Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Permit id: 03-06-166 | Parcel: 058121002000 | |||||
Permit id: 05-05-265 | Parcel: 001010001000 | |||||
Permit id: 98-08-090 | Parcel: 046170001000 | |||||
Do not erase this record! - ss, jefferson blvd water main city project (w. O. 2519) Permit id: 80-3026 | |||||
Wo 1209 remove and replace power pool for jefferson widening project. Permit id: 03-0621 | Parcel: 058121002000 | |||||
SCORE 72 Jefferson blvd - w. O. 1524 pre-bid potholes for jefferson blvd widening ii. All work shall conform to city standards. Traffic control will be submitted to the city prior to working in the r. O. W. Permit id: 03-0791 | |||||
Directional bore to install conduites from existing pacific bell manhole to existing qwest manhole on sacramento ave and jefferson blvd. Directional bore to connect level 3 manhole and pacific bell manhole on triangle ct. All work shall conform to city standards. All appropriate traffic control shall be in place during construction. Permit id: 03-0901 | |||||
SCORE 86 Jefferson bl from highland to lake washington bl.; pothole 75 locations for verificaton of underground facilities in relation to city wo 1524 --contractor to submit traffic plan prior to work in right-of-way. Permit id: 03-1005 | |||||
W. O.# 1524 - jefferson blvd widening project expose and relocate 4 of buried cable due to city storm and sewer project. Buried cable will be placed back at 5 min depth after city project completion. Permit id: 04-0332 | |||||
SCORE 100 W. O. 1524 (jefferson widening project (city project) - pge to remove (7) seven power poles and install (5) power poles. Permit id: 03-0443 | |||||
99022 install new electric cable in existing conduit. Install electric switches on existing pads, install electric switches appropriate traffic control will be used at all times while working in row. Call inspection line when final!!! Permit id: 04-0492 | |||||
99022 install new electric cable in existing conduit. Install transformers on existing pads. Appropriate traffic control will be used at all times while working in row. Call inspection line when final!!! Permit id: 04-0493 | |||||
99022 install new electric cable in existing conduit. Install transformers and switches on existing pads. Appropriate traffic control will be used at all times while working in row. Call inspection line when final!!! Permit id: 04-0494 | |||||
99015 directional bore, route as shown on attached drawings. Excavate & place 17x30x26 vaults, backfill per city standards. All work shall comply with city standards and specs. All appropriate traffic control shall be in place while working in row. Permit id: 04-0482 | |||||
SCORE 86 Relocate conduit & expose ducts as shown on approved plans. All work shall conform to city standard specifications, state traffic control, and all other regulations. Work order number 1524. Approved by cip - j. D. Permit id: 04-0580 | |||||
Emergency repair of pipeline at jefferson and 19th. Max 10x pit. Trench to be restored as per city standard detail or as directed by city inspector. Type "a" asphalt required. Open grade surface (0. 8 inch) to to replaced as per original specification. Open grade area to be 4 beyond pit area or as directed by city inspector. Grind method to be approved by city inspector. Compaction method as directed by city inspector. Road surface to be restored to original condition, including strip Permit id: 04-0925 | |||||
W. O. # 3323pipeline cleaning and tv inspection of sewer lines Permit id: 05-0105 | |||||
Bore 618 of 1-4" conduit in r w n s s. River rd e o gregory ave. Permit id: 05-0323 | |||||
SCORE 83 Installation of 2" secondary water meter downstream of pheasant hollow cfd 2" meter, and connection of jefferson irrigation controller wiring to pheasant hollow cfd controller. (wo 1524) Permit id: 05-1061 | |||||
SCORE 83 2" water meter and backflow device for landscape irrigation of jefferson blvd. South of blacker rd. Permit id: 05-1268 | |||||
W. O. 3325 jefferson tributary sanitary sewer rehabilitation projectall work in row shall be reported to inspection line at - (916) 617-4692. All work in r o w will conform to current city standards and specs (2002). Final engineering encroachment inspection is required. Permit id: 06-0184 | |||||
SCORE 100 Installation of new district regulation station at new r w on n w side of lake washington blvd. Also install new 6" plastic gas distribution line to intercept existing 6" pl gas main @ lake washington blvd. See attached dwg. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk or landscape will be repaired. Cancelled permit per patricia Permit id: 06-0372 | |||||
W. O. #utility company # a preconstruction meeting is required: call (916) 617-4692. All work in row will conform to current city standards and specs (2002). Final engineering encroachment inspection is required. Placing (3) intercept manholes over existing duct structure to access conduits. Permit id: 06-0404 | |||||
W. O. 99003job#5991333. Dig pit adjacent to existing sub-box. Bore 4 place 2 duct to pole behind 2237 kinsington. All work behind sidewalka preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk or landscape will be repaired. Permit id: 07-0111 | |||||
Wo#62510. Barge canal access improvements. Asphalt road access and park equipment and fencing. A preconstruction meeting is required (chris surwaski--916 919-3577) all work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk or landscape will be repaired. Permit id: 07-0723 | Parcel: 067180036000 | |||||
Manhole to be raised iron and asphalt to grade. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk or landscape will be repaired. Permit id: 09-0232 |