stadium Llc | Permit type: Foundation only | Permit status: Permit issued | Permit id: Fd1700049 | |||||
SCORE 59 Foundation to grade for area 1 of the dc united stadium project. Date: February 23, 2017 Contractor: Dc Stadium Llc Client: Dc Stadium Llc | Permit type: Foundation only | Permit status: Permit issued | Permit id: Fd1700035 | |||||
SCORE 69 Temporary construction trailer within the new dc united soccer stadium. Date: May 12, 2017 Contractor: Mascaro Construction Co Client: Randy Swanson Dc Stadium Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1708247 | |||||
SCORE 59 Installation of temporary jobsite construction trailers including one double trailer and one quad trailer. Utility connections to be perfformed with trade permits. Date: February 8, 2017 Contractor: Dc Stadium Llc Client: Dc Stadium Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1704458 | |||||
SCORE 62 Sheeting and shoring for the dc united soccer stadium project. Date: March 9, 2017 Contractor: District Of Columbia Dept Of General Services Client: District Of Columbia | Permit type: Sheeting and shoring | Permit status: Permit issued | Permit id: Sh1700016 | |||||
Electrical Date: April 17, 2017 Client: Dc Stadium Llc | Permit status: Permit issued | Permit id: E1705608 | |||||
SCORE 96 Electrical Date: March 31, 2017 Contractor: Eduardo L. Lopez Client: Dc Stadium, Llc | Permit status: Permit issued | Permit id: E1705157 | |||||
SCORE 96 Plumbing and gas Date: April 7, 2017 Contractor: Thomas M. Kessler Client: Dc Stadium Llc | Permit status: Permit issued | Permit id: P1704986 | |||||
SCORE 96 Plumbing and gas Date: March 9, 2017 Contractor: Thomas M. Kessler Client: Dc Stadium Llc | Permit status: Permit issued | Permit id: P1704298 | |||||
SCORE 96 Plumbing and gas Date: February 6, 2017 Contractor: Thomas M. Kessler Client: Dc Govt | Permit status: Permit issued | Permit id: P1703397 | |||||
1st extension to permit# bciv1600032 to expire 12 02 2017 Date: June 15, 2017 Client: Department Of General Services | Permit type: Civil plans | Permit status: Permit issued | Permit id: Bciv1700140 | |||||
SCORE 59 This is a third party reviewed tpr application for the superstructure portion of the new dc united stadium project. Date: June 26, 2017 Contractor: Dc Stadium Llc; Jeffrey Owens Technologies Inc Client: Dc Stadium Llc | Permit type: New building | Permit status: Permit issued | Permit id: B1708000 |