Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 16 Commerce St Boulder Co Total tear off and overlay of existing roof. Firestone asphalst sbs gap, 2 squares, 1 4 slope. Date: August 11, 2008 Contractor: Douglass Colony Group Inc Client: Corporatio Ball | Applicant: Douglass Colony Group, Inc | Permit type: Roofing | Permit status: N&v | Current use: Manufacturing, | |||||
SCORE 100 2425 55th St Boulder Co Removal of ballast material, tear-off of an existing membrane roof, installation of an new epdm membrane over a metal deck insulation, replace ballast material. 253 squares on a "flat" roof. Drainage of roof by interior drains & scuppers. Date: November 12, 2008 Contractor: Douglass Colony Group Inc Client: Core Tcam | Applicant: Douglass Colony Group, Inc | Permit type: Roofing | Permit status: Cmp | Completion date: December 10, 2010 | Current use: Office - admini | |||||
SCORE 100 13 College Av Boulder Co Total tear off and re-roof of existing commercial building. Tpo 20-yr, 33 squares, flat roof per appliication. R- minimum. Date: January 13, 2010 Contractor: Douglass Colony Group Inc Client: Hilltop Gcp | Applicant: Douglass Colony Group, Inc | Permit type: Roofing | Permit status: Cmp | Completion date: September 27, 2010 | Current use: Existing | |||||
SCORE 100 20 Broadway Boulder Co Partial tear off and reroof of existing non-residential structure. Mil epdm, 152 squares, flat roof. Date: July 22, 2010 Contractor: Douglass Colony Group Inc Client: Broadway Twenty-Sixty | Applicant: Douglass Colony Group, Inc | Permit type: Roofing | Permit status: Cmp | Completion date: September 23, 2010 | Current use: Existing | |||||
SCORE 100 29 Airport Rd Boulder Co Tear-off & rerooff of the bcso jail building. 333 squares of garland cold applied modified bituminous membrane. Pre-roof inspection consultation required. Date: August 13, 2010 Contractor: Douglass Colony Group Inc Client: County Boulder | Applicant: Douglass Colony Group, Inc | Permit type: Roofing | Permit status: Cmp | Completion date: August 16, 2011 | Current use: Hospital/instit | |||||
SCORE 100 25 Broadway Boulder Co Roofing permit - for firestone mil tpo on top of former bank building along north street. Date: December 27, 2010 Contractor: Douglass Colony Group Inc Client: Llc Frank | Applicant: Douglass Colony Group, Inc | Permit type: Roofing | Permit status: Cmp | Completion date: August 10, 2011 | Current use: Financial insti | |||||
SCORE 100 3375 Mitchell Ln Boulder Co Reroof of 288 squares -- combination of tear-off of existing roof; reinstall either ballasted epdm roof or fully adhered epdm with a portion being overlayed. Install tapered poly iso foam insulation. Utilize existing primary drains & scuppers for water drainage. Pre-reroof inspection required. Date: February 17, 2011 Contractor: Douglass Colony Group Inc Client: Ucar | Applicant: Douglass Colony Group, Inc | Permit type: Roofing | Permit status: Cmp | Completion date: July 29, 2011 | Current use: Research & deve | |||||
SCORE 100 56 Sioux Dr Boulder Co Removal of a ballasted roof system over epdm, remove existing epdm, install densedeck or equivalent, install new mil epdm membrane. 121 squares on a inchflatinch roof, positive drainage required. Pre-roof & mid-roof inspection required Date: May 4, 2011 Contractor: Douglass Colony Group Inc Client: Municipal Boulder | Applicant: Douglass Colony Group, Inc | Permit type: Roofing | Permit status: Cmp | Completion date: October 31, 2011 | Current use: Amusement/recre | |||||
SCORE 100 7088 Winchester Cr Boulder Co Partial tear-off & reroof of an office building (smaller building located on lot) -- squares on a inchflatinch roof, drainage through interior drains & scuppers. Removal of ballasted material, install new membrane, replace ballast. Pre-reroof insepction required. Date: June 22, 2011 Contractor: Douglass Colony Group Inc Client: Motion Micro | Applicant: Douglass Colony Group, Inc | Permit type: Roofing | Permit status: Cmp | Completion date: July 24, 2012 | Current use: Manufacturing, | |||||
SCORE 100 1925 30th St Boulder Co Installation of a 91 kw solar array, with a 15 degree angle of tilt on roof of existing apartment building Date: September 6, 2011 Contractor: Douglass Colony Group Inc Client: Level 2nd | Applicant: Douglass Colony Group, Inc | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 1, 2012 | Current use: Multifamily dwe | |||||
SCORE 100 16 30th St Boulder Co Remove existing roofing and re-roof king soopers building with firestone mil epdm. 623 squares, roof pitch represented by contractor to be 1 4:1. Date: August 23, 2011 Contractor: Douglass Colony Group Inc Client: Center Sunrise | Applicant: Douglass Colony Group, Inc | Permit type: Roofing | Permit status: Cmp | Completion date: November 14, 2011 | Current use: Commercial/reta | |||||
SCORE 100 16 28th St 1216 Boulder Co Installation of three inchsolartubeinch skylights at the san francisco company -- #1216. See engineering letter and manufacturerfoots installation literature for additional detail. Client: Ball Charlotte | Applicant: Douglass Colony Group, Inc | Permit type: Roofing | Permit status: N&v | Current use: Restaurant, rem | |||||
SCORE 100 36 Broadway Boulder Co Remove existing roofing and re-roof apartment building with built-up (firestone) roofing. 73 squares, roof pitch represented by contractor to be 2:12. Date: December 12, 2011 Contractor: Douglass Colony Group Inc Client: Authority Housing | Applicant: Douglass Colony Group, Inc | Permit type: Roofing | Permit status: Cmp | Completion date: January 30, 2012 | Current use: Multifamily dwe | |||||
SCORE 100 17 15th St Boulder Co Tear-off and reroof of a retail establishment -- 245 squares on a inchflatinch pitch (less than 1 4inch per foot). Pre-roof and mid-roof inspections required -- tpo membrane over 1 2inch densedeck over polyiso insulation. Date: May 4, 2012 Contractor: Douglass Colony Group Inc Client: Investors Tuff | Applicant: Douglass Colony Group, Inc | Permit type: Roofing | Permit status: Cmp | Completion date: August 1, 2012 | Current use: Commercial/reta | |||||
SCORE 100 56 Sioux Dr Boulder Co Partial tear off and reroof of existing rec center roof. Membrane replacement, installation of 5 8inch dens deck firestone . Mil epdm, 1 squares, flat roof pitch as indicated on permit application. Date: June 12, 2012 Contractor: Douglass Colony Group Inc Client: Municipal Boulder | Applicant: Douglass Colony Group, Inc | Permit type: Roofing | Permit status: Cmp | Completion date: September 6, 2012 | Current use: Government uses | |||||
SCORE 100 1805 33rd St Boulder Co Total tear off and reroof of existing public safety building. 3inch iso, mil epdm, 5 8inch dens deck, 292 squares, flat roof as indicated on permit application Date: June 12, 2012 Contractor: Douglass Colony Group Inc Client: Municipal Boulder | Applicant: Douglass Colony Group, Inc | Permit type: Roofing | Permit status: Cmp | Completion date: October 5, 2012 | Current use: Government uses | |||||
SCORE 100 49 Pearl St Boulder Co Partial tear off and reroof of existing city building, 1 4inch dens deck, mil tpo fully adhered, 43 squares, flat roof as indicated on permit application Date: June 12, 2012 Contractor: Douglass Colony Group Inc Client: Of City | Applicant: Douglass Colony Group, Inc | Permit type: Roofing | Permit status: Cmp | Completion date: September 11, 2012 | Current use: Government uses | |||||
SCORE 100 1585 30th St Boulder Co Total tear off and reroof of existing fire station. Ice and water sheild at eaves, lb felt, gaf 30-yr shingles, 43 squares, 3 12 pitch as indicated on permit application Date: June 12, 2012 Contractor: Douglass Colony Group Inc Client: Of City | Applicant: Douglass Colony Group, Inc | Permit type: Roofing | Permit status: Cmp | Completion date: July 23, 2012 | Current use: Government uses | |||||
SCORE 100 Completion date: April 26, 2011 | Expiration date: March 22, 2012 | Permit id: 2010p09190 | |||||
SCORE 100 16 Commerce St Boulder Co Total tear-off and reroof of an existing office building, 177 squares of modified bitumen on a pitch represented as 0. 25 12. All roof materials shall be installed per manufacturerfoots specs. Mid-roof inspection required if pitch is less than 4 12. Client: Corporatio Ball | Permit type: Roofing | Permit status: Iss | Current use: Office - technical, existing | Permit id: Pmt2016-03361 | |||||
SCORE 100 8 Pearl St B Boulder Co Total tear-off and reroof of two seperate structures originally permitted as one building in 2009. Use is both residential and commercial. Both structures to have flat, 1 4inch per ft, roofs. Replacing insulation, 2inch polyisocyanurate with an r-value of 12. All roof materials shall be installed per manufacturerfoots specs. Mid-roof inspection required if pitch is less than 4 12. Client: Gordon Reinert | Permit type: Roofing | Permit status: Iss | Current use: Multifamily dwellings, existing | Permit id: Pmt2016-05175 | |||||
SCORE 100 24 49th St Boulder Co Remove existing roofing and re-roof auto dealership building with 45 mil tpo. 227 squares, flat roof (1 4:1) roof pitch. Client: Gebhardt Chapman | Permit type: Roofing | Permit status: Cmp | Completion date: December 19, 2013 | Current use: Commercial/retail, existing | Permit id: Pmt2013-04650 | |||||
SCORE 100 49 Moorhead Av Boulder Co Installation of 129 kw rooftop, photovoltaic solar system. Tilt mounted installation of residential building, and flush mounted installation of three detached carport. Client: Of City | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 11, 2014 | Current use: Multifamily dwellings, existing | Permit id: Pmt2014-00590 | |||||
SCORE 100 17 15th St Boulder Co Installation of rooftop, 45. 9 kw, 10-degree tilt mounted photovoltaic solar energy system on the liquor mart building. Client: Investors Tuff | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 2, 2014 | Current use: Commercial/retail, existing | Permit id: Pmt2012-05199 | |||||
SCORE 100 Date: July 29, 2010 Contractor: Douglass Colony Group Inc Client: Broadway Twenty-Sixty | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2010-03138 | |||||
SCORE 100 1909 26th St 1a Boulder Co Roofing permit - for reroof of commercial office building 45 squares on flat roof with firestone mil tpo. Client: Barrett Foster | Permit type: Roofing | Permit status: Cmp | Completion date: May 25, 2011 | Current use: Office - professional, existing | Permit id: Pmt2010-04625 | |||||
SCORE 100 3838 Orion Ct Boulder Co Total tear off and reroof of existing single family dwelling. Gaf-elk timberline 30-yr asphalt shingles, 14 squares, 4 12 pitch as indicated on permit application. Client: Robert Imeson | Permit type: Roofing | Permit status: Cmp | Completion date: January 14, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-05375 | |||||
SCORE 100 5605 N 63rd St Boulder Co Cob water treatment plant -- inchcirculation & clarifier buildinginch existing ballasted roof to be removed, remove membrane layer, add new membrane layer over existing eps insulation, lay old membrane over new membrane, reinstall a portion of the ballast. 12 lbs square foot of ballast material to be permanently removed to compensate for proposed solar array (12 lbs sf) to be installed by separate permit at a later date. Pre-reroof inspection required. Positive drainage of roof required (scuppers) Client: Of City | Permit type: Roofing | Permit status: Cmp | Completion date: January 16, 2014 | Current use: Government uses, existing | Permit id: Pmt2011-02580 | |||||
SCORE 100 7088 Winchester Cr Boulder Co Existing built-up roofing system (larger office building on parcel)-- 326 squares on a inchflatinch roof. Drainage through interior drains & scuppers. Remove gravel, add 2. 5inch iso, epdm membrane and ballast over concrete deck. Pre-reroof inspection required. Client: Motion Micro | Permit type: Roofing | Permit status: Iss | Current use: Manufacturing, existing | Permit id: Pmt2011-02606 | |||||
SCORE 100 63 Diagonal Hy Boulder Co Building #8 (warehouse) -- tear-off and reroof. Fully adhered epdm on 865 squares on a low slope roof -- drainage through interior drains & overflows. Pre-reroof inspection required. Mid-roof insepction required. Client: Business International | Permit type: Roofing | Permit status: Cmp | Completion date: January 8, 2014 | Current use: Warehousing, existing | Permit id: Pmt2011-02821 | |||||
SCORE 100 1925 30th St Boulder Co Stock roof with pv materials with crane. (notice: walnut st w of 30th not city row. Must have macerich ok for any traffic impact.) Date: October 10, 2011 Contractor: Douglass Colony Group Inc Client: Level | Permit type: Right-of-way | Permit status: Iss | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-04320 | |||||
SCORE 100 19 15th St Boulder Co Total tear off and re-roof, commercial building, epdm, 115 squares, contractor indicates 1 2inch 12inch pitch. Client: And Walnut | Permit type: Roofing | Permit status: Cmp | Completion date: December 15, 2015 | Current use: Commercial/retail, existing | Permit id: Pmt2015-02038 | |||||
SCORE 100 29 Pearl St Boulder Co Installation of a 131. 95 kw rooftop photovoltaic array on degree ballasted racking at the goggle campus. Building has two meters, so the system consists of two 65. 97 kw arrays. Client: Inc Google | Permit type: Photovoltaic | Permit status: Iss | Current use: Office - professional, existing | Permit id: Pmt2017-00807 | |||||
SCORE 100 Date: July 29, 2010 Contractor: Douglass Colony Group Inc Client: Broadway Twenty-Sixty | Applicant: Douglass Colony Group Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 1909 26th St 1a Boulder Co Roofing permit - for reroof of commercial office building 45 squares on flat roof with firestone mil tpo. Date: October 22, 2010 Contractor: Douglass Colony Group Inc Client: Barrett Foster,Elyse Foster | Applicant: Douglass Colony Group Inc | Permit type: Roofing | Permit status: Cmp | Completion date: May 25, 2011 | Current use: Office - profes | |||||
SCORE 100 3838 Orion Ct Boulder Co Total tear off and reroof of existing single family dwelling. Gaf-elk timberline 30-yr asphalt shingles, 14 squares, 4 12 pitch as indicated on permit application. Date: December 3, 2010 Contractor: Douglass Colony Group Inc Client: Robert Imeson | Applicant: Douglass Colony Group Inc | Permit type: Roofing | Permit status: Cmp | Completion date: January 14, 2014 | Current use: Single family d | |||||
SCORE 100 5605 N 63rd St Boulder Co Cob water treatment plant -- inchcirculation & clarifier buildinginch existing ballasted roof to be removed, remove membrane layer, add new membrane layer over existing eps insulation, lay old membrane over new membrane, reinstall a portion of the ballast. 12 lbs square foot of ballast material to be permanently removed to compensate for proposed solar array (12 lbs sf) to be installed by separate permit at a later date. Pre-reroof inspection required. Positive drainage of roof required (scuppers) Date: June 21, 2011 Contractor: Douglass Colony Group Inc Client: Of City | Applicant: Douglass Colony Group Inc | Permit type: Roofing | Permit status: Cmp | Completion date: January 16, 2014 | Current use: Government uses | |||||
SCORE 100 7088 Winchester Cr Boulder Co Existing built-up roofing system (larger office building on parcel)-- 326 squares on a inchflatinch roof. Drainage through interior drains & scuppers. Remove gravel, add 2. 5inch iso, epdm membrane and ballast over concrete deck. Pre-reroof inspection required. Date: June 22, 2011 Contractor: Douglass Colony Group Inc Client: Motion Micro | Applicant: Douglass Colony Group Inc | Permit type: Roofing | Permit status: Iss | Current use: Manufacturing, | |||||
SCORE 100 63 Diagonal Hy Boulder Co Building #8 (warehouse) -- tear-off and reroof. Fully adhered epdm on 865 squares on a low slope roof -- drainage through interior drains & overflows. Pre-reroof inspection required. Mid-roof insepction required. Date: July 6, 2011 Contractor: Douglass Colony Group Inc Client: Business International | Applicant: Douglass Colony Group Inc | Permit type: Roofing | Permit status: Cmp | Completion date: January 8, 2014 | Current use: Warehousing, ex | |||||
SCORE 100 1925 30th St Boulder Co Stock roof with pv materials with crane. (notice: walnut st w of 30th not city row. Must have macerich ok for any traffic impact.) Date: October 10, 2011 Contractor: Douglass Colony Group Inc Client: Level 2nd | Applicant: Douglass Colony Group Inc | Permit type: Right-of-way | Permit status: Iss | Current use: Multifamily dwe | |||||
SCORE 100 17 15th St Boulder Co Installation of rooftop, 45. 9 kw, 10-degree tilt mounted photovoltaic solar energy system on the liquor mart building. Date: December 18, 2012 Contractor: Douglass Colony Group Inc Client: Investors Tuff | Applicant: Douglass Colony Group Inc | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 2, 2014 | Current use: Commercial/reta | |||||
SCORE 100 24 49th St Boulder Co Remove existing roofing and re-roof auto dealership building with 45 mil tpo. 227 squares, flat roof (1 4:1) roof pitch. Date: September 17, 2013 Contractor: Douglass Colony Group Inc Client: Gebhardt Chapman | Applicant: Douglass Colony Group Inc | Permit type: Roofing | Permit status: Cmp | Completion date: December 19, 2013 | Current use: Commercial/reta | |||||
SCORE 100 49 Moorhead Av Boulder Co Installation of 129 kw rooftop, photovoltaic solar system. Tilt mounted installation of residential building, and flush mounted installation of three detached carport. Date: March 25, 2014 Contractor: Douglass Colony Group Inc Client: Of City | Applicant: Douglass Colony Group Inc | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 11, 2014 | Current use: Multifamily dwe | |||||
SCORE 100 19 15th St Boulder Co Total tear off and re-roof, commercial building, epdm, 115 squares, contractor indicates 1 2inch 12inch pitch. Date: May 27, 2015 Contractor: Douglass Colony Group Inc Client: And Walnut | Applicant: Douglass Colony Group Inc | Permit type: Roofing | Permit status: Iss | Current use: Commercial/reta | |||||
SCORE 100 Permit type: Repair | Permit status: Closed | Completion date: April 26, 2011 | Current use: Non-residential | Permit id: 2010p09190 | |||||
SCORE 100 Permit type: Commercial remodel | Permit status: Permit closed | Completion date: April 23, 2012 | Permit id: Bp-12-0245 | |||||
SCORE 100 Permit type: Commercial remodel | Permit status: Permit closed | Completion date: April 20, 2012 | Permit id: Bp-12-0107 |