Building Permits at 0 Chestnut Hill Av Brighton MA


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 0 Chestnut Hill Av Brighton MA over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Stand crane at curb/ erect pedestrian staging on sidewalk/ all work 7am-4pm/ police detail area a 343-4239
Date:  January 13, 2016

Permit type: Street occupancy permit | Expiration date: January 18, 2016 | Permit id: Occu-554670
2016/01/130950 Chestnut Hill Av Brighton Ma
Stand crane and truck in street erect and maintain pedestrian protective staging on sidewalk / 8am to 4pm post both sides of street
Date:  February 19, 2014

Client: Reservoir Tower | Permit type: Street occupancy permit | Expiration date: February 23, 2014 | Permit id: Occu-326154 | Parcel: 2102474000
2014/02/190950 Chestnut Hill Av Brighton Ma
SCORE
82
Install new water and drain lines; x 6; and 19 x 6; cobucs; 1333631299896; he 133411; grade 2a
Date:  April 24, 2012

Permit type: Excavation permit | Expiration date: June 24, 2012 | Permit id: Exca-134975
2012/04/240820 Chestnut Hill Av Brighton MaBond Cancelled Mackay Construction Service Corp
Erect and maintain pedestrian protective staging on sidewalk / 24 hrs
Date:  October 6, 2014

Permit type: Street occupancy permit | Expiration date: November 5, 2014 | Permit id: Occu-414349
2014/10/060950 Chestnut Hill Av Brighton Ma
Restore sidewalks that were damaged by bwsc during construction / boston police detail area d; 343-4210; [ see attached list of streets ]; extension
Date:  October 12, 2012

Permit type: Excavation permit | Expiration date: November 13, 2012 | Permit id: Exca-172318
2012/10/120950 Chestnut Hill Av Brighton Ma
1 chestnut hill ave/brighton ma
Date:  May 12, 2014

Permit type: Bfd asbestos removal | Permit id: Asb361749
2014/05/120950 Chestnut Hill Av Brighton Ma
Stand trailer &; generator at curb all work 24hrs
Date:  November 1, 2016

Permit type: Street occupancy permit | Expiration date: December 5, 2016 | Permit id: Occu-599921
2016/11/010950 Chestnut Hill Av Brighton Ma
Stand crane at curb erect pedestrian staging on sidewalk all work 7am-4pm police detail area a 343-4239
Date:  January 13, 2016

Permit type: Street occupancy permit | Expiration date: January 18, 2016 | Permit id: Occu-554670
2016/01/130950 Chestnut Hill Av Brighton Ma
Erect and maintain pedestrian protective staging on sidewalk 24 hrs
Date:  October 6, 2014

Permit type: Street occupancy permit | Expiration date: November 5, 2014 | Permit id: Occu-414349
2014/10/060950 Chestnut Hill Av Brighton Ma
Restore sidewalks that were damaged by bwsc during construction ; boston police detail area d; 343-4210; [ see attached list of streets ]; extension
Date:  October 12, 2012

Permit type: Excavation permit | Expiration date: November 13, 2012 | Permit id: Exca-172318
2012/10/120950 Chestnut Hill Av Brighton Ma
1 chestnut hill ave brighton ma
Date:  May 12, 2014

Permit type: Bfd asbestos removal | Permit id: Asb361749
2014/05/120950 Chestnut Hill Av Brighton Ma
Transport 1 oversize load see attached route 9:30am to 3:30pm
Date:  September 7, 2016

Permit type: Street occupancy permit | Expiration date: September 12, 2016 | Permit id: Occu-634381
2016/09/070950 Chestnut Hill Av Brighton Ma
Stand crane and truck in street erect and maintain pedestrian protective staging on sidewalk 8am to 4pm post both sides of street
Date:  February 19, 2014

Client: Reservoir Tower Associates | Permit type: Street occupancy permit | Expiration date: February 23, 2014 | Permit id: Occu-326154 | Parcel: 2102474000
2014/02/190950 Chestnut Hill Av Brighton Ma
SCORE
56
Sidewalk deposit during reconstruction of sidewalk and hp ramps after installation of updated traffic signals &; handholes .; ;deposit will be held until all construction activities are completed and the site is in walk=away condition.; upon written request a pwd engineer will inspect the site to verify that the restored sidewalk and h-ramps meet ada and city; standards.;permit; 60. 00; inspection; 825. 00; deposit; 105 210. 00

Permit type: Sidewalk deposit | Permit id: Sdep-704386
2017/05/160560 Chestnut Hill Av Brighton MaNational Development Cleveland Circle Development Assoc Holdings
Stand trailer &; generator at curb all work 24hrs; renewal
Date:  June 30, 2017

Permit type: Street occupancy permit | Expiration date: August 2, 2017 | Permit id: Occu-599921
2017/06/300950 Chestnut Hill Av Brighton Ma
Non-excavation of manholes; rapid flow; 9:30am-3:30pm; boston police detail area d; 343-4210; renewal
Date:  December 6, 2016

Permit type: Street occupancy permit | Expiration date: December 15, 2016 | Permit id: Occu-646111
2016/12/060950 Chestnut Hill Av Brighton Ma
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.