Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Construction staging area, including new fencing and construction trailer in association with a new (133-unit 9-floor apartment building with provided 39 parking spaces & 39 bike racks at ground level) construction at 43 k street, nw. As per building permit #b1212083 - 10/22/2012. Date: April 25, 2013 Client: Dc Government | Applicant: Leon Paul | Permit type: Fence | Permit status: Permit issued | Permit id: F1300279 | |||||
SCORE 99 Construction staging area, including new fencing and construction trailer in association with a new (133-unit 9-floor apartment building with provided 39 parking spaces & 39 bike racks at ground level) construction at 43 k street, nw. As per building permit #b1212083 - 10/22/2012. Date: April 25, 2013 Contractor: Leon Paul Client: Dc Government | Permit type: Fence | Permit status: Permit issued | Permit id: F1300279 | |||||
We propose to perform the spt borings in accordance with astm d-1586 using a trailer-mounted mobile b-47 hd or a geoprobe 7822 dt track mounted drill rig. We will be drilling 3. 25 inch id, borings to a depth of feet (b1-b6). Date: May 27, 2016 Client: District Of Columbia | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1600249 | |||||
We propose to perform the spt borings in accordance with astm d-1586 using a trailer-mounted mobile b-47 hd or a geoprobe 7822 dt track mounted drill rig. We will be drilling 3. 25 inch id, borings to a depth of feet (b1-b6). Date: May 27, 2016 Client: District Of Columbia | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1600249 | |||||
We propose to perform the spt borings in accordance with astm d-1586 using a trailer-mounted mobile b-47 hd or a geoprobe 7822 dt track mounted drill rig. We will be drilling 3. 25 inch id, borings to a depth of feet (b1-b6). Date: May 27, 2016 Client: District Of Columbia | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1600249 | |||||
SCORE 56 Using hollow stem auger method, we will drill 1 soil boring for geotechnical investigative purposes to a depth of feet below the existing ground surface. Upon completion, borehole will be grouted with a 60: ratio of bentonite powder to water if the boring is in a paved area. If the boring is offset to a grassed area, the borehole will be grouted with 2 pounds of bentonite powder to 1 gallon of water. All spoils will be containerized in 55 gallon drums and removed from the site upon the results of environmental classification. Date: January 31, 2017 Client: Potomac Electric Power Company | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1700114 |